X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655252502000

Well Details

Well ID: 0655252502000
Loading map...
Location: 00/02-25-065-25W5/0
Location Alias: 00/02-25-65-25 W5M
Location Alias 2: 00/02-25-065-25 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 25
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC ANTE 2-25-65-25
Operator Name: ARC Resources Ltd.
License Number: 0449595
License Date: 2012-10-30
License Status: Issued
Spud Date: 2012-12-02
Final Drill Date: 2012-12-17
Well Total Depth: 3778.00 m
Surface Hole Latitude: 54.662921
Surface Hole Longitude: -117.627727

For data sources see[1][2]

Well History

Date Event
2012-10-30 Obtained License
2012-12-03 Surface Casing Operation Performed
2012-12-07 Direction Drilling Operation Performed - Deviate
2012-12-09 Well Log Performed
2012-12-10 Direction Drilling Operation Performed - Horizontal
2012-12-10 Intermediate Casing Operation Performed
2012-12-17 Finished Drilling
2012-12-17 Well Log Performed
2012-12-17 Well Mode changed to Drilled and Cased
2012-12-19 Liner Casing Operation Performed
2012-12-20 Rig Released
2012-12-20 Well Log Performed
2013-07-07 Well Log Performed
2013-07-21 Perforation Treatment Performed - Multi-Stage Fracture
2013-07-21 Perforation Treatment Performed - Open-Hole Completion
2013-08-01 Well Began Production
2013-08-01 Well Fluid changed to Crude Oil
2013-08-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-02 Horizon Drilling Inc. 42 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-07 1783.00 Deviate (5 - 79 degrees)
2012-12-10 2082.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-07-21 Open Hole/Barefoot Completion 2339.00 3778.00 0
2013-07-21 Multi-Stage Fracture 3040.70 3040.80 0
2013-07-21 Multi-Stage Fracture 2940.90 2941.00 0
2013-07-21 Multi-Stage Fracture 2859.70 2859.80 0
2013-07-21 Multi-Stage Fracture 2775.40 2775.50 0
2013-07-21 Multi-Stage Fracture 2683.40 2683.50 0
2013-07-21 Multi-Stage Fracture 2600.40 2600.50 0
2013-07-21 Multi-Stage Fracture 2505.10 2505.20 0
2013-07-21 Multi-Stage Fracture 2422.50 2422.60 0
2013-07-21 Multi-Stage Fracture 2339.00 2339.10 0
2013-07-21 Multi-Stage Fracture 3735.90 3736.00 0
2013-07-21 Multi-Stage Fracture 3650.40 3650.50 0
2013-07-21 Multi-Stage Fracture 3557.00 3557.10 0
2013-07-21 Multi-Stage Fracture 3474.90 3475.00 0
2013-07-21 Multi-Stage Fracture 3381.60 3381.70 0
2013-07-21 Multi-Stage Fracture 3297.30 3297.40 0
2013-07-21 Multi-Stage Fracture 3204.00 3204.10 0
2013-07-21 Multi-Stage Fracture 3122.40 3122.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-21 2013-07-21 2,105 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 74.8279 N/A
YF120Flex; N002 Schlumberger Crystalline silica 14808-60-7 100 24.1997 N/A
YF120Flex; N002 Schlumberger Energizing Fluid 2-methyl-2h-isothiazol-3-one 2682-20-4 100 0 N/A
5-chloro-2-methyl-2h-isothiazolol-3-one 26172-55-4 100 0.0001 N/A
C13 alcohol ethoxylate 9043-30-5 100 0.0008 N/A
Cholinium chloride 67-48-1 100 0.1254 N/A
Cristobalite 14464-46-1 100 0 N/A
Diammonium peroxidisulphate 7727-54-0 100 0.0207 N/A
Diatomaceous earth; calcined 91053-39-3 100 0.0014 N/A
Dihydrogenated tallow dimethyl ammonium bentonite 68953-58-2 100 0.0077 N/A
Distillates (petroleum); hydrotreated light 64742-47-8 100 0.2327 N/A
Glycerol 56-81-5 100 0.0141 N/A
Guar gum 9000-30-0 100 0.2098 N/A
Hemicellulase enzyme 9012-54-8 100 0.0091 N/A
Magnesium chloride 7786-30-3 100 0.0001 N/A
Magnesium nitrate 10377-60-3 100 0.0002 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0001 N/A
Nitrogen; liquid form 7727-37-9 100 0.2889 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Potassium borate 1332-77-0 100 0.0433 N/A
Potassium hydroxide 1310-58-3 100 0.016 N/A
Propanol; (2-methoxymethylethoxy)- 34590-94-8 100 0.003 N/A
Propylene Carbonate 108-32-7 100 0.002 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0044 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-07-04 2013-07-04 Surface Water - Runoff 675

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2322 0.0 0.0 0.0
2014 7831 0.0 0.0 0.0
2015 6876 0.0 0.0 0.0
2016 6468 0.0 0.0 0.0
2017 7143 0.0 0.0 0.0
2018 8125 0.0 0.0 0.0
2019 7597 0.0 0.0 0.0
2020 1658 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-20 No Incident Encountered 0.00 0.00
2013-08-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References