X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645240214030

Well Details

Well ID: 0645240214030
Loading map...
Location: 03/14-02-064-24W5/0
Location Alias: 03/14-02-64-24 W5M
Location Alias 2: 03/14-02-064-24 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 24
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: CHEVRON 103 HZ WAHIGAN 14-2-64-24
Operator Name: Chevron Canada Limited
License Number: 0487829
License Date: 2018-01-25
License Status: Amended
Spud Date: 2018-11-24
Final Drill Date: 2018-12-11
Well Total Depth: 7225.00 m
Surface Hole Latitude: 54.483027
Surface Hole Longitude: -117.516727

For data sources see[1][2]

Well History

Date Event
2018-01-25 Obtained License
2018-11-25 Surface Casing Operation Performed
2018-11-26 Direction Drilling Operation Performed - Deviate
2018-11-29 Well Log Performed
2018-12-02 Intermediate Casing Operation Performed
2018-12-06 Direction Drilling Operation Performed - Horizontal
2018-12-11 Finished Drilling
2018-12-11 Well Log Performed
2018-12-11 Well Mode changed to Drilled and Cased
2018-12-12 Well Log Performed
2018-12-14 Production Casing Operation Performed
2018-12-14 Rig Released
2018-12-29 Perforation Treatment Performed - Jet Perforation
2019-01-02 Perforation Treatment Performed - Jet Perforation
2019-01-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-03 Perforation Treatment Performed - Jet Perforation
2019-01-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-04 Perforation Treatment Performed - Jet Perforation
2019-01-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-05 Perforation Treatment Performed - Jet Perforation
2019-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-06 Perforation Treatment Performed - Jet Perforation
2019-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-07 Perforation Treatment Performed - Jet Perforation
2019-01-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-08 Perforation Treatment Performed - Jet Perforation
2019-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-09 Perforation Treatment Performed - Jet Perforation
2019-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-10 Perforation Treatment Performed - Jet Perforation
2019-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-11 Perforation Treatment Performed - Jet Perforation
2019-01-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-12 Perforation Treatment Performed - Jet Perforation
2019-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-13 Perforation Treatment Performed - Jet Perforation
2019-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-14 Perforation Treatment Performed - Jet Perforation
2019-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-21 Well Began Production
2019-03-21 Well Fluid changed to Shale Gas Only
2019-03-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-26 Ensign Drilling Inc. 144 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-26 516.90 Deviate (5 - 79 degrees)
2018-12-06 3639.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-12-29 Perforation 7141.40 7141.90 12
2019-01-02 Perforation 7020.30 7020.80 10
2019-01-07 Perforation 5854.90 5855.40 12
2019-01-07 Perforation 5839.80 5840.30 10
2019-01-07 Perforation 5824.60 5825.10 8
2019-01-07 Perforation 5809.50 5810.00 8
2019-01-07 Multi-Stage Fracture 5809.50 5885.70 0
2019-01-07 Perforation 5794.30 5794.80 16
2019-01-07 Perforation 5779.20 5779.70 14
2019-01-07 Perforation 5764.10 5764.60 12
2019-01-07 Perforation 5748.90 5749.40 10
2019-01-07 Perforation 5733.80 5734.30 8
