X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665241902020

Well Details

Well ID: 0665241902020
Loading map...
Location: 02/02-19-066-24W5/0
Location Alias: 02/02-19-66-24 W5M
Location Alias 2: 02/02-19-066-24 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 24
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ ANTE 2-19-66-24
Operator Name: ARC Resources Ltd.
License Number: 0437383
License Date: 2011-10-03
License Status: Issued
Spud Date: 2011-10-12
Final Drill Date: 2011-10-22
Well Total Depth: 3017.00 m
Surface Hole Latitude: 54.728532
Surface Hole Longitude: -117.628519

For data sources see[1][2]

Well History

Date Event
2011-10-03 Obtained License
2011-10-13 Surface Casing Operation Performed
2011-10-14 Well Log Performed
2011-10-16 Direction Drilling Operation Performed - Horizontal
2011-10-19 Intermediate Casing Operation Performed
2011-10-19 Well Log Performed
2011-10-20 Well Log Performed
2011-10-22 Finished Drilling
2011-10-22 Well Log Performed
2011-10-22 Well Mode changed to Drilled and Cased
2011-10-24 Liner Casing Operation Performed
2011-10-25 Rig Released
2011-11-24 Well Log Performed
2011-11-25 Well Log Performed
2011-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2011-12-01 Perforation Treatment Performed - Open-Hole Completion
2012-06-13 Well Began Production
2012-06-13 Well Fluid changed to Crude Oil
2012-06-13 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-16 1622.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-01 Open Hole/Barefoot Completion 2166.00 3017.00 0
2011-12-01 Multi-Stage Fracture 2580.30 2630.80 0
2011-12-01 Multi-Stage Fracture 2630.80 2681.30 0
2011-12-01 Multi-Stage Fracture 2681.30 2743.20 0
2011-12-01 Multi-Stage Fracture 2743.20 2793.50 0
2011-12-01 Multi-Stage Fracture 2793.50 2855.20 0
2011-12-01 Multi-Stage Fracture 2855.20 2905.60 0
2011-12-01 Multi-Stage Fracture 2905.60 2967.80 0
2011-12-01 Multi-Stage Fracture 2905.60 3017.00 0
2011-12-01 Multi-Stage Fracture 2166.00 2216.40 0
2011-12-01 Multi-Stage Fracture 2216.40 2266.40 0
2011-12-01 Multi-Stage Fracture 2266.40 2317.00 0
2011-12-01 Multi-Stage Fracture 2317.00 2367.70 0
2011-12-01 Multi-Stage Fracture 2367.70 2417.80 0
2011-12-01 Multi-Stage Fracture 2417.80 2468.10 0
2011-12-01 Multi-Stage Fracture 2468.10 2530.00 0
2011-12-01 Multi-Stage Fracture 2530.00 2580.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4003 0.0 0.0 0.0
2013 8111 0.0 0.0 0.0
2014 8279 0.0 0.0 0.0
2015 8459 0.0 0.0 0.0
2016 8503 0.0 0.0 0.0
2017 7739 0.0 0.0 0.0
2018 6923 0.0 0.0 0.0
2019 6311 0.0 0.0 0.0
2020 1250 0.0 0.0 0.0

For data sources see[6]

References