X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645212710000

Well Details

Well ID: 0645212710000
Loading map...
Location: 00/10-27-064-21W5/0
Location Alias: 00/10-27-64-21 W5M
Location Alias 2: 00/10-27-064-21 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 21
Section: 27
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY 16-14D TONY CKN 10-27-64-21
Operator Name: Murphy Oil Company Ltd.
License Number: 0486100
License Date: 2017-10-31
License Status: Amended
Spud Date: 2018-07-05
Final Drill Date: 2018-08-10
Well Total Depth: 6710.00 m
Surface Hole Latitude: 54.544465
Surface Hole Longitude: -117.050954

For data sources see[1][2]

Well History

Date Event
2017-10-31 Obtained License
2018-07-06 Surface Casing Operation Performed
2018-07-31 Direction Drilling Operation Performed - Deviate
2018-08-02 Intermediate Casing Operation Performed
2018-08-06 Well Log Performed
2018-08-07 Direction Drilling Operation Performed - Horizontal
2018-08-10 Finished Drilling
2018-08-10 Well Mode changed to Drilled and Cased
2018-08-11 Well Log Performed
2018-08-13 Production Casing Operation Performed
2018-08-14 Rig Released
2018-09-20 Perforation Treatment Performed - Open-Hole Completion
2018-09-21 Perforation Treatment Performed - Jet Perforation
2018-09-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-03 Perforation Treatment Performed - Fractured
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-04 Perforation Treatment Performed - Fractured
2018-10-04 Perforation Treatment Performed - Jet Perforation
2018-10-05 Perforation Treatment Performed - Fractured
2018-10-05 Perforation Treatment Performed - Jet Perforation
2018-10-06 Perforation Treatment Performed - Fractured
2018-10-06 Perforation Treatment Performed - Jet Perforation
2018-10-07 Perforation Treatment Performed - Fractured
2018-10-07 Perforation Treatment Performed - Jet Perforation
2018-10-08 Perforation Treatment Performed - Fractured
2018-10-08 Perforation Treatment Performed - Jet Perforation
2018-10-09 Perforation Treatment Performed - Fractured
2018-10-09 Perforation Treatment Performed - Jet Perforation
2018-10-10 Perforation Treatment Performed - Fractured
2018-10-10 Perforation Treatment Performed - Jet Perforation
2018-10-11 Perforation Treatment Performed - Fractured
2018-10-11 Perforation Treatment Performed - Jet Perforation
2018-10-12 Perforation Treatment Performed - Fractured
2018-10-12 Perforation Treatment Performed - Jet Perforation
2018-10-13 Perforation Treatment Performed - Fractured
2018-10-13 Perforation Treatment Performed - Jet Perforation
2018-10-14 Perforation Treatment Performed - Fractured
2018-10-14 Perforation Treatment Performed - Jet Perforation
2018-10-15 Perforation Treatment Performed - Fractured
2018-10-15 Perforation Treatment Performed - Jet Perforation
2018-10-16 Perforation Treatment Performed - Fractured
2018-10-16 Perforation Treatment Performed - Jet Perforation
2018-10-17 Perforation Treatment Performed - Fractured
2018-10-17 Perforation Treatment Performed - Jet Perforation
2018-10-18 Perforation Treatment Performed - Fractured
2018-10-18 Perforation Treatment Performed - Jet Perforation
2018-10-20 Perforation Treatment Performed - Fractured
