X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665102902000

Well Details

Well ID: 0665102902000
Loading map...
Location: 00/02-29-066-10W5/0
Location Alias: 00/02-29-66-10 W5M
Location Alias 2: 00/02-29-066-10 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 10
Section: 29
County/Municipality: Big Lakes County
Well Name: CNRL SWANH 2-29-66-10
Operator Name: Canadian Natural Resources Limited
License Number: 0017564
License Date: 1959-08-12
License Status: Suspension
Spud Date: 1959-08-14
Final Drill Date: 1959-09-08
Well Total Depth: 2738.90 m
Surface Hole Latitude: 54.736002
Surface Hole Longitude: -115.472539

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-12 Obtained License
1959-09-08 Finished Drilling
1959-09-08 Well Mode changed to Drilled and Cased
1959-09-09 Production Casing Operation Performed
1959-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-11 Perforation Treatment Performed - Jet Perforation
1959-09-15 Well Began Production
1959-09-15 Well Fluid changed to Crude Oil
1959-09-15 Well Mode changed to Flowing
1971-01-21 Perforation Treatment Performed - Jet Perforation
1971-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-18 Well Fluid changed to Crude Oil
1973-12-18 Well Mode changed to Pumping
1975-11-17 Perforation Treatment Performed - Cement Squeeze
1975-11-22 Perforation Treatment Performed - Jet Perforation
1975-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-26 Perforation Treatment Performed - Jet Perforation
1981-01-27 Perforation Treatment Performed - Fractured
1985-10-28 Perforation Treatment Performed - Jet Perforation
1985-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-25 Perforation Treatment Performed - Jet Perforation
1990-02-25 Well Log Performed
1990-02-26 Perforation Treatment Performed - Jet Perforation
1990-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-21 Well Log Performed
1991-08-14 Well Began Injection
1991-08-14 Well Fluid changed to Solvent
1991-08-14 Well Type changed to Injection
1991-08-21 Well Log Performed
1991-12-12 Well Log Performed
1993-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-30 Well Fluid changed to Solvent
2011-09-30 Well Mode changed to Suspended
2011-09-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-11 Perforation 2674.90 2678.00 7
1971-01-21 Perforation 2625.90 2632.30 3
1971-01-22 Acid Treatment 2625.90 2663.00 0
1975-11-17 Cement Squeeze 2625.90 2678.00 0
1975-11-22 Perforation 2667.00 2674.30 3
1975-11-23 Acid Treatment 2667.00 2674.30 0
1976-12-07 Acid Treatment 2667.00 2674.30 0
1981-01-26 Perforation 2675.50 2678.50 7
1981-01-26 Perforation 2667.00 2674.30 7
1981-01-27 Fracture 2667.00 2678.50 0
1985-10-28 Perforation 2621.30 2624.30 13
1959-09-11 Acid Treatment 2674.90 2678.00 0
1985-10-28 Perforation 2619.40 2621.30 13
1985-11-01 Acid Treatment 2619.40 2624.30 0
1985-11-02 Acid Treatment 2619.40 2624.30 0
1990-02-25 Perforation 2638.30 2641.40 7
1990-02-25 Perforation 2642.90 2644.10 7
1990-02-25 Perforation 2646.00 2650.20 7
1990-02-25 Perforation 2651.50 2656.00 7
1990-02-25 Perforation 2657.20 2660.90 7
1990-02-25 Perforation 2665.20 2667.90 7
1990-02-25 Perforation 2696.00 2697.50 13
1971-01-21 Perforation 2662.10 2663.00 7
1990-02-25 Perforation 2702.10 2705.10 13
1990-02-25 Perforation 2707.50 2708.50 13
1990-02-26 Perforation 2626.50 2631.90 7
1990-02-26 Perforation 2632.90 2635.60 7
1990-02-27 Acid Treatment 2619.40 2708.50 0
1993-11-06 Acid Treatment 2619.40 2708.50 0
1971-01-21 Perforation 2655.70 2661.50 7
1971-01-21 Perforation 2651.50 2656.00 7
1971-01-21 Perforation 2645.10 2650.50 7
1971-01-21 Perforation 2642.90 2644.40 7
1971-01-21 Perforation 2638.30 2642.00 7
1971-01-21 Perforation 2633.50 2635.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7453 0.0 0.0 0.0
1968 7119 0.0 0.0 0.0
1969 4442 0.0 0.0 0.0
1970 6059 0.0 0.0 0.0
1971 8088 0.0 0.0 0.0
1972 8462 0.0 0.0 0.0
1973 8182 0.0 0.0 0.0
1974 6518 0.0 0.0 0.0
1975 4889 0.0 0.0 0.0
1976 8554 0.0 0.0 0.0
1977 8064 0.0 0.0 0.0
1978 8525 0.0 0.0 0.0
1979 8572 0.0 0.0 0.0
1980 8688 0.0 0.0 0.0
1981 6290 0.0 0.0 0.0
1982 8422 0.0 0.0 0.0
1983 8646 0.0 0.0 0.0
1984 8596 0.0 0.0 0.0
1985 7925 0.0 0.0 0.0
1986 8646 0.0 0.0 0.0
1987 8421 0.0 0.0 0.0
1988 8384 0.0 0.0 0.0
1989 7568 0.0 0.0 0.0
1990 3903 0.0 0.0 0.0
1991 1149 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0

For data sources see[5]

References