2019-01-02 Perforation 7005.20 7005.70 8
2019-01-07 Perforation 5718.70 5719.20 8
2019-01-07 Multi-Stage Fracture 5718.70 5794.80 0
2019-01-08 Perforation 5703.50 5704.00 16
2019-01-08 Perforation 5688.40 5688.90 14
2019-01-08 Perforation 5673.30 5673.80 12
2019-01-08 Perforation 5658.10 5658.60 10
2019-01-08 Perforation 5643.00 5643.50 8
2019-01-08 Perforation 5627.90 5628.40 8
2019-01-08 Multi-Stage Fracture 5627.90 5704.00 0
2019-01-08 Perforation 5612.70 5613.20 16
2019-01-02 Multi-Stage Fracture 7005.20 7066.20 0
2019-01-08 Perforation 5597.60 5598.10 14
2019-01-08 Perforation 5582.50 5583.00 12
2019-01-08 Perforation 5567.30 5567.80 10
2019-01-08 Perforation 5552.20 5552.70 8
2019-01-08 Perforation 5537.10 5537.60 8
2019-01-08 Multi-Stage Fracture 5537.10 5620.30 0
2019-01-08 Perforation 5521.90 5522.40 16
2019-01-08 Perforation 5506.80 5507.30 14
2019-01-08 Perforation 5491.60 5492.10 12
2019-01-08 Perforation 5476.50 5477.00 10
2019-01-03 Perforation 6990.00 6990.50 12
2019-01-08 Perforation 5461.40 5461.90 8
2019-01-08 Perforation 5446.20 5446.70 8
2019-01-08 Multi-Stage Fracture 5446.20 5522.40 0
2019-01-08 Perforation 5431.10 5431.60 16
2019-01-08 Perforation 5416.00 5416.50 14
2019-01-08 Perforation 5400.80 5401.30 12
2019-01-08 Perforation 5385.70 5386.20 10
2019-01-08 Perforation 5370.60 5371.10 8
2019-01-08 Perforation 5355.40 5355.90 8
2019-01-08 Multi-Stage Fracture 5355.40 5431.60 0
2019-01-03 Perforation 6974.90 6975.40 12
2019-01-09 Perforation 5340.30 5340.80 14
2019-01-09 Perforation 5325.20 5325.70 12
2019-01-09 Perforation 5310.00 5310.50 10
2019-01-09 Perforation 5294.90 5295.40 10
2019-01-09 Perforation 5279.80 5280.30 8
2019-01-09 Perforation 5264.60 5265.10 8
2019-01-09 Multi-Stage Fracture 5264.60 5340.80 0
2019-01-09 Perforation 5249.50 5250.00 14
2019-01-09 Perforation 5234.40 5234.90 12
2019-01-09 Perforation 5219.20 5219.70 12
2019-01-03 Perforation 6959.70 6960.20 10
2019-01-09 Perforation 5204.10 5204.60 12
2019-01-09 Perforation 5188.90 5189.40 10
2019-01-09 Perforation 5173.80 5174.30 8
2019-01-09 Multi-Stage Fracture 5173.30 5250.00 0
2019-01-10 Perforation 5158.70 5159.20 14
2019-01-10 Perforation 5143.50 5144.00 12
2019-01-10 Perforation 5128.40 5128.90 12
2019-01-10 Perforation 5113.30 5113.80 12
2019-01-10 Perforation 5098.10 5098.60 8
2019-01-10 Perforation 5083.00 5083.50 8
2019-01-03 Perforation 6944.60 6945.10 10
2019-01-10 Multi-Stage Fracture 5083.00 5159.20 0
2019-01-10 Perforation 5067.90 5068.40 14
2019-01-10 Perforation 5052.70 5053.20 12
2019-01-10 Perforation 5037.60 5038.10 10
2019-01-10 Perforation 5022.50 5023.00 10
2019-01-10 Perforation 5007.30 5007.80 8
2019-01-10 Perforation 4992.20 4992.70 8
2019-01-10 Multi-Stage Fracture 4991.10 5075.40 0
2019-01-10 Perforation 4977.10 4977.60 14
2019-01-10 Perforation 4961.90 4962.40 12
2019-01-03 Perforation 6929.50 6930.00 8
2019-01-10 Perforation 4946.80 4947.30 12
2019-01-10 Perforation 4931.70 4932.20 12
2019-01-10 Perforation 4916.50 4917.00 10
2019-01-10 Perforation 4901.40 4901.90 8
2019-01-10 Multi-Stage Fracture 4901.40 4984.60 0
2019-01-11 Perforation 4886.20 4886.70 14
2019-01-11 Perforation 4871.10 4871.60 12
2019-01-11 Perforation 4856.00 4856.50 12
2019-01-11 Perforation 4840.80 4841.30 12
2019-01-11 Perforation 4825.70 4826.20 10
2019-01-03 Perforation 6914.30 6914.80 8
2019-01-11 Perforation 4810.60 4811.10 8
2019-01-11 Multi-Stage Fracture 4810.60 4886.70 0
2019-01-11 Perforation 4795.40 4795.90 14
2019-01-11 Perforation 4780.30 4780.80 12
2019-01-11 Perforation 4765.20 4765.70 10
