X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645250201000

Well Details

Well ID: 0645250201000
Loading map...
Location: 00/01-02-064-25W5/0
Location Alias: 00/01-02-64-25 W5M
Location Alias 2: 00/01-02-064-25 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 25
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 04-12B SIMON 1-2-64-25
Operator Name: Murphy Oil Company Ltd.
License Number: 0436169
License Date: 2011-08-19
License Status: Suspension
Spud Date: 2011-10-30
Final Drill Date: 2011-11-15
Well Total Depth: 3720.00 m
Surface Hole Latitude: 54.516865
Surface Hole Longitude: -117.655117

For data sources see[1][2]

Well History

Date Event
2011-08-19 Obtained License
2011-11-01 Surface Casing Operation Performed
2011-11-05 Direction Drilling Operation Performed - Horizontal
2011-11-15 Finished Drilling
2011-11-15 Rig Released
2011-11-15 Well Log Performed
2011-11-15 Well Mode changed to Drilled and Cased
2011-11-17 Production Casing Operation Performed
2011-11-17 Well Log Performed
2012-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-17 Well Began Production
2012-01-17 Well Fluid changed to Crude Oil
2012-01-17 Well Mode changed to Flowing
2012-02-23 Well Fluid changed to Crude Oil
2012-02-23 Well Mode changed to Pumping
2018-06-01 Well Fluid changed to Crude Oil
2018-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-05 2020.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-13 Multi-Stage Fracture 3648.00 3648.30 0
2012-01-14 Multi-Stage Fracture 2912.00 2912.30 0
2012-01-14 Multi-Stage Fracture 2828.20 2828.50 0
2012-01-14 Multi-Stage Fracture 2757.30 2757.50 0
2012-01-14 Multi-Stage Fracture 2673.60 2673.90 0
2012-01-14 Multi-Stage Fracture 2590.20 2590.50 0
2012-01-16 Multi-Stage Fracture 2519.00 2519.30 0
2012-01-13 Multi-Stage Fracture 3566.00 3566.30 0
2012-01-13 Multi-Stage Fracture 3496.00 3496.30 0
2012-01-13 Multi-Stage Fracture 3412.00 3412.30 0
2012-01-13 Multi-Stage Fracture 3329.60 3329.90 0
2012-01-13 Multi-Stage Fracture 3246.70 3246.90 0
2012-01-14 Multi-Stage Fracture 3163.20 3163.50 0
2012-01-14 Multi-Stage Fracture 3079.50 3080.00 0
2012-01-14 Multi-Stage Fracture 2995.50 2996.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7426 0.0 0.0 0.0
2013 6718 0.0 0.0 0.0
2014 8519 0.0 0.0 0.0
2015 3880 0.0 0.0 0.0
2016 5320 0.0 0.0 0.0
2017 360 0.0 0.0 0.0

For data sources see[6]

References