2018-10-20 Perforation Treatment Performed - Jet Perforation
2018-10-22 Perforation Treatment Performed - Fractured
2018-10-22 Perforation Treatment Performed - Jet Perforation
2018-10-23 Perforation Treatment Performed - Fractured
2018-10-23 Perforation Treatment Performed - Jet Perforation
2018-10-24 Perforation Treatment Performed - Fractured
2018-10-24 Perforation Treatment Performed - Jet Perforation
2018-10-25 Perforation Treatment Performed - Fractured
2018-10-25 Perforation Treatment Performed - Jet Perforation
2018-10-26 Perforation Treatment Performed - Fractured
2018-10-26 Perforation Treatment Performed - Jet Perforation
2018-10-27 Perforation Treatment Performed - Fractured
2018-10-27 Perforation Treatment Performed - Jet Perforation
2018-10-28 Perforation Treatment Performed - Fractured
2018-10-28 Perforation Treatment Performed - Jet Perforation
2018-10-29 Perforation Treatment Performed - Fractured
2018-10-29 Perforation Treatment Performed - Jet Perforation
2018-10-30 Perforation Treatment Performed - Fractured
2018-10-30 Perforation Treatment Performed - Jet Perforation
2018-10-31 Perforation Treatment Performed - Fractured
2018-10-31 Perforation Treatment Performed - Jet Perforation
2018-11-01 Well Fluid changed to Gas
2018-11-01 Well Mode changed to Testing
2018-12-20 Well Began Production
2018-12-20 Well Fluid changed to Gas
2018-12-20 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-05 Precision Drilling Corporation 547 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-31 838.60 Deviate (5 - 79 degrees)
2018-08-07 3250.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-09-20 Open Hole/Barefoot Completion 6702.00 6710.00 0
2018-10-03 Perforation 6543.80 6544.30 3
2018-10-09 Perforation 5556.30 5556.80 3
2018-10-09 Perforation 5568.80 5569.30 3
2018-10-09 Perforation 5581.30 5581.80 3
2018-10-09 Perforation 5593.80 5594.30 2
2018-10-09 Fracture 5506.30 5594.30 0
2018-10-09 Perforation 5406.30 5406.80 2
2018-10-09 Perforation 5418.80 5419.30 3
2018-10-09 Perforation 5431.30 5431.80 3
2018-10-09 Perforation 5443.80 5444.30 3
2018-10-09 Perforation 5456.30 5456.80 3
2018-10-03 Perforation 6556.30 6556.80 3
2018-10-09 Perforation 5468.80 5469.30 3
2018-10-09 Perforation 5481.30 5481.80 3
2018-10-09 Perforation 5493.80 5494.30 2
2018-10-09 Fracture 5406.30 5494.30 0
2018-10-10 Perforation 5306.30 5306.80 2
2018-10-10 Perforation 5318.80 5319.30 3
2018-10-10 Perforation 5331.30 5331.80 3
2018-10-10 Perforation 5343.80 5344.30 3
2018-10-10 Perforation 5356.30 5356.80 3
2018-10-10 Perforation 5368.80 5369.30 3
2018-10-03 Perforation 6568.80 6569.30 3
2018-10-10 Perforation 5381.30 5381.80 3
2018-10-10 Perforation 5393.80 5394.30 2
2018-10-10 Fracture 5306.30 5394.30 0
2018-10-10 Perforation 5206.30 5206.80 2
2018-10-10 Perforation 5218.80 5219.30 3
2018-10-10 Perforation 5231.30 5231.80 3
2018-10-10 Perforation 5243.80 5244.30 3
2018-10-10 Perforation 5256.30 5256.80 3
2018-10-10 Perforation 5268.80 5269.30 3
2018-10-10 Perforation 5281.30 5281.80 3
2018-10-03 Perforation 6581.30 6581.80 3
2018-10-10 Perforation 5293.80 5294.30 2
2018-10-10 Fracture 5206.30 5294.30 0
2018-10-11 Perforation 5106.30 5106.80 2
2018-10-11 Perforation 5118.80 5119.30 3
