X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646070906000

Well Details

Well ID: 0646070906000
Loading map...
Location: 00/06-09-064-07W6/0
Location Alias: 00/06-09-64-07 W6M
Location Alias 2: 00/06-09-064-07 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 07
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: BAYSEL REGENT FPC CUTBANK 6-9-64-7
Operator Name: Suncor Energy Inc.
License Number: 0010650
License Date: 1955-12-15
License Status: RecExempt
Spud Date: 1956-01-06
Final Drill Date: 1956-03-13
Well Total Depth: 2507.00 m
Surface Hole Latitude: 54.522734
Surface Hole Longitude: -118.995760

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-12-15 Obtained License
1956-01-19 Drill Stem Test Performed
1956-02-07 Well Log Performed
1956-02-09 Drill Stem Test Performed
1956-02-13 Drill Stem Test Performed
1956-03-13 Drill Stem Test Performed
1956-03-13 Finished Drilling
1956-03-13 Well Log Performed
1956-03-13 Well Mode changed to Drilled and Cased
1956-03-15 Production Casing Operation Performed
1956-08-11 Perforation Treatment Performed - Bullet Perforation
1956-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-19 Perforation Treatment Performed - Bullet Perforation
1956-08-19 Perforation Treatment Performed - Fractured
1956-08-19 Perforation Treatment Performed - Jet Perforation
1956-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1956-08-29 Perforation Treatment Performed - Bullet Perforation
1956-08-29 Perforation Treatment Performed - Jet Perforation
1956-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-09-06 Perforation Treatment Performed - Fractured
1956-10-04 Well Began Production
1956-10-04 Well Fluid changed to Crude Oil
1956-10-04 Well Mode changed to Flowing
1957-03-01 Well Fluid changed to Crude Oil
1957-03-01 Well Mode changed to Suspended
1958-03-12 Perforation Treatment Performed - Cement Plug
1958-03-17 Well Abandoned
1958-03-17 Well Fluid changed to Crude Oil
1958-03-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-08-11 Bullet Perforation 2426.20 2435.40 13
1956-08-29 Bullet Perforation 1285.60 1292.40 10
1956-09-06 Acid Treatment 1285.60 1292.40 0
1956-09-06 Fracture 1285.60 1292.40 0
1958-03-12 Cement Plug 1261.90 1292.40 0
1956-08-13 Acid Treatment 2426.20 2435.40 0
1956-08-14 Packing Device Capped w/Cement 1607.80 1607.80 0
1956-08-19 Bullet Perforation 1580.70 1586.20 10
1956-08-19 Perforation 1580.70 1586.20 10
1956-08-19 Acid Treatment 1580.70 1586.20 0
1956-08-19 Fracture 1580.70 1586.20 0
1956-08-29 Packing Device Capped w/Cement 1311.20 1311.20 0
1956-08-29 Perforation 1285.60 1292.40 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References