X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664261106022

Well Details

Well ID: 0664261106022
Loading map...
Location: 02/06-11-066-26W4/2
Location Alias: 02/06-11-66-26 W4M
Location Alias 2: 02/06-11-066-26 W4/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 26
Section: 11
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: AMOCO BIG BEND 6-11-66-26
Operator Name: BP Canada Energy Group ULC
License Number: 0052803
License Date: 1975-02-07
License Status: RecCertified
Spud Date: 1975-02-16
Final Drill Date: 1975-02-18
Well Total Depth: 640.10 m
Surface Hole Latitude: 54.692900
Surface Hole Longitude: -113.828147

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-07 Obtained License
1975-02-18 Finished Drilling
1975-02-18 Well Mode changed to Drilled and Cased
1975-02-20 Production Casing Operation Performed
1975-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-12 Perforation Treatment Performed - Jet Perforation
1986-07-05 Perforation Treatment Performed - Jet Perforation
1986-07-05 Well Log Performed
1986-07-17 Well Began Production
1986-07-17 Well Fluid changed to Gas
1986-07-17 Well Mode changed to Flowing
2000-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-21 Plug Back Performed
2000-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-08 Well Abandoned
2000-07-08 Well Fluid changed to Gas
2000-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-12 Perforation 607.50 609.60 7
1975-03-12 Acid Treatment 607.50 609.60 0
1986-07-05 Perforation 613.20 614.40 0
1986-07-05 Perforation 610.50 612.00 0
1986-07-05 Perforation 566.90 567.90 0
2000-06-21 Packing Device Capped w/Cement 577.00 585.00 0
2000-06-21 Packing Device Capped w/Cement 552.00 560.40 0
2000-06-22 Packing Device Capped w/Cement 541.40 549.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1680 0.0 0.0 0.0
1987 810 0.0 0.0 0.0
1988 227 0.0 0.0 0.0
1993 111 0.0 0.0 0.0
1994 348 0.0 0.0 0.0
1997 253 0.0 0.0 0.0

For data sources see[5]

References