2018-10-11 Perforation 5131.30 5131.80 3
2018-10-11 Perforation 5143.80 5144.30 3
2018-10-11 Perforation 5156.30 5156.80 3
2018-10-11 Perforation 5168.80 5169.30 3
2018-10-11 Perforation 5181.30 5181.80 3
2018-10-11 Perforation 5193.80 5194.30 2
2018-10-03 Perforation 6593.80 6594.30 2
2018-10-11 Fracture 5106.30 5194.30 0
2018-10-12 Perforation 5006.30 5006.80 2
2018-10-12 Perforation 5018.80 5019.30 3
2018-10-12 Perforation 5031.30 5031.80 3
2018-10-12 Perforation 5043.80 5044.30 3
2018-10-12 Perforation 5056.30 5056.80 3
2018-10-12 Perforation 5068.80 5069.30 3
2018-10-12 Perforation 5081.30 5081.80 3
2018-10-12 Perforation 5093.80 5094.30 2
2018-10-12 Fracture 5006.30 5094.30 0
2018-10-03 Fracture 6506.30 6594.30 0
2018-10-13 Perforation 4906.30 4906.80 2
2018-10-13 Perforation 4918.80 4919.30 3
2018-10-13 Perforation 4931.30 4931.80 3
2018-10-13 Perforation 4943.80 4944.30 3
2018-10-13 Perforation 4956.30 4956.80 3
2018-10-13 Perforation 4968.80 4969.30 3
2018-10-13 Perforation 4981.30 4981.80 3
2018-10-13 Perforation 4993.80 4994.30 2
2018-10-13 Fracture 4906.30 4994.30 0
2018-10-14 Perforation 4806.30 4806.80 2
2018-10-04 Perforation 6406.30 6406.80 2
2018-10-14 Perforation 4818.80 4819.30 3
2018-10-14 Perforation 4831.30 4831.80 3
2018-10-14 Perforation 4843.80 4844.30 3
2018-10-14 Perforation 4856.30 4856.80 3
2018-10-14 Perforation 4868.80 4869.30 3
2018-10-14 Perforation 4881.30 4881.80 3
2018-10-14 Perforation 4893.80 4894.30 2
2018-10-14 Fracture 4806.30 4894.30 0
2018-10-15 Perforation 4706.30 4706.80 2
2018-10-15 Perforation 4718.80 4719.30 3
2018-10-04 Perforation 6418.80 6419.30 3
2018-10-15 Perforation 4731.30 4731.80 3
2018-10-15 Perforation 4743.80 4744.30 3
2018-10-15 Perforation 4756.30 4756.80 3
2018-10-15 Perforation 4768.80 4769.30 3
2018-10-15 Perforation 4781.30 4781.80 3
2018-10-15 Perforation 4793.80 4794.30 2
2018-10-15 Fracture 4706.30 4794.30 0
2018-10-16 Perforation 4606.30 4606.80 2
2018-10-16 Perforation 4618.80 4619.30 3
2018-10-16 Perforation 4631.30 4631.80 3
2018-10-04 Perforation 6431.30 6431.80 3
2018-10-16 Perforation 4643.80 4644.30 3
2018-10-16 Perforation 4656.30 4656.80 3
2018-10-16 Perforation 4668.80 4669.30 3
2018-10-16 Perforation 4681.30 4681.80 3
2018-10-16 Perforation 4693.80 4694.30 2
2018-10-16 Fracture 4606.30 4694.30 0
2018-10-17 Perforation 4506.30 4506.80 2
2018-10-17 Perforation 4518.80 4519.30 3
2018-10-17 Perforation 4531.30 4531.80 3
2018-10-17 Perforation 4643.80 4644.30 3
2018-10-04 Perforation 6443.80 6444.30 3
2018-10-17 Perforation 4556.30 4556.80 3
2018-10-17 Perforation 4568.80 4569.30 3
2018-10-17 Perforation 4581.30 4581.80 3
2018-10-17 Perforation 4593.80 4594.30 2
2018-10-17 Fracture 4506.30 4594.30 0
2018-10-18 Perforation 4406.30 4406.80 2
2018-10-18 Perforation 4418.80 4419.30 3
2018-10-18 Perforation 4431.30 4431.80 3
2018-10-18 Perforation 4443.80 4444.30 3
2018-10-18 Perforation 4456.30 4456.80 3
2018-09-21 Perforation 6607.50 6608.00 3
2018-10-04 Perforation 6456.30 6456.80 3
2018-10-18 Perforation 4468.80 4469.30 3
2018-10-18 Perforation 4481.30 4481.80 3
2018-10-18 Perforation 4493.80 4494.30 2
2018-10-18 Fracture 4406.30 4494.30 0
2018-10-20 Perforation 4306.30 4306.80 2
2018-10-20 Perforation 4318.80 4319.30 3
