X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655101908000

Well Details

Well ID: 0655101908000
Loading map...
Location: 00/08-19-065-10W5/0
Location Alias: 00/08-19-65-10 W5M
Location Alias 2: 00/08-19-065-10 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 10
Section: 19
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 8-19-65-10
Operator Name: Razor Energy Corp.
License Number: 0075424
License Date: 1979-05-01
License Status: Issued
Spud Date: 1979-05-05
Final Drill Date: 1979-05-21
Well Total Depth: 2582.00 m
Surface Hole Latitude: 54.636370
Surface Hole Longitude: -115.491531

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-01 Obtained License
1979-05-21 Finished Drilling
1979-05-25 Production Casing Operation Performed
1979-07-23 Perforation Treatment Performed - Jet Perforation
1979-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-29 Well Mode changed to Drilled and Cased
1980-02-24 Well Began Injection
1980-02-24 Well Fluid changed to Solvent
1980-02-24 Well Type changed to Injection
1990-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-30 Well Fluid changed to Solvent
1990-09-30 Well Mode changed to Suspended
1990-09-30 Well Type changed to Injection
2004-12-19 Perforation Treatment Performed - Jet Perforation
2004-12-21 Perforation Treatment Performed - Chemical Squeeze
2004-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-02-22 Well Fluid changed to Water
2005-02-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-23 Perforation 2486.00 2497.00 13
1979-07-23 Perforation 2554.00 2556.00 13
1979-07-25 Acid Treatment 2486.00 2556.00 0
1990-09-25 Packing Device Capped w/Cement 2432.00 2440.00 0
2004-12-19 Perforation 2486.00 2497.00 13
2004-12-19 Perforation 2501.00 2503.80 13
2004-12-19 Perforation 2507.50 2509.00 13
2004-12-19 Perforation 2510.50 2513.00 13
2004-12-19 Perforation 2520.50 2522.00 13
2004-12-19 Perforation 2524.50 2525.50 13
2004-12-19 Perforation 2528.00 2529.00 13
1979-07-23 Perforation 2501.00 2503.80 13
2004-12-19 Perforation 2529.50 2530.20 13
2004-12-19 Perforation 2538.00 2544.00 13
2004-12-19 Perforation 2554.00 2556.00 13
2004-12-21 Chemical Squeeze 2486.00 2556.00 0
2004-12-22 Acid Treatment 2486.00 2556.00 0
1979-07-23 Perforation 2507.50 2509.00 13
1979-07-23 Perforation 2510.50 2513.00 13
1979-07-23 Perforation 2520.50 2522.00 13
1979-07-23 Perforation 2524.50 2525.50 13
1979-07-23 Perforation 2528.00 2529.00 13
1979-07-23 Perforation 2529.50 2530.20 13
1979-07-23 Perforation 2538.00 2544.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References