2019-01-11 Perforation 4750.00 4750.50 10
2019-01-11 Perforation 4734.90 4735.40 8
2019-01-11 Perforation 4719.90 4720.40 8
2019-01-11 Multi-Stage Fracture 4719.80 4803.00 0
2019-01-11 Perforation 4704.60 4705.10 14
2019-01-03 Perforation 6899.20 6899.70 8
2019-01-11 Perforation 4689.50 4690.00 12
2019-01-11 Perforation 4674.40 4674.90 10
2019-01-11 Perforation 4659.20 4659.70 10
2019-01-11 Perforation 4644.10 4644.60 8
2019-01-11 Perforation 4629.00 4629.50 8
2019-01-11 Multi-Stage Fracture 4629.00 4712.20 0
2019-01-11 Perforation 4613.80 4614.30 14
2019-01-11 Perforation 4598.70 4599.20 12
2019-01-11 Perforation 4583.50 4584.00 10
2019-01-11 Perforation 4568.40 4568.90 10
2018-12-29 Perforation 7126.20 7126.70 12
2019-01-03 Multi-Stage Fracture 6899.20 6990.50 0
2019-01-11 Perforation 4553.30 4553.80 8
2019-01-11 Perforation 4538.10 4538.60 8
2019-01-11 Multi-Stage Fracture 4538.10 4614.30 0
2019-01-12 Perforation 4523.00 4523.50 14
2019-01-12 Perforation 4507.90 4508.40 12
2019-01-12 Perforation 4492.70 4493.20 10
2019-01-12 Perforation 4477.60 4478.10 10
2019-01-12 Perforation 4462.50 4463.00 8
2019-01-12 Perforation 4447.30 4447.80 8
2019-01-12 Multi-Stage Fracture 4447.30 4523.50 0
2019-01-03 Perforation 6884.10 6884.60 16
2019-01-12 Perforation 4432.20 4432.70 14
2019-01-12 Perforation 4417.10 4417.60 12
2019-01-12 Perforation 4401.90 4402.40 10
2019-01-12 Perforation 4386.80 4387.30 10
2019-01-12 Perforation 4371.70 4372.20 8
2019-01-12 Perforation 4356.50 4357.00 8
2019-01-12 Multi-Stage Fracture 4356.00 4439.80 0
2019-01-12 Perforation 4341.40 4341.90 14
2019-01-12 Perforation 4326.30 4326.80 12
2019-01-12 Perforation 4311.10 4311.60 10
2019-01-03 Perforation 6868.90 6869.40 14
2019-01-12 Perforation 4296.00 4296.50 10
2019-01-12 Perforation 4280.80 4281.30 8
2019-01-12 Perforation 4265.70 4266.20 8
2019-01-12 Multi-Stage Fracture 4265.70 4349.00 0
2019-01-12 Perforation 4250.60 4251.10 14
2019-01-12 Perforation 4235.40 4235.90 12
2019-01-12 Perforation 4220.30 4220.80 10
2019-01-12 Perforation 4205.20 4205.70 10
2019-01-12 Perforation 4190.00 4190.50 8
2019-01-12 Perforation 4174.90 4175.40 8
2019-01-03 Perforation 6853.80 6854.30 12
2019-01-12 Multi-Stage Fracture 4174.40 4258.10 0
2019-01-13 Perforation 4159.80 4160.30 14
2019-01-13 Perforation 4144.60 4145.10 12
2019-01-13 Perforation 4129.50 4130.00 10
2019-01-13 Perforation 4114.40 4114.90 10
2019-01-13 Perforation 4099.20 4099.70 8
2019-01-13 Perforation 4084.10 4084.60 8
2019-01-13 Multi-Stage Fracture 4084.10 4160.30 0
2019-01-13 Perforation 4069.00 4069.50 14
2019-01-13 Perforation 4053.80 4054.30 12
2019-01-03 Perforation 6838.70 6839.20 10
2019-01-13 Perforation 4038.70 4039.20 10
2019-01-13 Perforation 4023.60 4024.10 10
2019-01-13 Perforation 4008.40 4008.90 8
2019-01-13 Perforation 3993.30 3993.80 8
2019-01-13 Multi-Stage Fracture 3992.80 4076.50 0
2019-01-13 Perforation 3978.10 3978.60 14
2019-01-13 Perforation 3962.00 3962.50 12
2019-01-13 Perforation 3947.90 3948.40 10
2019-01-13 Perforation 3932.70 3933.20 10
2019-01-13 Perforation 3917.60 3918.10 8
2019-01-03 Perforation 6823.50 6824.00 8
2019-01-13 Perforation 3902.50 3903.00 8
2019-01-13 Multi-Stage Fracture 3902.00 3985.70 0
2019-01-13 Perforation 3887.30 3887.80 14
2019-01-13 Perforation 3872.20 3872.70 12
2019-01-13 Perforation 3857.10 3857.60 10
2019-01-13 Perforation 3841.90 3842.40 10
2019-01-13 Perforation 3826.80 3827.30 8
2019-01-13 Perforation 3811.70 3812.20 8
2019-01-13 Multi-Stage Fracture 3811.70 3887.80 0
