X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665131411000

Well Details

Well ID: 0665131411000
Loading map...
Location: 00/11-14-066-13W5/0
Location Alias: 00/11-14-66-13 W5M
Location Alias 2: 00/11-14-066-13 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 13
Section: 14
County/Municipality: Big Lakes County
Well Name: CPEC VIRG 11-14-66-13
Operator Name: Crescent Point Energy Corp.
License Number: 0109245
License Date: 1984-09-12
License Status: Suspension
Spud Date: 1984-10-07
Final Drill Date: 1984-10-31
Well Total Depth: 2957.00 m
Surface Hole Latitude: 54.714775
Surface Hole Longitude: -115.859122

For data sources see[1][2]

Well History

Date Event
1984-09-12 Obtained License
1984-10-09 Surface Casing Operation Performed
1984-10-27 Drill Stem Test Performed
1984-10-28 Drill Stem Test Performed
1984-10-31 Finished Drilling
1984-11-01 Well Log Performed
1984-11-06 Production Casing Operation Performed
1984-11-06 Rig Released
1984-11-06 Well Mode changed to Drilled and Cased
1984-12-04 Well Log Performed
1984-12-07 Well Log Performed
1984-12-08 Perforation Treatment Performed - Jet Perforation
1984-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-12 Well Log Performed
1984-12-13 Perforation Treatment Performed - Cement Squeeze
1984-12-14 Well Log Performed
1984-12-15 Perforation Treatment Performed - Jet Perforation
1984-12-18 Perforation Treatment Performed - Fractured
1985-02-03 Well Began Production
1985-02-03 Well Fluid changed to Crude Oil
1985-02-03 Well Mode changed to Pumping
2016-08-01 Well Fluid changed to Crude Oil
2016-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-08 Perforation 2909.00 2912.00 13
1984-12-08 Perforation 2907.00 2908.00 13
1984-12-10 Acid Treatment 2907.00 2912.00 0
1984-12-11 Acid Treatment 2907.00 2912.00 0
1984-12-13 Cement Squeeze 2907.00 2912.00 0
1984-12-15 Perforation 2887.40 2895.20 13
1984-12-15 Perforation 2885.30 2886.00 13
1984-12-18 Fracture 2885.30 2895.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 5285 0.0 0.0 0.0
1986 7146 0.0 0.0 0.0
1987 8252 0.0 0.0 0.0
1988 8273 0.0 0.0 0.0
1989 8245 0.0 0.0 0.0
1990 8488 0.0 0.0 0.0
1991 8392 0.0 0.0 0.0
1992 8709 0.0 0.0 0.0
1993 8753 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8742 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8595 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8711 0.0 0.0 0.0
2001 6408 0.0 0.0 0.0
2002 8335 0.0 0.0 0.0
2003 8519 0.0 0.0 0.0
2004 8111 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8015 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8040 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8567 0.0 0.0 0.0
2011 8712 0.0 0.0 0.0
2012 8711 0.0 0.0 0.0
2013 8676 0.0 0.0 0.0
2014 8239 0.0 0.0 0.0
2015 2132 0.0 0.0 0.0

For data sources see[5]

References