X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656053510000

Well Details

Well ID: 0656053510000
Loading map...
Location: 00/10-35-065-05W6/0
Location Alias: 00/10-35-65-05 W6M
Location Alias 2: 00/10-35-065-05 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 05
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: PCI NEWAND 10-35-65-5
Operator Name: Suncor Energy Inc.
License Number: 0078299
License Date: 1979-09-27
License Status: Re-Entered
Spud Date: 1979-10-20
Final Drill Date: 1979-12-20
Well Total Depth: 2500.00 m
Surface Hole Latitude: 54.670263
Surface Hole Longitude: -118.637091

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-27 Obtained License
1979-11-17 Drill Stem Test Performed
1979-11-27 Drill Stem Test Performed
1979-12-06 Well Log Performed
1979-12-20 Finished Drilling
1979-12-20 Well Log Performed
1979-12-21 Drill Stem Test Performed
1979-12-22 Liner Casing Operation Performed
1980-02-16 Perforation Treatment Performed - Jet Perforation
1980-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-19 Perforation Treatment Performed - Fractured
1980-02-22 Perforation Treatment Performed - Fractured
1980-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-08 Perforation Treatment Performed - Jet Perforation
1980-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-11 Perforation Treatment Performed - Fractured
1980-03-21 Perforation Treatment Performed - Fractured
1980-03-21 Well Mode changed to Drilled and Cased
1982-01-13 Perforation Treatment Performed - Cement Squeeze
1982-01-17 Perforation Treatment Performed - Jet Perforation
1982-02-01 Perforation Treatment Performed - Cement Squeeze
1982-02-07 Perforation Treatment Performed - Jet Perforation
1982-02-12 Perforation Treatment Performed - Cement Squeeze
1982-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-14 Perforation Treatment Performed - Jet Perforation
1982-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-17 Perforation Treatment Performed - Fractured
1982-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-20 Well Log Performed
1997-03-07 Well Abandoned
1997-03-07 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-16 Perforation 2318.00 2322.00 13
1980-03-11 Fracture 1978.00 1981.50 0
1980-03-21 Fracture 1978.00 1981.50 0
1982-01-13 Cement Squeeze 1978.00 1981.50 0
1982-01-17 Perforation 2318.00 2322.00 13
1982-01-17 Perforation 2313.00 2316.00 13
1982-01-17 Perforation 2307.00 2310.00 13
1982-02-01 Cement Squeeze 2307.00 2310.00 0
1982-02-07 Perforation 2472.50 2482.00 6
1982-02-12 Cement Squeeze 2472.50 2482.00 0
1982-02-13 Packing Device Capped w/Cement 2174.00 2174.00 0
1980-02-16 Perforation 2313.00 2316.00 13
1982-02-14 Perforation 2055.00 2059.00 12
1982-02-15 Acid Treatment 2055.00 2059.00 0
1982-02-17 Fracture 2055.00 2059.00 0
1982-02-19 Packing Device Capped w/Cement 1970.00 1970.00 0
1980-02-16 Perforation 2307.00 2310.00 13
1980-02-17 Acid Treatment 2307.00 2322.00 0
1980-02-19 Fracture 2307.00 2322.00 0
1980-02-22 Fracture 2307.00 2322.00 0
1980-03-07 Packing Device Capped w/Cement 2193.00 2193.00 0
1980-03-08 Perforation 1978.00 1981.50 12
1980-03-09 Acid Treatment 1978.00 1981.50 0

For data sources see[4]



References