X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665103104000

Well Details

Well ID: 0665103104000
Loading map...
Location: 00/04-31-066-10W5/0
Location Alias: 00/04-31-66-10 W5M
Location Alias 2: 00/04-31-066-10 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 10
Section: 31
County/Municipality: Big Lakes County
Well Name: CNRL K-3 SWANH 4-31-66-10
Operator Name: Canadian Natural Resources Limited
License Number: 0017850
License Date: 1959-09-29
License Status: Abandoned
Spud Date: 1959-11-14
Final Drill Date: 1959-12-17
Well Total Depth: 2832.50 m
Surface Hole Latitude: 54.750713
Surface Hole Longitude: -115.510905

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-09-29 Obtained License
1959-11-14 Lost Circulation Occurred
1959-12-17 Finished Drilling
1959-12-17 Well Mode changed to Drilled and Cased
1959-12-19 Production Casing Operation Performed
1960-01-02 Perforation Treatment Performed - Jet Perforation
1960-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-07 Perforation Treatment Performed - Cement Squeeze
1960-01-07 Perforation Treatment Performed - Jet Perforation
1960-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-10 Perforation Treatment Performed - Cement Squeeze
1960-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-11 Perforation Treatment Performed - Jet Perforation
1960-01-14 Perforation Treatment Performed - Cement Squeeze
1960-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-15 Perforation Treatment Performed - Jet Perforation
1960-01-25 Perforation Treatment Performed - Jet Perforation
1960-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-05 Well Began Production
1960-02-05 Well Fluid changed to Crude Oil
1960-02-05 Well Mode changed to Flowing
1960-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-03 Perforation Treatment Performed - Jet Perforation
1964-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-22 Well Began Injection
1972-02-22 Well Fluid changed to Water
1972-02-22 Well Type changed to Injection
1984-11-13 Well Log Performed
1985-10-18 Perforation Treatment Performed - Jet Perforation
1985-10-18 Well Log Performed
1985-10-22 Well Log Performed
1986-03-31 Well Log Performed
1986-06-12 Well Log Performed
1996-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-01 Well Fluid changed to Water
2000-04-01 Well Mode changed to Suspended
2000-04-01 Well Type changed to Injection
2003-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-22 Perforation Treatment Performed - Jet Perforation
2003-07-22 Plug Back Performed
2003-07-22 Well Fluid changed to Water
2003-07-22 Well Log Performed
2003-07-22 Well Mode changed to Abandoned Zone
2003-07-22 Well Type changed to Injection
2003-07-23 Perforation Treatment Performed - Remedial Casing
2003-10-02 Well Abandoned
2003-10-02 Well Fluid changed to Water
2003-10-02 Well Mode changed to Abandoned
2003-10-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-02 Perforation 2825.20 2827.00 7
1960-01-15 Perforation 2777.90 2781.00 13
1960-01-15 Acid Treatment 2777.90 2781.00 0
1960-01-25 Perforation 2763.90 2769.40 7
1960-01-26 Acid Treatment 2763.90 2781.00 0
1960-09-10 Acid Treatment 2763.90 2781.00 0
1964-06-03 Perforation 2759.70 2760.90 7
1964-06-03 Perforation 2746.90 2756.00 7
1964-06-03 Perforation 2742.60 2745.60 7
1964-06-03 Perforation 2738.00 2738.90 7
1964-06-03 Perforation 2730.10 2736.50 7
1960-01-03 Acid Treatment 2825.20 2827.00 0
1964-06-06 Acid Treatment 2730.10 2760.90 0
1966-11-15 Acid Treatment 2730.10 2760.90 0
1985-10-18 Perforation 2800.40 2801.60 13
1985-10-18 Perforation 2803.40 2804.80 13
1985-10-18 Perforation 2791.20 2794.30 13
1985-10-18 Perforation 2796.40 2797.40 13
1985-10-18 Perforation 2780.90 2784.60 13
1985-10-18 Perforation 2785.40 2786.70 13
1985-10-18 Perforation 2787.90 2789.10 13
1996-05-16 Acid Treatment 2730.10 2804.80 0
1960-01-07 Cement Squeeze 2825.20 2827.00 0
2003-07-22 Packing Device Capped w/Cement 2666.40 2674.40 0
2003-07-22 Perforation 600.00 601.00 14
2003-07-23 Remedial Casing Cementing 600.00 601.00 0
1960-01-07 Perforation 2800.50 2801.70 13
1960-01-08 Acid Treatment 2800.50 2801.70 0
1960-01-10 Cement Squeeze 2800.50 2801.70 0
1960-01-11 Perforation 2788.30 2791.10 13
1960-01-11 Acid Treatment 2788.30 2791.10 0
1960-01-14 Cement Squeeze 2788.30 2791.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 80 0.0 0.0 0.0
1969 1358 0.0 0.0 0.0
1970 275 0.0 0.0 0.0
1971 1453 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1959-11-14 Lost Circulation 9.10 12.10

For data sources see[6]

References