If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0655132403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.66205,"lon":-115.822722,"icon":""}]} |
Location: 00/03-24-065-13W5/0 | |
Location Alias: 00/03-24-65-13 W5M | |
Location Alias 2: 00/03-24-065-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 5 | |
Range: 13 | |
Section: 24 | |
County/Municipality: Big Lakes County | |
Well Name: CPEC HZ VIRG 3-24-65-13 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0487717 | |
License Date: 2018-01-18 | |
License Status: Issued | |
Spud Date: 2018-02-07 | |
Final Drill Date: 2018-02-22 | |
Well Total Depth: 5872.00 m | |
Surface Hole Latitude: 54.662050 | |
Surface Hole Longitude: -115.822722 |
Date | Event |
---|---|
2018-01-18 | Obtained License |
2018-02-08 | Surface Casing Operation Performed |
2018-02-14 | Direction Drilling Operation Performed - Deviate |
2018-02-15 | Direction Drilling Operation Performed - Horizontal |
2018-02-15 | Well Log Performed |
2018-02-16 | Intermediate Casing Operation Performed |
2018-02-22 | Finished Drilling |
2018-02-22 | Well Log Performed |
2018-02-22 | Well Mode changed to Drilled and Cased |
2018-02-23 | Liner Casing Operation Performed |
2018-02-24 | Rig Released |
2018-03-01 | Well Began Production |
2018-03-01 | Well Fluid changed to Crude Oil |
2018-03-01 | Well Mode changed to Pumping |
2018-03-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-20 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-26 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-02-07 | Horizon Drilling Inc. | 19 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-14 | 2495.70 | Deviate (5 - 79 degrees) |
2018-02-15 | 2886.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-20 | Open Hole/Barefoot Completion | 5311.00 | 5872.00 | 0 |
2018-03-20 | Multi-Stage Fracture | 4425.50 | 4427.10 | 0 |
2018-03-20 | Multi-Stage Fracture | 4353.40 | 4355.00 | 0 |
2018-03-20 | Multi-Stage Fracture | 4281.10 | 4282.70 | 0 |
2018-03-20 | Multi-Stage Fracture | 4208.80 | 4210.40 | 0 |
2018-03-20 | Multi-Stage Fracture | 4134.90 | 4136.50 | 0 |
2018-03-20 | Multi-Stage Fracture | 4060.80 | 4062.40 | 0 |
2018-03-20 | Multi-Stage Fracture | 3988.80 | 3990.40 | 0 |
2018-03-20 | Multi-Stage Fracture | 3914.90 | 3916.50 | 0 |
2018-03-20 | Multi-Stage Fracture | 3839.10 | 3840.70 | 0 |
2018-03-20 | Multi-Stage Fracture | 3761.90 | 3763.50 | 0 |
2018-03-20 | Multi-Stage Fracture | 5309.40 | 5311.00 | 0 |
2018-03-20 | Multi-Stage Fracture | 3680.70 | 3682.30 | 0 |
2018-03-20 | Multi-Stage Fracture | 3598.20 | 3599.80 | 0 |
2018-03-20 | Multi-Stage Fracture | 3519.10 | 3520.70 | 0 |
2018-03-20 | Multi-Stage Fracture | 3442.40 | 3444.00 | 0 |
2018-03-20 | Multi-Stage Fracture | 3359.40 | 3361.00 | 0 |
2018-03-20 | Multi-Stage Fracture | 3278.10 | 3279.70 | 0 |
2018-03-20 | Multi-Stage Fracture | 3198.70 | 3200.30 | 0 |
2018-03-20 | Multi-Stage Fracture | 3123.10 | 3124.70 | 0 |
2018-03-20 | Multi-Stage Fracture | 3043.50 | 3045.10 | 0 |
2018-03-20 | Multi-Stage Fracture | 5174.10 | 5175.70 | 0 |
2018-03-20 | Multi-Stage Fracture | 5045.80 | 5047.40 | 0 |
2018-03-20 | Multi-Stage Fracture | 4918.70 | 4920.30 | 0 |
2018-03-20 | Multi-Stage Fracture | 4791.80 | 4793.40 | 0 |
2018-03-20 | Multi-Stage Fracture | 4609.50 | 4611.10 | 0 |
2018-03-20 | Multi-Stage Fracture | 4546.90 | 4548.50 | 0 |
2018-03-20 | Multi-Stage Fracture | 4486.30 | 4487.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-20 | 2018-03-20 | 2,801 | 217 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric acid | 7647-01-0 | 100 | 92.35 | N/A | |||
Hydrochloric acid dilution water | Not Available | 100 | 92.35 | N/A | ||||
Water | Not Available | 100 | 32.8316 | N/A | ||||
DAP-111 | Calfrac | Corrosion Inhibitor | Hydroxylated hydrocarbon | 8676 | 100 | 0.1657 | N/A | |
Inorganic salt | 8676 | 100 | 0.1657 | N/A | ||||
Water | 7732-18-5 | 100 | 0.1657 | N/A | ||||
DAP-121 | Calfrac | Demulsifier | Non-Hazardous Ingredients | Trade Secret | 100 | 0.177 | N/A | |
Sulfonated hydrocarbon | 8691 | 100 | 0.177 | N/A | ||||
DAP-131 | Calfrac | Demulsifier | 2-Propanol | 67-63-0 | 100 | 1.1438 | N/A | |
Inorganic acid | 8692 | 100 | 1.1438 | N/A | ||||
Sulfonated hydrocarbon | 8692 | 100 | 1.1438 | N/A | ||||
DAP-633 | Calfrac | Friction Reducer | Adipic Acid | 124-04-9 | 100 | 0.0833 | N/A | |
Alcohols. C11-15-secondary. etholated | 68131-40-8 | 100 | 0.0833 | N/A | ||||
Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0833 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0833 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-02-28 | 2018-03-01 | Municipal Water | 140 |
2018-03-02 | 2018-03-02 | Municipal Water | 112 |
2018-03-05 | 2018-03-05 | Municipal Water | 30 |
2018-03-06 | 2018-03-06 | Municipal Water | 7 |
2018-03-06 | 2018-03-09 | Municipal Water | 210 |
2018-03-20 | 2018-03-20 | Municipal Water | 4 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 6202 | 0.0 | 0.0 | 0.0 |
2019 | 7376 | 0.0 | 0.0 | 0.0 |
2020 | 1673 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-22 | No Incident Encountered | 0.00 | 0.00 |
2018-04-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]