X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665130202000

Well Details

Well ID: 0665130202000
Loading map...
Location: 00/02-02-066-13W5/0
Location Alias: 00/02-02-66-13 W5M
Location Alias 2: 00/02-02-066-13 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 13
Section: 02
County/Municipality: Big Lakes County
Well Name: DARK ET AL VIRG 2-2-66-13
Operator Name: Dark Energy Ltd.
License Number: 0060121
License Date: 1976-09-10
License Status: RecCertified
Spud Date: 1976-09-24
Final Drill Date: 1976-10-11
Well Total Depth: 2883.40 m
Surface Hole Latitude: 54.678286
Surface Hole Longitude: -115.850090

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-10 Obtained License
1976-10-11 Finished Drilling
1976-10-11 Well Mode changed to Drilled and Cased
1976-10-14 Drill Stem Test Performed
1976-10-15 Production Casing Operation Performed
1976-10-27 Perforation Treatment Performed - Jet Perforation
1976-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-14 Well Began Production
1976-11-14 Well Fluid changed to Crude Oil
1976-11-14 Well Mode changed to Pumping
1977-02-15 Perforation Treatment Performed - Jet Perforation
1977-02-19 Perforation Treatment Performed - Cement Squeeze
1977-02-25 Perforation Treatment Performed - Jet Perforation
1977-02-26 Perforation Treatment Performed - Acid Wash - No Pressure
1977-02-26 Perforation Treatment Performed - Cement Squeeze
1977-12-09 Perforation Treatment Performed - Jet Perforation
1977-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-05 Perforation Treatment Performed - Jet Perforation
1978-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-08 Perforation Treatment Performed - Cement Squeeze
1978-01-14 Perforation Treatment Performed - Jet Perforation
1978-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-07 Perforation Treatment Performed - Jet Perforation
1980-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-31 Well Fluid changed to Crude Oil
1981-08-31 Well Mode changed to Suspended
1983-11-12 Perforation Treatment Performed - Cement Squeeze
1983-11-12 Well Log Performed
1983-11-13 Perforation Treatment Performed - Jet Perforation
1983-11-13 Well Fluid changed to Crude Oil
1983-11-13 Well Mode changed to Abandoned Zone
1984-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-07-11 Plug Back Performed
1984-07-11 Well Abandoned
1984-07-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-10-27 Perforation 2841.30 2845.30 7
1977-12-09 Perforation 2866.90 2867.60 13
1977-12-13 Acid Treatment 2866.90 2867.60 0
1977-12-14 Acid Treatment 2866.90 2867.60 0
1978-01-05 Perforation 2862.70 2863.30 13
1978-01-06 Acid Treatment 2862.70 2863.30 0
1978-01-08 Cement Squeeze 2862.70 2867.60 0
1978-01-14 Perforation 2838.00 2839.80 7
1978-01-15 Acid Treatment 2838.00 2845.30 0
1980-05-07 Perforation 2837.70 2840.10 13
1980-05-07 Perforation 2841.30 2843.20 13
1976-10-27 Perforation 2838.00 2839.80 7
1980-05-07 Perforation 2844.40 2845.00 13
1980-05-08 Acid Treatment 2837.70 2845.30 0
1983-11-12 Cement Squeeze 2837.70 2845.30 0
1983-11-13 Perforation 1685.50 1686.80 13
1984-07-11 Packing Device Capped w/Cement 1655.30 1665.30 0
1976-10-28 Acid Treatment 2838.00 2845.30 0
1976-10-31 Acid Treatment 2838.00 2845.30 0
1977-02-15 Perforation 2870.30 2870.60 16
1977-02-19 Cement Squeeze 2870.30 2870.60 0
1977-02-25 Perforation 2856.90 2857.50 13
1977-02-26 Acid Wash 2856.90 2857.50 0
1977-02-26 Cement Squeeze 2856.90 2857.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 636 0.0 0.0 0.0
1977 824 0.0 0.0 0.0
1978 1860 0.0 0.0 0.0
1979 2350 0.0 0.0 0.0
1980 895 0.0 0.0 0.0

For data sources see[5]

References