X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665110114002

Well Details

Well ID: 0665110114002
Loading map...
Location: 00/14-01-066-11W5/2
Location Alias: 00/14-01-66-11 W5M
Location Alias 2: 00/14-01-066-11 W5/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 11
Section: 01
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 14-1-66-11
Operator Name: Razor Energy Corp.
License Number: 0048739
License Date: 1974-01-22
License Status: Suspension
Spud Date: 1974-01-26
Final Drill Date: 1974-02-10
Well Total Depth: 2682.20 m
Surface Hole Latitude: 54.688378
Surface Hole Longitude: -115.529166

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-01-22 Obtained License
1974-02-10 Finished Drilling
1974-02-10 Well Mode changed to Drilled and Cased
1974-02-14 Production Casing Operation Performed
1974-09-23 Perforation Treatment Performed - Jet Perforation
1980-01-11 Well Began Production
1980-01-11 Well Fluid changed to Crude Oil
1980-01-11 Well Mode changed to Pumping
1982-05-01 Well Structure changed to Commingled
1991-05-29 Well Log Performed
1994-10-29 Perforation Treatment Performed - Jet Perforation
1994-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-29 Perforation Treatment Performed - Chemical Squeeze
1996-07-27 Well Log Performed
1996-07-28 Perforation Treatment Performed - Cement Squeeze
1996-07-31 Well Log Performed
1996-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-05 Perforation Treatment Performed - Jet Perforation
1996-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-07 Perforation Treatment Performed - Jet Perforation
1996-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-23 Perforation 2561.50 2566.10 13
1996-07-28 Cement Squeeze 2570.70 2577.70 0
1996-08-03 Acid Treatment 2561.50 2565.20 0
1996-08-05 Perforation 2561.50 2565.20 13
1996-08-07 Acid Treatment 2561.50 2565.20 0
1996-09-07 Perforation 2570.70 2573.40 13
1996-09-07 Perforation 2575.00 2577.70 13
1996-09-10 Acid Treatment 2570.70 2577.70 0
1974-09-23 Perforation 2570.70 2573.40 13
1974-09-23 Perforation 2575.00 2577.70 13
1974-09-23 Perforation 2591.40 2595.70 13
1974-09-23 Perforation 2603.00 2609.10 13
1974-09-23 Perforation 2611.50 2614.00 13
1994-10-29 Perforation 2561.50 2566.10 13
1994-11-01 Acid Treatment 2561.50 2566.10 0
1996-06-29 Chemical Squeeze 2561.50 2614.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4088 0.0 0.0 0.0
1981 5475 0.0 0.0 0.0
1982 576 0.0 0.0 0.0

For data sources see[5]

References