2019-01-14 Perforation 3796.50 3797.00 14
2019-01-03 Perforation 6808.40 6808.90 8
2019-01-14 Perforation 3781.40 3781.90 12
2019-01-14 Perforation 3766.30 3766.80 10
2019-01-14 Perforation 3751.10 3751.60 10
2019-01-14 Perforation 3736.00 3736.50 8
2019-01-14 Perforation 3720.90 3721.40 8
2019-01-14 Multi-Stage Fracture 3720.90 3797.00 0
2019-01-14 Perforation 3705.70 3706.20 14
2019-01-14 Perforation 3690.60 3691.10 12
2019-01-14 Perforation 3675.40 3675.90 10
2019-01-14 Perforation 3660.30 3660.80 10
2019-01-03 Multi-Stage Fracture 6808.40 6884.60 0
2019-01-14 Perforation 3645.20 3645.70 8
2019-01-14 Perforation 3630.00 3630.50 8
2019-01-14 Multi-Stage Fracture 3629.50 3713.30 0
2019-01-03 Perforation 6793.30 6793.80 16
2019-01-03 Perforation 6778.10 6778.60 14
2018-12-29 Perforation 7111.10 7111.60 12
2019-01-03 Perforation 6763.00 6763.50 12
2019-01-03 Perforation 6747.90 6748.40 10
2019-01-03 Perforation 6732.70 6733.20 8
2019-01-03 Perforation 6717.60 6718.10 8
2019-01-04 Multi-Stage Fracture 6717.10 6793.80 0
2019-01-04 Perforation 6702.50 6703.00 16
2019-01-04 Perforation 6687.30 6687.80 14
2019-01-04 Perforation 6672.20 6672.70 12
2019-01-04 Perforation 6657.00 6657.50 10
2019-01-04 Perforation 6641.90 6642.40 8
2018-12-29 Perforation 7096.00 7096.50 12
2019-01-04 Perforation 6626.80 6627.30 8
2019-01-04 Multi-Stage Fracture 6626.80 6703.00 0
2019-01-04 Perforation 6611.60 6612.10 16
2019-01-04 Perforation 6596.50 6597.00 14
2019-01-04 Perforation 6581.40 6581.90 12
2019-01-04 Perforation 6566.20 6566.70 10
2019-01-04 Perforation 6551.10 6551.60 8
2019-01-04 Perforation 6536.00 6536.50 8
2019-01-04 Multi-Stage Fracture 6535.50 6612.10 0
2019-01-05 Perforation 6520.80 6521.30 16
2018-12-29 Perforation 7080.80 7081.30 12
2019-01-05 Perforation 6505.70 6506.20 14
2019-01-05 Perforation 6490.60 6491.10 12
2019-01-05 Perforation 6475.40 6475.90 10
2019-01-05 Perforation 6460.30 6460.80 8
2019-01-05 Perforation 6445.20 6445.70 8
2019-01-05 Multi-Stage Fracture 6445.20 6521.30 0
2019-01-05 Perforation 6430.00 6430.50 16
2019-01-05 Perforation 6414.90 6415.40 14
2019-01-05 Perforation 6399.80 6400.30 12
2019-01-05 Perforation 6384.60 6385.10 10
2019-01-02 Multi-Stage Fracture 7080.80 7141.90 0
2019-01-05 Perforation 6369.50 6370.00 8
2019-01-05 Perforation 6354.30 6354.80 8
2019-01-05 Multi-Stage Fracture 6354.30 6430.50 0
2019-01-05 Perforation 6339.20 6339.70 16
2019-01-05 Perforation 6324.10 6324.60 14
2019-01-05 Perforation 6308.90 6309.40 12
2019-01-05 Perforation 6293.80 6294.30 10
2019-01-05 Perforation 6278.70 6279.20 8
2019-01-05 Perforation 6263.50 6264.00 8
2019-01-05 Multi-Stage Fracture 6263.50 6339.70 0
2019-01-02 Perforation 7065.70 7066.20 12
2019-01-06 Perforation 6248.40 6248.90 16
2019-01-06 Perforation 6233.30 6233.80 14
2019-01-06 Perforation 6218.10 6218.60 12
2019-01-06 Perforation 6203.00 6203.50 10
2019-01-06 Perforation 6187.90 6188.40 8
2019-01-06 Perforation 6172.70 6173.20 8
2019-01-06 Multi-Stage Fracture 6172.70 6248.90 0
2019-01-06 Perforation 6157.60 6158.10 16
2019-01-06 Perforation 6142.50 6143.00 14
2019-01-06 Perforation 6127.30 6127.80 12
2019-01-02 Perforation 7050.60 7051.10 12
2019-01-06 Perforation 6112.20 6112.70 10
2019-01-06 Perforation 6097.00 6097.50 8
2019-01-06 Perforation 6081.90 6082.40 8
2019-01-06 Multi-Stage Fracture 6081.90 6158.10 0
2019-01-06 Perforation 6066.80 6067.30 16
2019-01-06 Perforation 6051.60 6052.10 14
2019-01-06 Perforation 6036.50 6037.00 12
2019-01-06 Perforation 6021.40 6021.90 10
2019-01-06 Perforation 6006.20 6006.70 8
