X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646061404000

Well Details

Well ID: 0646061404000
Loading map...
Location: 00/04-14-064-06W6/0
Location Alias: 00/04-14-64-06 W6M
Location Alias 2: 00/04-14-064-06 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 06
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: LONG RUN HZ KAKWA 4-14-64-6
Operator Name: Long Run Exploration Ltd.
License Number: 0471095
License Date: 2014-11-04
License Status: Issued
Spud Date: 2014-12-13
Final Drill Date: 2015-01-14
Well Total Depth: 2874.00 m
Surface Hole Latitude: 54.544841
Surface Hole Longitude: -118.798031

For data sources see[1][2]

Well History

Date Event
2014-11-04 Obtained License
2014-12-14 Lost Circulation Occurred
2014-12-15 Surface Casing Operation Performed
2015-01-04 Direction Drilling Operation Performed - Deviate
2015-01-06 Direction Drilling Operation Performed - Horizontal
2015-01-08 Intermediate Casing Operation Performed
2015-01-14 Finished Drilling
2015-01-14 Well Log Performed
2015-01-14 Well Mode changed to Drilled and Cased
2015-01-15 Liner Casing Operation Performed
2015-01-16 Rig Released
2015-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-09 Well Fluid changed to Gas
2015-02-09 Well Mode changed to Testing
2015-03-02 Well Began Production
2015-03-02 Well Fluid changed to Gas
2015-03-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-03 Bonanza Drilling Inc. 5 N/A Drill To LD
2014-12-13 Trinidad Drilling Ltd. 21 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-04 1111.10 Deviate (5 - 79 degrees)
2015-01-06 1701.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-31 Multi-Stage Fracture 2774.50 2775.40 0
2015-01-31 Multi-Stage Fracture 2329.10 2329.60 0
2015-01-31 Multi-Stage Fracture 2283.80 2284.30 0
2015-01-31 Multi-Stage Fracture 2225.00 2225.50 0
2015-01-31 Multi-Stage Fracture 2180.60 2181.10 0
2015-01-31 Multi-Stage Fracture 2135.30 2135.80 0
2015-01-31 Multi-Stage Fracture 2076.40 2076.90 0
2015-01-31 Multi-Stage Fracture 2031.00 2031.50 0
2015-02-01 Multi-Stage Fracture 1985.70 1986.20 0
2015-02-01 Multi-Stage Fracture 1940.40 1940.90 0
2015-02-01 Multi-Stage Fracture 1895.00 1895.50 0
2015-01-31 Multi-Stage Fracture 2715.40 2715.90 0
2015-02-01 Multi-Stage Fracture 1836.20 1836.70 0
2015-01-31 Multi-Stage Fracture 2683.60 2684.10 0
2015-01-31 Multi-Stage Fracture 2625.00 2625.50 0
2015-01-31 Multi-Stage Fracture 2579.80 2580.30 0
2015-01-31 Multi-Stage Fracture 2534.50 2535.00 0
2015-01-31 Multi-Stage Fracture 2475.70 2476.20 0
2015-01-31 Multi-Stage Fracture 2430.90 2431.40 0
2015-01-31 Multi-Stage Fracture 2372.10 2372.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-31 2015-02-01 1,548 548 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 43.109 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 31.4517 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0228 N/A
Methanol 67-56-1 100 0.0228 N/A
Water 7732-18-5 100 0.0228 N/A
GBW-41LW Baker Hughes Breaker Hydrogen Peroxide 7722-84-1 100 0.0133 N/A
Methanol 67-56-1 100 0.0133 N/A
Non-hazardous Not Available 100 0.0133 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 24.9737 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.2904 N/A
Oxyalkylated alcohol 9014 100 0.2904 N/A
Petroleum distillates 64742-47-8 100 0.2904 N/A
Polyacrylate 9014 100 0.2904 N/A
Nowferr 14P Baker Hughes Iron Control Cupric sulphate. pentahydrate 7758-99-8 100 0.0019 N/A
FAW-26 Baker Hughes Surfactant 1-Butoxy-2-propanol 5131-66-8 100 0.1368 N/A
Diethanolamine 111-42-2 100 0.1369 N/A
Ethanol 64-17-5 100 0.1368 N/A
Methanol 67-56-1 100 0.1368 N/A
Polyoxyalkylene sulfate 68891-29-2 100 0.1368 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-31 2015-01-31 Municipal Water 120
2015-01-26 2015-01-28 Surface Water - River 450

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 7308 0.0 0.0 0.0
2016 8415 0.0 0.0 0.0
2017 8370 0.0 0.0 0.0
2018 8656 0.0 0.0 0.0
2019 8653 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-14 Lost Circulation 42.00 450.00
2015-02-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References