X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665102304000

Well Details

Well ID: 0665102304000
Loading map...
Location: 00/04-23-066-10W5/0
Location Alias: 00/04-23-66-10 W5M
Location Alias 2: 00/04-23-066-10 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 10
Section: 23
County/Municipality: Swan Hills
Well Name: CNRL UNIT SWANH 4-23-66-10
Operator Name: Canadian Natural Resources Limited
License Number: 0017299
License Date: 1959-06-23
License Status: Suspension
Spud Date: 1959-07-01
Final Drill Date: 1959-07-23
Well Total Depth: 2682.20 m
Surface Hole Latitude: 54.721147
Surface Hole Longitude: -115.409362

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-23 Obtained License
1959-07-23 Finished Drilling
1959-07-23 Well Mode changed to Drilled and Cased
1959-07-25 Production Casing Operation Performed
1959-09-09 Perforation Treatment Performed - Jet Perforation
1959-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-16 Well Began Production
1959-09-16 Well Fluid changed to Crude Oil
1959-09-16 Well Mode changed to Flowing
1960-01-14 Perforation Treatment Performed - Acid Wash - No Pressure
1960-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-17 Well Fluid changed to Crude Oil
1960-01-17 Well Mode changed to Pumping
1962-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-25 Well Began Injection
1974-01-25 Well Fluid changed to Water
1974-01-25 Well Type changed to Injection
2001-11-30 Well Fluid changed to Water
2001-11-30 Well Mode changed to Suspended
2001-11-30 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-09 Perforation 2629.20 2631.90 13
1959-09-09 Perforation 2634.10 2640.20 13
1959-09-14 Acid Treatment 2629.20 2640.20 0
1960-01-14 Acid Wash 2629.20 2640.20 0
1960-01-15 Acid Treatment 2629.20 2640.20 0
1962-09-07 Acid Treatment 2629.20 2640.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References