X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645161601002

Well Details

Well ID: 0645161601002
Loading map...
Location: 00/01-16-064-16W5/2
Location Alias: 00/01-16-64-16 W5M
Location Alias 2: 00/01-16-064-16 W5/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 16
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: MURPHY TWOCK 4-21-64-16
Operator Name: Murphy Oil Company Ltd.
License Number: 0468761
License Date: 2014-07-30
License Status: Amended
Spud Date: 2015-02-07
Final Drill Date: 2015-03-18
Well Total Depth: 4817.00 m
Surface Hole Latitude: 54.546309
Surface Hole Longitude: -116.369522

For data sources see[1][2]

Well History

Date Event
2014-07-30 Obtained License
2015-02-09 Surface Casing Operation Performed
2015-02-26 Direction Drilling Operation Performed - Horizontal
2015-03-03 Well Log Performed
2015-03-18 Finished Drilling
2015-03-18 Well Log Performed
2015-03-18 Well Mode changed to Drilled and Cased
2015-03-21 Production Casing Operation Performed
2015-03-22 Rig Released
2017-02-27 Well Log Performed
2017-02-28 Well Log Performed
2018-10-19 Perforation Treatment Performed - Open-Hole Completion
2018-10-23 Perforation Treatment Performed - Fractured
2018-10-23 Perforation Treatment Performed - Jet Perforation
2018-11-08 Perforation Treatment Performed - Fractured
2018-11-08 Perforation Treatment Performed - Jet Perforation
2018-11-09 Perforation Treatment Performed - Fractured
2018-11-09 Perforation Treatment Performed - Jet Perforation
2018-11-10 Perforation Treatment Performed - Fractured
2018-11-10 Perforation Treatment Performed - Jet Perforation
2018-11-11 Perforation Treatment Performed - Fractured
2018-11-11 Perforation Treatment Performed - Jet Perforation
2018-11-12 Perforation Treatment Performed - Fractured
2018-11-12 Perforation Treatment Performed - Jet Perforation
2018-11-19 Well Began Production
2018-11-19 Well Fluid changed to Crude Oil
2018-11-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-02-26 2399.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-19 Open Hole/Barefoot Completion 4815.00 4817.00 0
2018-11-08 Perforation 4623.80 4624.30 2
2018-11-10 Perforation 3636.30 3636.80 2
2018-11-10 Perforation 3648.80 3649.30 2
2018-11-10 Perforation 3661.30 3661.80 2
2018-11-10 Perforation 3673.80 3674.30 2
2018-11-10 Fracture 3586.30 3674.30 0
2018-11-10 Perforation 3486.30 3486.80 2
2018-11-10 Perforation 3498.80 3499.30 2
2018-11-10 Perforation 3511.30 3511.80 2
2018-11-10 Perforation 3536.30 3536.80 2
2018-11-10 Perforation 3548.80 3549.30 2
2018-11-08 Perforation 4636.30 4636.80 2
2018-11-10 Perforation 3561.30 3561.80 2
2018-11-10 Perforation 3573.80 3574.30 2
2018-11-10 Fracture 3486.30 3574.30 0
2018-11-10 Perforation 3386.30 3386.80 2
2018-11-10 Perforation 3398.80 3399.30 2
2018-11-10 Perforation 3411.30 3411.80 2
2018-11-10 Perforation 3423.80 3424.30 2
2018-11-10 Perforation 3436.30 3436.80 2
2018-11-10 Perforation 3448.80 3449.30 2
2018-11-10 Perforation 3461.30 3461.80 2
2018-11-08 Perforation 4648.80 4649.30 2
2018-11-10 Perforation 3473.80 3474.30 2
2018-11-10 Fracture 3386.30 3474.30 0
2018-11-11 Perforation 3286.30 3286.80 2
2018-11-11 Perforation 3298.80 3299.30 2
2018-11-11 Perforation 3311.30 3311.80 2
2018-11-11 Perforation 3323.80 3324.30 2
2018-11-11 Perforation 3336.30 3336.80 2
2018-11-11 Perforation 3348.80 3349.30 2
2018-11-11 Perforation 3361.30 3361.80 2
2018-11-11 Perforation 3373.80 3374.30 2
2018-11-08 Perforation 4661.30 4661.80 2
2018-11-11 Fracture 3286.30 3374.30 0
2018-11-11 Perforation 3186.30 3186.80 2
2018-11-11 Perforation 3198.80 3199.30 2
2018-11-11 Perforation 3211.30 3211.80 2
2018-11-11 Perforation 3223.80 3224.30 2
2018-11-11 Perforation 3236.30 3236.80 2
2018-11-11 Perforation 3248.80 3249.30 2
2018-11-11 Perforation 3261.30 3261.80 2
2018-11-11 Perforation 3273.80 3274.30 2
2018-11-11 Fracture 3186.30 3274.30 0
2018-11-08 Perforation 4673.80 4674.30 2
2018-11-11 Perforation 3086.30 3086.80 2
2018-11-11 Perforation 3098.80 3099.30 2
2018-11-11 Perforation 3111.30 3111.80 2
2018-11-11 Perforation 3123.80 3124.30 2
2018-11-11 Perforation 3136.30 3136.80 2
2018-11-11 Perforation 3148.80 3149.30 2
2018-11-11 Perforation 3161.30 3161.80 2
