X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665103010000

Well Details

Well ID: 0665103010000
Loading map...
Location: 00/10-30-066-10W5/0
Location Alias: 00/10-30-66-10 W5M
Location Alias 2: 00/10-30-066-10 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 10
Section: 30
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 10-30-66-10
Operator Name: Canadian Natural Resources Limited
License Number: 0017830
License Date: 1959-09-28
License Status: Issued
Spud Date: 1959-11-20
Final Drill Date: 1959-12-17
Well Total Depth: 2766.10 m
Surface Hole Latitude: 54.743209
Surface Hole Longitude: -115.497745

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-09-28 Obtained License
1959-12-17 Finished Drilling
1959-12-17 Well Mode changed to Drilled and Cased
1959-12-18 Production Casing Operation Performed
1959-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-21 Perforation Treatment Performed - Jet Perforation
1959-12-31 Well Began Production
1959-12-31 Well Fluid changed to Crude Oil
1959-12-31 Well Mode changed to Flowing
1968-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-03-07 Perforation Treatment Performed - Jet Perforation
1968-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-03-26 Perforation Treatment Performed - Jet Perforation
1973-12-08 Perforation Treatment Performed - Jet Perforation
1973-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-14 Well Fluid changed to Crude Oil
1973-12-14 Well Mode changed to Pumping
1977-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-08 Perforation Treatment Performed - Cement Squeeze
1977-09-14 Perforation Treatment Performed - Jet Perforation
1998-12-03 Well Fluid changed to Crude Oil
1998-12-03 Well Mode changed to Suspended
2000-03-19 Well Log Performed
2000-03-21 Perforation Treatment Performed - Jet Perforation
2000-03-25 Well Log Performed
2000-03-26 Perforation Treatment Performed - Jet Perforation
2000-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-03 Well Log Performed
2000-04-04 Perforation Treatment Performed - Cement Squeeze
2000-04-10 Well Log Performed
2000-04-11 Perforation Treatment Performed - Jet Perforation
2000-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-14 Well Log Performed
2000-06-01 Well Began Injection
2000-06-01 Well Fluid changed to Solvent
2000-06-01 Well Type changed to Injection
2019-08-31 Well Fluid changed to Solvent
2019-08-31 Well Mode changed to Suspended
2019-08-31 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-21 Perforation 2715.20 2718.20 7
1973-12-08 Perforation 2667.60 2668.20 7
1973-12-08 Perforation 2661.50 2662.70 7
1973-12-09 Acid Treatment 2661.50 2707.80 0
1977-01-03 Acid Treatment 2661.50 2707.80 0
1977-09-08 Cement Squeeze 2661.50 2718.20 0
1977-09-14 Perforation 2708.50 2716.40 7
1977-09-14 Perforation 2719.40 2720.60 7
1977-09-14 Perforation 2725.50 2726.10 7
1977-09-14 Perforation 2727.70 2728.90 7
2000-03-21 Perforation 2666.40 2667.60 20
1959-12-21 Acid Treatment 2715.20 2718.20 0
2000-03-21 Perforation 2671.90 2673.10 20
2000-03-21 Perforation 2676.80 2678.90 20
2000-03-21 Perforation 2686.20 2687.60 20
2000-03-21 Perforation 2696.90 2698.10 20
2000-03-21 Perforation 2705.70 2707.70 20
2000-03-21 Perforation 2715.50 2717.70 20
2000-03-26 Perforation 2661.00 2662.50 20
2000-03-26 Perforation 2681.60 2682.50 20
2000-03-26 Perforation 2687.60 2692.60 20
2000-03-26 Perforation 2698.70 2699.30 20
1968-03-07 Perforation 2688.00 2689.30 7
2000-03-26 Perforation 2703.00 2704.00 20
2000-03-26 Perforation 2720.30 2721.30 20
2000-03-30 Acid Treatment 2661.00 2728.90 0
2000-04-02 Acid Treatment 2671.90 2673.10 0
2000-04-04 Cement Squeeze 2661.00 2673.10 0
2000-04-11 Perforation 2671.90 2673.10 20
2000-04-11 Perforation 2666.40 2667.60 20
2000-04-11 Perforation 2661.00 2662.00 20
2000-04-11 Perforation 2663.50 2665.30 20
2000-04-13 Acid Treatment 2671.90 2673.70 0
1968-03-07 Perforation 2678.00 2678.60 7
1968-03-07 Acid Treatment 2678.00 2689.30 0
1968-03-26 Perforation 2664.00 2665.20 7
1968-03-26 Acid Treatment 2664.00 2665.20 0
1973-12-08 Perforation 2697.50 2698.10 7
1973-12-08 Perforation 2706.00 2707.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 6025 0.0 0.0 0.0
1969 8507 0.0 0.0 0.0
1970 4305 0.0 0.0 0.0
1971 7079 0.0 0.0 0.0
1972 431 0.0 0.0 0.0
1973 303 0.0 0.0 0.0
1974 1711 0.0 0.0 0.0
1975 2518 0.0 0.0 0.0
1976 1675 0.0 0.0 0.0
1977 3358 0.0 0.0 0.0
1978 8037 0.0 0.0 0.0
1979 6629 0.0 0.0 0.0
1980 8682 0.0 0.0 0.0
1981 7475 0.0 0.0 0.0
1982 8229 0.0 0.0 0.0
1983 8478 0.0 0.0 0.0
1984 8717 0.0 0.0 0.0
1985 8403 0.0 0.0 0.0
1986 8607 0.0 0.0 0.0
1987 8668 0.0 0.0 0.0
1988 7683 0.0 0.0 0.0
1989 8540 0.0 0.0 0.0
1990 8032 0.0 0.0 0.0
1991 8342 0.0 0.0 0.0
1992 8258 0.0 0.0 0.0
1993 7463 0.0 0.0 0.0
1994 8371 0.0 0.0 0.0
1995 7825 0.0 0.0 0.0
1996 8175 0.0 0.0 0.0
1997 8375 0.0 0.0 0.0
1998 6676 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References