2018-10-20 Perforation 4331.30 4331.80 3
2018-10-20 Perforation 4343.80 4344.30 3
2018-10-20 Perforation 4356.30 4356.80 3
2018-10-20 Perforation 4368.80 4369.30 3
2018-10-04 Perforation 6468.80 6469.30 3
2018-10-20 Perforation 4381.30 4381.80 3
2018-10-20 Perforation 4393.80 4394.30 2
2018-10-20 Fracture 4306.30 4394.30 0
2018-10-22 Perforation 4206.30 4206.80 2
2018-10-22 Perforation 4218.80 4219.30 3
2018-10-22 Perforation 4231.30 4231.80 3
2018-10-22 Perforation 4243.80 4244.30 3
2018-10-22 Perforation 4256.30 4256.80 3
2018-10-22 Perforation 4268.80 4269.30 3
2018-10-22 Perforation 4281.30 4281.80 3
2018-10-04 Perforation 6481.30 6481.80 3
2018-10-22 Perforation 4293.80 4294.30 2
2018-10-22 Fracture 4206.30 4294.30 0
2018-10-23 Perforation 4106.30 4106.80 2
2018-10-23 Perforation 4118.80 4119.30 3
2018-10-23 Perforation 4131.30 4131.80 3
2018-10-23 Perforation 4143.80 4144.30 3
2018-10-23 Perforation 4156.30 4156.80 3
2018-10-23 Perforation 4168.80 4169.30 3
2018-10-23 Perforation 4181.30 4181.80 3
2018-10-23 Perforation 4193.80 4194.30 2
2018-10-04 Perforation 6493.80 6494.30 2
2018-10-23 Fracture 4106.30 4194.30 0
2018-10-24 Perforation 4006.30 4006.80 2
2018-10-24 Perforation 4018.80 4019.30 3
2018-10-24 Perforation 4031.30 4031.80 3
2018-10-24 Perforation 4043.80 4044.30 3
2018-10-24 Perforation 4056.30 4056.80 3
2018-10-24 Perforation 4068.80 4069.30 3
2018-10-24 Perforation 4081.30 4081.80 3
2018-10-24 Perforation 4093.80 4094.30 2
2018-10-24 Fracture 4006.30 4094.30 0
2018-10-04 Fracture 6406.30 6494.30 0
2018-10-25 Perforation 3906.30 3906.80 2
2018-10-25 Perforation 3918.80 3919.30 3
2018-10-25 Perforation 3931.30 3931.80 3
2018-10-25 Perforation 3943.80 3944.30 3
2018-10-25 Perforation 3956.30 3956.80 3
2018-10-25 Perforation 3968.80 3969.30 3
2018-10-25 Perforation 3981.30 3981.80 3
2018-10-25 Perforation 3993.80 3994.30 2
2018-10-25 Fracture 3906.30 3994.30 0
2018-10-26 Perforation 3806.30 3806.80 2
2018-10-05 Perforation 6306.30 6306.80 2
2018-10-26 Perforation 3818.80 3819.30 3
2018-10-26 Perforation 3831.30 3831.80 3
2018-10-26 Perforation 3843.80 3844.30 3
2018-10-26 Perforation 3856.30 3856.80 3
2018-10-26 Perforation 3868.80 3869.30 3
2018-10-26 Perforation 3881.30 3881.80 3
2018-10-26 Perforation 3893.80 3894.30 2
2018-10-26 Fracture 3806.30 3894.30 0
2018-10-27 Perforation 3706.30 3706.80 2
2018-10-27 Perforation 3718.70 3819.30 3
2018-10-05 Perforation 6318.80 6319.30 3
2018-10-27 Perforation 3731.30 3731.80 3
2018-10-27 Perforation 3743.80 3744.30 3
2018-10-27 Perforation 3756.30 3756.80 3
2018-10-27 Perforation 3768.80 3769.30 3
2018-10-27 Perforation 3781.30 3781.80 3
2018-10-27 Perforation 3793.80 3794.30 2
2018-10-27 Fracture 3706.30 3794.30 0
2018-10-27 Perforation 3606.30 3606.80 2
2018-10-27 Perforation 3618.80 3619.30 3
2018-10-27 Perforation 3631.30 3631.80 3
2018-10-05 Perforation 6331.30 6331.80 3
2018-10-27 Perforation 3643.80 3644.30 3
2018-10-27 Perforation 3656.30 3656.80 3
2018-10-27 Perforation 3668.80 3669.30 3
2018-10-27 Perforation 3681.30 3681.80 3
2018-10-27 Perforation 3693.80 3694.30 2
2018-10-27 Fracture 3606.30 3694.30 0
2018-10-28 Perforation 3506.30 3506.80 2
2018-10-28 Perforation 3518.80 3519.30 3
