X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664180508002

Well Details

Well ID: 0664180508002
Loading map...
Location: 00/08-05-066-18W4/2
Location Alias: 00/08-05-66-18 W4M
Location Alias 2: 00/08-05-066-18 W4/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 18
Section: 05
County/Municipality: Athabasca County
Well Name: CARDINAL FLAT 8-5-66-18
Operator Name: Cardinal Energy Ltd.
License Number: 0155273
License Date: 1992-12-21
License Status: Abandoned
Spud Date: 1993-03-12
Final Drill Date: 1993-03-15
Well Total Depth: 595.00 m
Surface Hole Latitude: 54.681411
Surface Hole Longitude: -112.682499

For data sources see[1][2]

Well History

Date Event
1992-12-21 Obtained License
1993-03-12 Surface Casing Operation Performed
1993-03-14 Production Casing Operation Performed
1993-03-14 Well Log Performed
1993-03-15 Finished Drilling
1993-03-15 Perforation Treatment Performed - Open-Hole Completion
1993-03-15 Rig Released
1993-03-15 Well Mode changed to Drilled and Cased
1993-03-16 Well Log Performed
1993-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-12-07 Perforation Treatment Performed - Jet Perforation
1993-12-07 Plug Back Performed
1993-12-07 Well Log Performed
1994-11-16 Well Log Performed
1994-11-17 Well Log Performed
1994-11-18 Perforation Treatment Performed - Jet Perforation
1994-12-01 Well Began Production
1994-12-01 Well Fluid changed to Gas
1994-12-01 Well Mode changed to Flowing
1996-10-01 Well Fluid changed to Gas
1996-10-01 Well Mode changed to Suspended
2000-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-01-10 Plug Back Performed
2000-01-10 Well Fluid changed to Gas
2000-01-10 Well Log Performed
2000-01-10 Well Mode changed to Abandoned Zone
2000-01-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-15 Open Hole/Barefoot Completion 577.20 595.00 0
1993-12-07 Packing Device Capped w/Cement 562.00 570.00 0
1993-12-07 Perforation 466.50 467.50 13
1994-11-18 Perforation 419.00 420.30 14
2000-01-10 Packing Device Capped w/Cement 450.00 458.00 0
2000-01-10 Packing Device Capped w/Cement 390.00 407.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 261 0.0 0.0 0.0
1995 427 0.0 0.0 0.0

For data sources see[5]

References