X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655100510020

Well Details

Well ID: 0655100510020
Loading map...
Location: 02/10-05-065-10W5/0
Location Alias: 02/10-05-65-10 W5M
Location Alias 2: 02/10-05-065-10 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 10
Section: 05
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 10-5-65-10
Operator Name: Razor Energy Corp.
License Number: 0150078
License Date: 1991-09-18
License Status: Issued
Spud Date: 1991-10-12
Final Drill Date: 1991-10-24
Well Total Depth: 2509.00 m
Surface Hole Latitude: 54.598676
Surface Hole Longitude: -115.473313

For data sources see[1][2]

Well History

Date Event
1991-09-18 Obtained License
1991-10-13 Surface Casing Operation Performed
1991-10-24 Finished Drilling
1991-10-24 Well Log Performed
1991-10-24 Well Mode changed to Drilled and Cased
1991-10-27 Lost Circulation Occurred
1991-10-27 Production Casing Operation Performed
1991-10-27 Rig Released
1991-10-27 Well Log Performed
1991-11-07 Perforation Treatment Performed - Jet Perforation
1991-11-07 Well Log Performed
1991-11-08 Perforation Treatment Performed - Jet Perforation
1991-11-08 Well Log Performed
1991-11-10 Well Log Performed
1991-11-11 Perforation Treatment Performed - Cement Squeeze
1991-11-19 Perforation Treatment Performed - Jet Perforation
1991-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-14 Well Began Production
1991-12-14 Well Fluid changed to Crude Oil
1991-12-14 Well Mode changed to Pumping
1996-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-11-07 Perforation 2230.00 2230.60 3
1991-11-08 Perforation 2230.00 2230.30 3
1991-11-08 Perforation 2486.00 2486.30 3
1991-11-11 Cement Squeeze 2230.00 2486.30 0
1991-11-19 Perforation 2440.00 2445.00 39
1991-11-19 Perforation 2447.00 2465.00 39
1991-12-14 Acid Treatment 2440.00 2465.00 0
1996-10-07 Acid Treatment 2440.00 2465.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 740 0.0 0.0 0.0
1991 480 0.0 0.0 0.0
1992 8655 0.0 0.0 0.0
1993 8019 0.0 0.0 0.0
1994 6403 0.0 0.0 0.0
1995 7266 0.0 0.0 0.0
1996 8471 0.0 0.0 0.0
1997 8729 0.0 0.0 0.0
1998 8637 0.0 0.0 0.0
1999 8734 0.0 0.0 0.0
2000 8632 0.0 0.0 0.0
2001 8722 0.0 0.0 0.0
2002 8706 0.0 0.0 0.0
2003 8732 0.0 0.0 0.0
2004 8163 0.0 0.0 0.0
2005 8690 0.0 0.0 0.0
2006 8467 0.0 0.0 0.0
2007 8638 0.0 0.0 0.0
2008 8173 0.0 0.0 0.0
2009 8080 0.0 0.0 0.0
2010 7930 0.0 0.0 0.0
2011 6858 0.0 0.0 0.0
2012 7163 0.0 0.0 0.0
2013 6768 0.0 0.0 0.0
2014 1041 0.0 0.0 0.0
2015 7698 0.0 0.0 0.0
2016 8002 0.0 0.0 0.0
2017 8605 0.0 0.0 0.0
2018 6460 0.0 0.0 0.0
2019 1416 0.0 0.0 0.0
2020 1604 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-10-27 Lost Circulation 2509.00 2509.00

For data sources see[6]

References