If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0655253610002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.684372,"lon":-117.662249,"icon":""}]} |
Location: 00/10-36-065-25W5/2 | |
Location Alias: 00/10-36-65-25 W5M | |
Location Alias 2: 00/10-36-065-25 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 5 | |
Range: 25 | |
Section: 36 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ARC HZ ANTEN 10-36-65-25 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0479649 | |
License Date: 2016-06-13 | |
License Status: Amended | |
Spud Date: 2016-08-06 | |
Final Drill Date: 2016-08-28 | |
Well Total Depth: 4025.00 m | |
Surface Hole Latitude: 54.684372 | |
Surface Hole Longitude: -117.662249 |
Date | Event |
---|---|
2016-06-13 | Obtained License |
2016-08-08 | Surface Casing Operation Performed |
2016-08-09 | Direction Drilling Operation Performed - Deviate |
2016-08-10 | Direction Drilling Operation Performed - Horizontal |
2016-08-22 | Intermediate Casing Operation Performed |
2016-08-27 | Well Log Performed |
2016-08-28 | Finished Drilling |
2016-08-28 | Liner Casing Operation Performed |
2016-08-28 | Rig Released |
2016-08-28 | Well Mode changed to Drilled and Cased |
2016-09-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-09-16 | Well Log Performed |
2016-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-09-27 | Well Began Production |
2016-09-27 | Well Fluid changed to Crude Oil |
2016-09-27 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2016-08-09 | 1578.30 | Deviate (5 - 79 degrees) |
2016-08-10 | 2166.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-09-16 | Multi-Stage Fracture | 3952.30 | 3954.20 | 0 |
2016-09-18 | Multi-Stage Fracture | 3247.30 | 3249.20 | 0 |
2016-09-18 | Multi-Stage Fracture | 3175.70 | 3177.60 | 0 |
2016-09-18 | Multi-Stage Fracture | 3106.00 | 3107.90 | 0 |
2016-09-18 | Multi-Stage Fracture | 3034.30 | 3036.20 | 0 |
2016-09-18 | Multi-Stage Fracture | 2965.20 | 2967.10 | 0 |
2016-09-18 | Multi-Stage Fracture | 2892.80 | 2894.70 | 0 |
2016-09-18 | Multi-Stage Fracture | 2823.00 | 2824.90 | 0 |
2016-09-18 | Multi-Stage Fracture | 2752.50 | 2754.40 | 0 |
2016-09-18 | Multi-Stage Fracture | 2681.00 | 2682.90 | 0 |
2016-09-18 | Multi-Stage Fracture | 2611.90 | 2613.80 | 0 |
2016-09-17 | Multi-Stage Fracture | 3866.80 | 3868.70 | 0 |
2016-09-18 | Multi-Stage Fracture | 2540.70 | 2542.60 | 0 |
2016-09-18 | Multi-Stage Fracture | 2468.70 | 2470.60 | 0 |
2016-09-18 | Multi-Stage Fracture | 2396.80 | 2398.70 | 0 |
2016-09-18 | Multi-Stage Fracture | 2324.70 | 2326.60 | 0 |
2016-09-18 | Multi-Stage Fracture | 2255.60 | 2257.50 | 0 |
2016-09-17 | Multi-Stage Fracture | 3773.70 | 3775.60 | 0 |
2016-09-17 | Multi-Stage Fracture | 3704.70 | 3706.60 | 0 |
2016-09-17 | Multi-Stage Fracture | 3634.80 | 3636.70 | 0 |
2016-09-17 | Multi-Stage Fracture | 3566.30 | 3568.20 | 0 |
2016-09-17 | Multi-Stage Fracture | 3486.00 | 3487.90 | 0 |
2016-09-17 | Multi-Stage Fracture | 3402.90 | 3404.80 | 0 |
2016-09-18 | Multi-Stage Fracture | 3333.30 | 3335.20 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-09-16 | 2016-09-18 | 2,059 | 6,614 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.0766 | N/A | |||
20/40 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 15.1002 | N/A | ||
50/140 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 0.3059 | N/A | ||
15% HCl Acid Blend | Step Energy Services | Acid | Hydrochloric Acid | 7647-01-0 | 100 | 0.3039 | N/A | |
Water | 7732-18-5 | 100 | 0.3039 | N/A | ||||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0077 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0077 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0077 | N/A | ||||
SCS-1 (Clay Control) | Step Energy Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.1236 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.1236 | N/A | ||||
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0409 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0409 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0409 | N/A | ||||
SNE-2 (Non-Emulsifier) | Step Energy Services | Surfactant | 2-Ethylhexanol distillation residue | 68609-68-7 | 100 | 0.0409 | N/A | |
Dodecylbenzene Sulfonic Acid | 27176-87-0 | 100 | 0.0409 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0409 | N/A | ||||
Monoethanolamine | 141-43-5 | 100 | 0.0409 | N/A | ||||
Oxirane. methyl-. polymer | 11/6/9003 | 100 | 0.0409 | N/A | ||||
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- | 9043-30-5 | 100 | 0.0409 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0409 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-09-16 | 2016-09-18 | Recycled Fracturing Water (treated at well site) | 6612 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 72 | 0.0 | 0.0 | 0.0 |
2017 | 8048 | 0.0 | 0.0 | 0.0 |
2018 | 7576 | 0.0 | 0.0 | 0.0 |
2019 | 7866 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-08-28 | No Incident Encountered | 0.00 | 0.00 |
2016-09-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]