2018-11-11 Perforation 3173.80 3174.30 2
2018-11-11 Fracture 3086.30 3174.30 0
2018-11-12 Perforation 2986.30 2986.80 2
2018-11-08 Fracture 4586.30 4674.30 0
2018-11-12 Perforation 2998.80 2999.30 2
2018-11-12 Perforation 3011.30 3011.80 2
2018-11-12 Perforation 3023.80 3024.30 2
2018-11-12 Perforation 3036.30 3036.80 2
2018-11-12 Perforation 3048.80 3049.30 2
2018-11-12 Perforation 3061.30 3061.80 2
2018-11-12 Perforation 3073.80 3074.30 2
2018-11-12 Fracture 2986.30 3074.30 0
2018-11-08 Perforation 4486.30 4486.80 2
2018-11-08 Perforation 4511.30 4511.80 2
2018-11-08 Perforation 4523.80 4524.30 2
2018-11-08 Perforation 4536.30 4536.80 2
2018-10-23 Perforation 4690.00 4690.50 4
2018-11-08 Perforation 4548.80 4549.30 2
2018-11-08 Perforation 4561.30 4561.80 2
2018-11-08 Perforation 4573.80 4574.30 2
2018-11-08 Fracture 4486.30 4574.30 0
2018-11-09 Perforation 4386.30 4386.80 2
2018-11-09 Perforation 4398.80 4399.30 2
2018-11-09 Perforation 4411.30 4411.80 2
2018-11-09 Perforation 4423.80 4424.30 2
2018-11-09 Perforation 4436.30 4436.80 2
2018-11-09 Perforation 4448.80 4449.30 2
2018-10-23 Perforation 4710.00 4710.50 4
2018-11-09 Perforation 4461.30 4461.80 2
2018-11-09 Perforation 4473.80 4474.30 2
2018-11-09 Fracture 4386.30 4474.30 0
2018-11-09 Perforation 4286.30 4286.80 2
2018-11-09 Perforation 4298.80 4299.30 2
2018-11-09 Perforation 4311.30 4311.80 2
2018-11-09 Perforation 4323.80 4324.30 2
2018-11-09 Perforation 4336.30 4336.80 2
2018-11-09 Perforation 4348.80 4349.30 2
2018-11-09 Perforation 4361.30 4361.80 2
2018-10-23 Perforation 4730.00 4730.50 4
2018-11-09 Perforation 4373.80 4374.30 2
2018-11-09 Fracture 4286.30 4374.30 0
2018-11-09 Perforation 4186.30 4186.80 2
2018-11-09 Perforation 4198.80 4199.30 2
2018-11-09 Perforation 4211.30 4211.80 2
2018-11-09 Perforation 4223.80 4224.30 2
2018-11-09 Perforation 4236.30 4236.80 2
2018-11-09 Perforation 4248.80 4249.30 2
2018-11-09 Perforation 4261.30 4261.80 2
2018-11-09 Perforation 4273.80 4274.30 2
2018-10-23 Perforation 4750.00 4750.50 4
2018-11-09 Fracture 4186.30 4274.30 0
2018-11-09 Perforation 4086.30 4086.80 2
2018-11-09 Perforation 4098.80 4099.30 2
2018-11-09 Perforation 4111.30 4111.80 2
2018-11-09 Perforation 4123.80 4124.30 2
2018-11-09 Perforation 4136.30 4136.80 2
2018-11-09 Perforation 4148.80 4149.30 2
2018-11-09 Perforation 4161.30 4161.80 2
2018-11-09 Perforation 4173.80 4174.30 2
2018-11-09 Fracture 4086.30 4174.30 0
2018-10-23 Fracture 4690.00 4750.50 0
2018-11-09 Perforation 3986.30 3986.80 2
2018-11-09 Perforation 3998.80 3999.30 2
2018-11-09 Perforation 4011.30 4011.80 2
2018-11-09 Perforation 4023.80 4024.30 2
2018-11-09 Perforation 4036.30 4036.80 2
2018-11-09 Perforation 4048.80 4049.30 2
2018-11-09 Perforation 4061.30 4061.80 2
2018-11-09 Perforation 4073.80 4074.30 2
2018-11-09 Fracture 3986.30 4074.30 0
2018-11-10 Perforation 3886.30 3886.80 2
2018-11-08 Perforation 4586.30 4586.80 2
2018-11-10 Perforation 3898.80 3899.30 2
2018-11-10 Perforation 3911.30 3911.80 2
2018-11-10 Perforation 3923.80 3924.30 2
2018-11-10 Perforation 3936.30 3936.80 2
2018-11-10 Perforation 3948.80 3949.30 2
2018-11-10 Perforation 3961.30 3961.80 2
2018-11-10 Perforation 3973.80 3974.30 2
2018-11-10 Fracture 3886.30 3974.30 0
2018-11-10 Perforation 3786.30 3786.80 2
2018-11-10 Perforation 3798.80 3799.30 2
2018-11-08 Perforation 4598.80 4599.30 2
2018-11-10 Perforation 3811.30 3811.80 2
2018-11-10 Perforation 3823.80 3824.30 2
2018-11-10 Perforation 3836.30 3836.80 2
2018-11-10 Perforation 3848.80 3849.30 2
2018-11-10 Perforation 3861.30 3861.80 2
2018-11-10 Perforation 3873.80 3874.30 2
2018-11-10 Fracture 3786.30 3874.30 0
2018-11-10 Perforation 3686.30 3686.80 2
2018-11-10 Perforation 3698.80 3699.30 2
2018-11-10 Perforation 3711.30 3711.80 2
2018-11-08 Perforation 4611.30 4611.80 2
2018-11-10 Perforation 3723.80 3724.30 2
2018-11-10 Perforation 3736.30 3736.80 2
2018-11-10 Perforation 3748.80 3749.30 2
2018-11-10 Perforation 3761.30 3761.80 2
2018-11-10 Perforation 3773.80 3774.30 2
2018-11-10 Fracture 3686.30 3774.30 0
2018-11-10 Perforation 3586.30 3586.80 2
2018-11-10 Perforation 3598.80 3599.30 2
2018-11-10 Perforation 3611.30 3611.80 2
2018-11-10 Perforation 3623.80 3624.30 2

