If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0665240707020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.701008,"lon":-117.633707,"icon":""}]} |
Location: 02/07-07-066-24W5/0 | |
Location Alias: 02/07-07-66-24 W5M | |
Location Alias 2: 02/07-07-066-24 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 5 | |
Range: 24 | |
Section: 07 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ARC HZ 102 ANTE 7-7-66-24 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0420808 | |
License Date: 2010-06-01 | |
License Status: Suspension | |
Spud Date: 2010-07-03 | |
Final Drill Date: 2010-07-16 | |
Well Total Depth: 3127.00 m | |
Surface Hole Latitude: 54.701008 | |
Surface Hole Longitude: -117.633707 |
Date | Event |
---|---|
2010-06-01 | Obtained License |
2010-07-05 | Surface Casing Operation Performed |
2010-07-07 | Well Log Performed |
2010-07-08 | Direction Drilling Operation Performed - Horizontal |
2010-07-10 | Well Log Performed |
2010-07-12 | Intermediate Casing Operation Performed |
2010-07-16 | Finished Drilling |
2010-07-16 | Well Log Performed |
2010-07-16 | Well Mode changed to Drilled and Cased |
2010-07-18 | Liner Casing Operation Performed |
2010-07-19 | Rig Released |
2010-07-29 | Well Log Performed |
2010-09-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-09-11 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-28 | Well Began Production |
2011-02-28 | Well Fluid changed to Crude Oil |
2011-02-28 | Well Mode changed to Pumping |
2015-07-01 | Well Fluid changed to Crude Oil |
2015-07-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-07-08 | 1662.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-11 | Open Hole/Barefoot Completion | 2201.00 | 3127.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 2201.00 | 2333.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 2334.00 | 2455.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 2456.00 | 2589.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 2590.00 | 2721.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 2722.00 | 2854.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 2855.00 | 2975.00 | 0 |
2010-09-11 | Multi-Stage Fracture | 2976.00 | 3127.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6388 | 0.0 | 0.0 | 0.0 |
2012 | 2414 | 0.0 | 0.0 | 0.0 |
2013 | 1296 | 0.0 | 0.0 | 0.0 |
For data sources see[6]