X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646062501020

Well Details

Well ID: 0646062501020
Loading map...
Location: 02/01-25-064-06W6/0
Location Alias: 02/01-25-64-06 W6M
Location Alias 2: 02/01-25-064-06 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 06
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: LONG RUN HZ 102 KAKWA 1-25-64-6
Operator Name: Long Run Exploration Ltd.
License Number: 0480148
License Date: 2016-08-22
License Status: Issued
Spud Date: 2016-09-23
Final Drill Date: 2016-10-05
Well Total Depth: 2862.00 m
Surface Hole Latitude: 54.559369
Surface Hole Longitude: -118.780008

For data sources see[1][2]

Well History

Date Event
2016-08-22 Obtained License
2016-09-24 Direction Drilling Operation Performed - Deviate
2016-09-25 Surface Casing Operation Performed
2016-09-27 Direction Drilling Operation Performed - Horizontal
2016-09-29 Intermediate Casing Operation Performed
2016-10-05 Finished Drilling
2016-10-05 Well Log Performed
2016-10-05 Well Mode changed to Drilled and Cased
2016-10-06 Liner Casing Operation Performed
2016-10-06 Perforation Treatment Performed - Open-Hole Completion
2016-10-06 Well Log Performed
2016-10-07 Rig Released
2016-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2016-12-14 Well Began Production
2016-12-14 Well Fluid changed to Gas
2016-12-14 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-23 Bonanza Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-24 225.10 Deviate (5 - 79 degrees)
2016-09-27 1614.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-06 Open Hole/Barefoot Completion 2855.00 2862.00 0
2016-12-05 Multi-Stage Fracture 2416.80 2417.30 0
2016-12-05 Multi-Stage Fracture 2371.50 2372.00 0
2016-12-05 Multi-Stage Fracture 2326.20 2326.70 0
2016-12-05 Multi-Stage Fracture 2280.80 2281.30 0
2016-12-05 Multi-Stage Fracture 2235.50 2236.00 0
2016-12-05 Multi-Stage Fracture 2176.60 2177.10 0
2016-12-05 Multi-Stage Fracture 2131.20 2131.70 0
2016-12-05 Multi-Stage Fracture 2085.80 2086.30 0
2016-12-05 Multi-Stage Fracture 2026.90 2027.40 0
2016-12-05 Multi-Stage Fracture 1981.60 1982.10 0
2016-12-05 Multi-Stage Fracture 2807.20 2808.10 0
2016-12-05 Multi-Stage Fracture 1936.30 1936.80 0
2016-12-05 Multi-Stage Fracture 1724.10 1724.60 0
2016-12-05 Multi-Stage Fracture 1678.70 1679.20 0
2016-12-05 Multi-Stage Fracture 2761.20 2761.70 0
2016-12-05 Multi-Stage Fracture 2715.90 2716.40 0
2016-12-05 Multi-Stage Fracture 2670.60 2671.10 0
2016-12-05 Multi-Stage Fracture 2611.70 2612.20 0
2016-12-05 Multi-Stage Fracture 2566.30 2566.80 0
2016-12-05 Multi-Stage Fracture 2521.00 2521.50 0
2016-12-05 Multi-Stage Fracture 2475.70 2476.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-12-05 2016-12-05 1,517 552 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 39.9675 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 27.7824 N/A
2K7 Water Soluble Paks Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0054 N/A
Alpha 544 Baker Hughes Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0036 N/A
Dibromoacetonitrile 3252-43-5 100 0.0036 N/A
Polyethylene Glycol 25322-68-3 100 0.0036 N/A
Sodium Bromide 7647-15-6 100 0.0036 N/A
GBW-41LW Baker Hughes Breaker Hydrogen Peroxide 7722-84-1 100 0.1184 N/A
Methanol 67-56-1 100 0.1184 N/A
Non-hazardous Not Available 100 0.1184 N/A
FP-13L Baker Hughes Defoamer Tributyl phosphate 126-73-8 100 0.0056 N/A
D-3 Baker Hughes Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.03 N/A
Isopropanol 67-63-0 100 0.03 N/A
Methanol 67-56-1 100 0.03 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 31.4538 N/A
FAW-30 Baker Hughes Friction Reducer Amine derivative 9842 100 0.3715 N/A
Glycerine 56-81-5 100 0.3716 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.2596 N/A
Oxyalkylated alcohol 9014 100 0.2596 N/A
Petroleum distillates 64742-47-8 100 0.2596 N/A
Polyacrylate 9014 100 0.2596 N/A
Nowferr 14P Baker Hughes Iron Control Cupric sulphate. pentahydrate 7758-99-8 100 0.0018 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-11-25 2016-11-26 Surface Water - Runoff 600

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 378 0.0 0.0 0.0
2017 8535 0.0 0.0 0.0
2018 8718 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-07 No Incident Encountered 0.00 0.00
2016-12-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References