X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655232901002

Well Details

Well ID: 0655232901002
Loading map...
Location: 00/01-29-065-23W5/2
Location Alias: 00/01-29-65-23 W5M
Location Alias 2: 00/01-29-065-23 W5/02
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 23
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ ANTE 1-29-65-23
Operator Name: ARC Resources Ltd.
License Number: 0442864
License Date: 2012-01-13
License Status: Suspension
Spud Date: 2012-02-23
Final Drill Date: 2012-03-12
Well Total Depth: 3366.00 m
Surface Hole Latitude: 54.649665
Surface Hole Longitude: -117.455755

For data sources see[1][2]

Well History

Date Event
2012-01-13 Obtained License
2012-02-24 Surface Casing Operation Performed
2012-03-05 Direction Drilling Operation Performed - Horizontal
2012-03-06 Well Log Performed
2012-03-08 Intermediate Casing Operation Performed
2012-03-12 Finished Drilling
2012-03-12 Well Log Performed
2012-03-12 Well Mode changed to Drilled and Cased
2012-03-14 Well Log Performed
2012-03-15 Liner Casing Operation Performed
2012-03-16 Rig Released
2012-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-14 Perforation Treatment Performed - Open-Hole Completion
2012-08-21 Well Began Production
2012-08-21 Well Fluid changed to Crude Oil
2012-08-21 Well Mode changed to Pumping
2018-11-01 Well Fluid changed to Crude Oil
2018-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-05 2120.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-14 Multi-Stage Fracture 2232.30 2232.40 0
2012-08-14 Multi-Stage Fracture 2932.70 2932.80 0
2012-08-14 Multi-Stage Fracture 3016.70 3016.80 0
2012-08-14 Multi-Stage Fracture 3090.00 3090.10 0
2012-08-14 Multi-Stage Fracture 3175.50 3175.60 0
2012-08-14 Multi-Stage Fracture 3249.50 3249.60 0
2012-08-14 Multi-Stage Fracture 3327.40 3327.50 0
2012-08-14 Open Hole/Barefoot Completion 3362.00 3366.00 0
2012-08-14 Multi-Stage Fracture 2306.30 2306.40 0
2012-08-14 Multi-Stage Fracture 2391.40 2391.50 0
2012-08-14 Multi-Stage Fracture 2466.50 2466.60 0
2012-08-14 Multi-Stage Fracture 2540.20 2540.30 0
2012-08-14 Multi-Stage Fracture 2626.10 2626.20 0
2012-08-14 Multi-Stage Fracture 2700.30 2700.40 0
2012-08-14 Multi-Stage Fracture 2784.90 2785.00 0
2012-08-14 Multi-Stage Fracture 2857.40 2857.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 48 0.0 0.0 0.0
2013 7693 0.0 0.0 0.0
2014 5148 0.0 0.0 0.0
2015 8071 0.0 0.0 0.0
2016 7498 0.0 0.0 0.0
2017 4290 0.0 0.0 0.0
2018 2813 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-12 No Incident Encountered 0.00 0.00
2012-08-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References