2019-01-06 Perforation 5991.10 5991.60 8
2019-01-02 Perforation 7035.40 7035.90 10
2019-01-06 Multi-Stage Fracture 5991.10 6067.30 0
2019-01-06 Perforation 5976.00 5976.50 16
2019-01-06 Perforation 5960.80 5961.30 14
2019-01-06 Perforation 5945.70 5946.20 12
2019-01-06 Perforation 5930.60 5931.10 10
2019-01-06 Perforation 5915.40 5915.90 8
2019-01-06 Perforation 5900.30 5900.80 8
2019-01-06 Multi-Stage Fracture 5900.30 5976.50 0
2019-01-07 Perforation 5885.20 5885.70 16
2019-01-07 Perforation 5870.00 5870.50 14

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-02 2019-01-14 3,479 112,656 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.7366 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.2261 N/A
FRAC SAND. 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.59 N/A
Hydrochloric Acid 28% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.1348 N/A
Water 7732-18-5 100 0.1348 N/A
AQUCAR DB 20 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.009 N/A
Dibromoacetonitrile 3252-43-5 100 0.009 N/A
Polyethylene Glycol 25322-68-3 100 0.009 N/A
Sodium Bromide 7647-15-6 100 0.009 N/A
Water 7732-18-5 100 0.009 N/A
FraCare BREC EP BJ Services Breaker Ammonium persulphate 7727-54-0 100 0.0003 N/A
GBW-41LW BJ Services Breaker Hydrogen Peroxide 7722-84-1 100 0.0318 N/A
Methanol 67-56-1 100 0.0318 N/A
Non-hazardous Not Available 100 0.0318 N/A
BF-9L BJ Services Buffer potassium carbonate 584-08-7 100 0.0284 N/A
Potassium hydroxide 1310-58-3 100 0.0284 N/A
Water 7732-18-5 100 0.0284 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0009 N/A
Methanol 67-56-1 100 0.0009 N/A
Modified thiourea polymer 68527-49-1 100 0.0009 N/A
Olefin 64743-02-8 100 0.0009 N/A
Polyoxyalkylenes 68951-67-7 100 0.0009 N/A
Propargyl alcohol 107-19-7 100 0.0009 N/A
XLW-30SR BJ Services Crosslinker Acrylic Polymer 97953-25-8 100 0.024 N/A
Ethylene glycol 107-21-1 100 0.024 N/A
Inorganic Borates 1319-33-1 100 0.024 N/A
Polysaccharide 11138-66-2 100 0.024 N/A
Water 7732-18-5 100 0.024 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0011 N/A
Isopropanol 67-63-0 100 0.0011 N/A
Methanol 67-56-1 100 0.0011 N/A
ThinFrac HV FRHV-01 BJ Services Friction Reducer 1.2 Propanediol carbonate 108-32-7 100 0.1416 N/A
Distillates (petroleum) hydrotreated light paraffinic 64742-55-8 100 0.1416 N/A
Lecitihins. soya 8030-76-0 100 0.1416 N/A
polymer Trade Secret 100 0.1416 N/A
Water 7732-18-5 100 0.1416 N/A
GW-3 BJ Services Gelling Agent Guar Gum 9000-30-0 100 0.0169 N/A
ResCare IC 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0023 N/A
FraCare SI 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0225 N/A
Water 7732-18-5 100 0.0225 N/A
MatrixCare CI-01 BJ Services Scale Inhibitor 1.2-ethanediol 107-21-1 100 0.0004 N/A
1-decanol 112-30-1 100 0.0004 N/A
1-octanol 111-87-5 100 0.0004 N/A
2-butoxy ethanol 111-76-2 100 0.0004 N/A
2-propanol 67-63-0 100 0.0004 N/A
2-propenal. 3-phenyl- 104-55-2 100 0.0004 N/A
alcohols. C14-15. ethoxylated 68951-67-7 100 0.0004 N/A
azabenzene derivatives. quaternized. chloride salt 15619-48-4 100 0.0004 N/A
formamide. N.N-dimethyl- 68-12-2 100 0.0004 N/A
phosphoric acid. triethyl ester 78-40-0 100 0.0004 N/A
Water 7732-18-5 100 0.0004 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-02 2019-01-14 Surface Water - River 112206

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1591 0.0 0.0 0.0
2020 1875 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-11 No Incident Encountered 0.00 0.00
2019-01-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References