2018-10-28 Perforation 3531.30 3531.80 3
2018-10-28 Perforation 3543.80 3544.30 3
2018-10-05 Perforation 6343.80 6344.30 3
2018-10-28 Perforation 3556.30 3556.80 3
2018-10-28 Perforation 3568.80 3569.30 3
2018-10-28 Perforation 3581.30 3581.80 3
2018-10-28 Perforation 3593.80 3594.30 2
2018-10-28 Fracture 3506.30 3594.30 0
2018-10-29 Perforation 3406.30 3406.80 2
2018-10-29 Perforation 3418.80 3419.30 3
2018-10-29 Perforation 3431.30 3431.80 3
2018-10-29 Perforation 3443.80 3444.30 3
2018-10-29 Perforation 3456.30 3456.80 3
2018-10-05 Perforation 6356.30 6356.80 3
2018-10-29 Perforation 3468.80 3469.30 3
2018-10-29 Perforation 3481.30 3481.80 3
2018-10-29 Perforation 3493.80 3494.30 2
2018-10-29 Fracture 3406.30 3494.30 0
2018-10-30 Perforation 3306.30 3306.80 2
2018-10-30 Perforation 3418.80 3419.30 3
2018-10-30 Perforation 3331.30 3331.80 3
2018-10-30 Perforation 3343.80 3344.30 3
2018-10-30 Perforation 3356.30 3356.80 3
2018-10-30 Perforation 3368.80 3369.30 3
2018-09-21 Perforation 6620.00 6620.50 3
2018-10-05 Perforation 6368.80 6369.30 3
2018-10-30 Perforation 3381.30 3381.80 3
2018-10-30 Perforation 3393.80 3394.30 2
2018-10-30 Fracture 3306.30 3394.30 0
2018-10-31 Perforation 3206.30 3206.80 2
2018-10-31 Perforation 3218.80 3219.30 3
2018-10-31 Perforation 3231.30 3231.80 3
2018-10-31 Perforation 3243.80 3244.30 3
2018-10-31 Perforation 3256.30 3256.80 3
2018-10-31 Perforation 3268.80 3269.30 3
2018-10-31 Perforation 3281.30 3281.80 3
2018-10-05 Perforation 6381.30 6381.80 3
2018-10-31 Perforation 3293.80 3294.30 2
2018-10-31 Fracture 3206.30 3294.30 0
2018-10-05 Fracture 6306.30 6381.80 0
2018-10-05 Perforation 6206.30 6206.80 2
2018-10-05 Perforation 6218.80 6219.30 3
2018-10-05 Perforation 6231.30 6231.80 3
2018-10-05 Perforation 6243.80 6244.30 3
2018-10-05 Perforation 6256.30 6256.80 3
2018-10-05 Perforation 6268.80 6269.30 3
2018-10-05 Perforation 6281.30 6281.80 3
2018-09-21 Perforation 6632.50 6633.00 3
2018-10-05 Perforation 6293.80 6294.30 2
2018-10-05 Fracture 6206.30 6294.30 0
2018-10-06 Perforation 6106.30 6106.80 2
2018-10-06 Perforation 6118.80 6119.30 3
2018-10-06 Perforation 6131.30 6131.80 3
2018-10-06 Perforation 6143.80 6144.30 3
2018-10-06 Perforation 6156.30 6156.80 3
2018-10-06 Perforation 6168.80 6169.30 3
2018-10-06 Perforation 6181.30 6181.80 3
2018-10-06 Perforation 6193.80 6194.30 2
2018-09-21 Perforation 6645.00 6645.50 3
2018-10-06 Fracture 6106.30 6194.30 0
2018-10-06 Perforation 6006.30 6006.80 2
2018-10-06 Perforation 6018.80 6019.30 3
2018-10-06 Perforation 6031.30 6031.80 3
2018-10-06 Perforation 6043.80 6044.30 3
2018-10-06 Perforation 6056.30 6056.80 3
2018-10-06 Perforation 6068.80 6069.30 3
2018-10-06 Perforation 6081.30 6081.80 3
2018-10-06 Perforation 6093.80 6094.30 2
2018-10-06 Fracture 6006.30 6094.30 0
2018-09-21 Multi-Stage Fracture 6607.50 6658.90 0
2018-10-07 Perforation 5906.30 5906.80 2
2018-10-07 Perforation 5918.80 5919.30 3
2018-10-07 Perforation 5931.30 5931.80 3
2018-10-07 Perforation 5943.80 5944.30 3
2018-10-07 Perforation 5956.30 5956.80 3
2018-10-07 Perforation 5968.80 5969.30 3
2018-10-07 Perforation 5981.30 5981.80 3
2018-10-07 Perforation 5993.80 5994.30 2
2018-10-07 Fracture 5906.30 5994.30 0
