X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655130608000

Well Details

Well ID: 0655130608000
Loading map...
Location: 00/08-06-065-13W5/0
Location Alias: 00/08-06-65-13 W5M
Location Alias 2: 00/08-06-065-13 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 13
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: CPEC ET AL HZ VIRG 8-6-65-13
Operator Name: Crescent Point Energy Corp.
License Number: 0446427
License Date: 2012-06-12
License Status: Issued
Spud Date: 2012-09-05
Final Drill Date: 2012-09-24
Well Total Depth: 4326.00 m
Surface Hole Latitude: 54.594474
Surface Hole Longitude: -115.968223

For data sources see[1][2]

Well History

Date Event
2012-06-12 Obtained License
2012-09-05 Well Log Performed
2012-09-06 Surface Casing Operation Performed
2012-09-10 Well Log Performed
2012-09-12 Direction Drilling Operation Performed - Deviate
2012-09-16 Direction Drilling Operation Performed - Horizontal
2012-09-16 Intermediate Casing Operation Performed
2012-09-16 Well Log Performed
2012-09-24 Finished Drilling
2012-09-24 Liner Casing Operation Performed
2012-09-24 Well Log Performed
2012-09-24 Well Mode changed to Drilled and Cased
2012-09-28 Rig Released
2012-09-28 Well Log Performed
2012-10-01 Well Began Production
2012-10-01 Well Fluid changed to Crude Oil
2012-10-01 Well Mode changed to Pumping
2012-10-18 Well Log Performed
2012-10-22 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-05 Horizon Drilling Inc. 33 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-12 2633.00 Deviate (5 - 79 degrees)
2012-09-16 2970.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-22 Multi-Stage Fracture 4295.00 4295.10 0
2012-10-22 Multi-Stage Fracture 3548.30 3548.40 0
2012-10-22 Multi-Stage Fracture 3444.70 3444.80 0
2012-10-22 Multi-Stage Fracture 3368.30 3368.40 0
2012-10-22 Multi-Stage Fracture 3291.70 3291.80 0
2012-10-22 Multi-Stage Fracture 3215.20 3215.30 0
2012-10-22 Multi-Stage Fracture 3138.70 3138.80 0
2012-10-22 Multi-Stage Fracture 3075.80 3075.90 0
2012-10-22 Multi-Stage Fracture 4216.00 4216.10 0
2012-10-22 Multi-Stage Fracture 4126.00 4126.10 0
2012-10-22 Multi-Stage Fracture 4049.50 4049.60 0
2012-10-22 Multi-Stage Fracture 3957.80 3957.90 0
2012-10-22 Multi-Stage Fracture 3867.90 3868.00 0
2012-10-22 Multi-Stage Fracture 3804.90 3805.00 0
2012-10-22 Multi-Stage Fracture 3728.40 3728.50 0
2012-10-22 Multi-Stage Fracture 3624.80 3624.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1121 0.0 0.0 0.0
2013 6474 0.0 0.0 0.0
2014 8573 0.0 0.0 0.0
2015 8334 0.0 0.0 0.0
2016 7500 0.0 0.0 0.0
2017 6173 0.0 0.0 0.0
2018 8505 0.0 0.0 0.0
2019 8434 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-28 No Incident Encountered 0.00 0.00
2012-10-09 No Incident Encountered 0.00 0.00

For data sources see[8]

References