X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664261106020

Well Details

Well ID: 0664261106020
Loading map...
Location: 02/06-11-066-26W4/0
Location Alias: 02/06-11-66-26 W4M
Location Alias 2: 02/06-11-066-26 W4/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 26
Section: 11
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: AMOCO BIG BEND 6-11-66-26
Operator Name: BP Canada Energy Group ULC
License Number: 0052803
License Date: 1975-02-07
License Status: RecCertified
Spud Date: 1975-02-16
Final Drill Date: 1975-02-18
Well Total Depth: 640.10 m
Surface Hole Latitude: 54.692900
Surface Hole Longitude: -113.828147

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-02-07 Obtained License
1975-02-18 Finished Drilling
1975-02-20 Production Casing Operation Performed
1975-02-20 Well Mode changed to Drilled and Cased
1975-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-12 Perforation Treatment Performed - Jet Perforation
1977-12-28 Well Began Production
1977-12-28 Well Fluid changed to Gas
1977-12-28 Well Mode changed to Flowing
1986-07-05 Perforation Treatment Performed - Jet Perforation
1986-07-05 Well Log Performed
1986-07-17 Well Fluid changed to Gas
1986-07-17 Well Mode changed to Flowing
2000-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-21 Plug Back Performed
2000-06-21 Well Fluid changed to Gas
2000-06-21 Well Mode changed to Abandoned Zone
2000-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-03-12 Perforation 607.50 609.60 7
1975-03-12 Acid Treatment 607.50 609.60 0
1986-07-05 Perforation 613.20 614.40 0
1986-07-05 Perforation 610.50 612.00 0
1986-07-05 Perforation 566.90 567.90 0
2000-06-21 Packing Device Capped w/Cement 577.00 585.00 0
2000-06-21 Packing Device Capped w/Cement 552.00 560.40 0
2000-06-22 Packing Device Capped w/Cement 541.40 549.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 84 0.0 0.0 0.0
1978 5966 0.0 0.0 0.0
1979 6018 0.0 0.0 0.0
1980 4882 0.0 0.0 0.0
1981 5305 0.0 0.0 0.0
1982 5278 0.0 0.0 0.0
1983 5664 0.0 0.0 0.0
1984 4737 0.0 0.0 0.0
1986 1445 0.0 0.0 0.0
1987 4522 0.0 0.0 0.0
1988 1118 0.0 0.0 0.0
1993 412 0.0 0.0 0.0
1997 1 0.0 0.0 0.0

For data sources see[5]

References