2018-10-07 Perforation 5806.30 5806.80 2
2018-10-03 Perforation 6506.30 6506.80 2
2018-10-07 Perforation 5818.80 5819.30 3
2018-10-07 Perforation 5831.30 5831.80 3
2018-10-07 Perforation 5843.80 5844.30 3
2018-10-07 Perforation 5856.30 5856.80 3
2018-10-07 Perforation 5868.80 5869.30 3
2018-10-07 Perforation 5881.30 5881.80 3
2018-10-07 Perforation 5893.80 5894.30 2
2018-10-07 Fracture 5806.30 5894.30 0
2018-10-08 Perforation 5706.30 5706.80 2
2018-10-08 Perforation 5718.80 5719.30 3
2018-10-03 Perforation 6518.80 6519.30 3
2018-10-08 Perforation 5731.30 5731.80 3
2018-10-08 Perforation 5743.80 5744.30 3
2018-10-08 Perforation 5756.30 5756.80 3
2018-10-08 Perforation 5768.80 5769.30 3
2018-10-08 Perforation 5781.30 5781.80 3
2018-10-08 Perforation 5793.80 5794.30 2
2018-10-08 Fracture 5706.30 5794.30 0
2018-10-08 Perforation 5606.30 5606.80 2
2018-10-08 Perforation 5618.80 5619.30 3
2018-10-08 Perforation 5631.30 5631.80 3
2018-10-03 Perforation 6531.30 6531.80 3
2018-10-08 Perforation 5643.80 5644.30 3
2018-10-08 Perforation 5656.30 5656.80 3
2018-10-08 Perforation 5668.80 5669.30 3
2018-10-08 Perforation 5681.30 5681.80 3
2018-10-08 Perforation 5693.80 5694.30 2
2018-10-08 Fracture 5606.30 5694.30 0
2018-10-09 Perforation 5506.30 5506.80 2
2018-10-09 Perforation 5518.80 5519.30 3
2018-10-09 Perforation 5531.30 5531.80 3
2018-10-09 Perforation 5543.80 5544.30 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-21 2018-10-31 3,073 99,760 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 89.8895 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 5.6493 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.793 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.3701 N/A
Water 7732-18-5 100 0.3701 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0092 N/A
Dibromoacetonitrile 3252-43-5 100 0.0092 N/A
Polyethylene Glycol 25322-68-3 100 0.0092 N/A
Sodium Bromide 7647-15-6 100 0.0092 N/A
Water 7732-18-5 100 0.0092 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0961 N/A
Non-hazardous Not Available 100 0.0961 N/A
Water 7732-18-5 100 0.0961 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0015 N/A
Methanol 67-56-1 100 0.0015 N/A
Modified thiourea polymer 68527-49-1 100 0.0015 N/A
Olefin 64743-02-8 100 0.0015 N/A
Polyoxyalkylenes 68951-67-7 100 0.0015 N/A
Propargyl alcohol 107-19-7 100 0.0015 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0004 N/A
Isopropanol 67-63-0 100 0.0004 N/A
Methanol 67-56-1 100 0.0004 N/A
XFRAC-01 BJ Services Friction Reducer Alcohols. C10-16. ethoxylated 68002-97-1 100 0.0681 N/A
Petroleum Distillates. Hydrotreated light naphthenic 64742-53-6 100 0.0681 N/A
Polyacrylamide 5/8/9003 100 0.0681 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0017 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0107 N/A
Water 7732-18-5 100 0.0107 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-09-20 2018-10-18 Surface Water - Runoff 40777
2018-10-18 2018-11-02 Surface Water - Runoff 41276

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 855 0.0 0.0 0.0
2019 8592 0.0 0.0 0.0
2020 2150 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-14 No Incident Encountered 0.00 0.00
2018-11-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References