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-23 2018-11-12 2,794 22,290 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.2538 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 10.7246 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.7613 N/A
Water 7732-18-5 100 0.7613 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0089 N/A
Dibromoacetonitrile 3252-43-5 100 0.0089 N/A
Polyethylene Glycol 25322-68-3 100 0.0089 N/A
Sodium Bromide 7647-15-6 100 0.0089 N/A
Water 7732-18-5 100 0.0089 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.097 N/A
Non-hazardous Not Available 100 0.097 N/A
Water 7732-18-5 100 0.097 N/A
CI-27 BJ Services Corrosion Inhibitor Fatty acids 61790-12-3 100 0.0032 N/A
Methanol 67-56-1 100 0.0032 N/A
Modified thiourea polymer 68527-49-1 100 0.0032 N/A
Olefin 64743-02-8 100 0.0032 N/A
Polyoxyalkylenes 68951-67-7 100 0.0032 N/A
Propargyl alcohol 107-19-7 100 0.0032 N/A
FP-12L BJ Services Defoamer Methylcellulose 9004-67-5 100 0 N/A
Non-hazardous Not Available 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0.0001 N/A
Polydimethylsiloxane 63148-62-9 100 0 N/A
Water 7732-18-5 100 0 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0008 N/A
Isopropanol 67-63-0 100 0.0008 N/A
Methanol 67-56-1 100 0.0008 N/A
XFRAC-01 BJ Services Friction Reducer Alcohols. C10-16. ethoxylated 68002-97-1 100 0.0401 N/A
Petroleum Distillates. Hydrotreated light naphthenic 64742-53-6 100 0.0401 N/A
Polyacrylamide 5/8/9003 100 0.0401 N/A
Ferrotrol 800 BJ Services Iron Control Trisodium nitrilotriacetate monohydrate 18662-53-8 100 0.0035 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-10-26 2018-11-12 Surface Water - Runoff 22729

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1066 0.0 0.0 0.0
2019 7813 0.0 0.0 0.0
2020 2019 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-21 No Incident Encountered 0.00 0.00
2018-11-18 No Incident Encountered 0.00 0.00

For data sources see[9]

References