X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655253602000

Well Details

Well ID: 0655253602000
Loading map...
Location: 00/02-36-065-25W5/0
Location Alias: 00/02-36-65-25 W5M
Location Alias 2: 00/02-36-065-25 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 25
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ ANTE 2-36-65-25
Operator Name: ARC Resources Ltd.
License Number: 0435901
License Date: 2011-08-10
License Status: Issued
Spud Date: 2011-09-26
Final Drill Date: 2011-10-07
Well Total Depth: 3443.00 m
Surface Hole Latitude: 54.671651
Surface Hole Longitude: -117.629688

For data sources see[1][2]

Well History

Date Event
2011-08-10 Obtained License
2011-09-27 Surface Casing Operation Performed
2011-09-30 Direction Drilling Operation Performed - Horizontal
2011-09-30 Well Log Performed
2011-10-02 Well Log Performed
2011-10-03 Intermediate Casing Operation Performed
2011-10-04 Well Log Performed
2011-10-07 Finished Drilling
2011-10-07 Well Log Performed
2011-10-07 Well Mode changed to Drilled and Cased
2011-10-09 Liner Casing Operation Performed
2011-10-10 Rig Released
2011-11-10 Well Log Performed
2011-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-13 Perforation Treatment Performed - Open-Hole Completion
2011-11-16 Well Log Performed
2011-12-19 Well Began Production
2011-12-19 Well Fluid changed to Crude Oil
2011-12-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-30 1724.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-13 Open Hole/Barefoot Completion 2260.00 3442.60 0
2011-11-13 Multi-Stage Fracture 2625.00 2715.00 0
2011-11-13 Multi-Stage Fracture 2534.00 2624.00 0
2011-11-13 Multi-Stage Fracture 2443.00 2533.00 0
2011-11-13 Multi-Stage Fracture 2352.00 2442.00 0
2011-11-13 Multi-Stage Fracture 2261.00 2351.00 0
2011-11-13 Multi-Stage Fracture 3353.00 3442.60 0
2011-11-13 Multi-Stage Fracture 3262.00 3352.00 0
2011-11-13 Multi-Stage Fracture 3171.00 3261.00 0
2011-11-13 Multi-Stage Fracture 3080.00 3170.00 0
2011-11-13 Multi-Stage Fracture 2989.00 3079.00 0
2011-11-13 Multi-Stage Fracture 2898.00 2988.00 0
2011-11-13 Multi-Stage Fracture 2807.00 2897.00 0
2011-11-13 Multi-Stage Fracture 2716.00 2806.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 344 0.0 0.0 0.0
2012 8287 0.0 0.0 0.0
2013 7525 0.0 0.0 0.0
2014 4757 0.0 0.0 0.0
2015 6636 0.0 0.0 0.0
2016 7872 0.0 0.0 0.0
2017 7229 0.0 0.0 0.0
2018 6464 0.0 0.0 0.0
2019 7726 0.0 0.0 0.0
2020 1340 0.0 0.0 0.0

For data sources see[6]

References