X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645133213000

Well Details

Well ID: 0645133213000
Loading map...
Location: 00/13-32-064-13W5/0
Location Alias: 00/13-32-64-13 W5M
Location Alias 2: 00/13-32-064-13 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 13
Section: 32
County/Municipality: Big Lakes County
Well Name: CPEC HZ VIRG 13-32-64-13
Operator Name: Crescent Point Energy Corp.
License Number: 0442718
License Date: 2012-01-12
License Status: Issued
Spud Date: 2012-01-24
Final Drill Date: 2012-02-11
Well Total Depth: 4505.00 m
Surface Hole Latitude: 54.575992
Surface Hole Longitude: -115.921090

For data sources see[1][2]

Well History

Date Event
2012-01-12 Obtained License
2012-01-25 Surface Casing Operation Performed
2012-02-01 Well Log Performed
2012-02-03 Direction Drilling Operation Performed - Horizontal
2012-02-03 Well Log Performed
2012-02-04 Intermediate Casing Operation Performed
2012-02-11 Finished Drilling
2012-02-11 Well Log Performed
2012-02-11 Well Mode changed to Drilled and Cased
2012-02-14 Liner Casing Operation Performed
2012-02-14 Perforation Treatment Performed - Open-Hole Completion
2012-02-15 Rig Released
2012-02-15 Well Log Performed
2012-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-13 Well Began Production
2012-03-13 Well Fluid changed to Crude Oil
2012-03-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-24 Horizon Drilling Inc. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-03 2533.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-14 Open Hole/Barefoot Completion 4501.00 4505.00 0
2012-03-12 Multi-Stage Fracture 3602.20 3603.00 0
2012-03-12 Multi-Stage Fracture 3678.40 3679.20 0
2012-03-12 Multi-Stage Fracture 3742.90 3743.70 0
2012-03-12 Multi-Stage Fracture 3805.90 3806.70 0
2012-03-12 Multi-Stage Fracture 3882.00 3882.80 0
2012-03-12 Multi-Stage Fracture 3945.70 3946.90 0
2012-03-12 Multi-Stage Fracture 4021.90 4022.70 0
2012-03-12 Multi-Stage Fracture 4086.00 4086.80 0
2012-03-12 Multi-Stage Fracture 4163.80 4164.60 0
2012-03-12 Multi-Stage Fracture 4228.30 4229.10 0
2012-03-12 Multi-Stage Fracture 3050.90 3051.70 0
2012-03-12 Multi-Stage Fracture 4292.30 4293.10 0
2012-03-12 Multi-Stage Fracture 4368.00 4368.80 0
2012-03-12 Multi-Stage Fracture 4431.90 4432.70 0
2012-03-12 Multi-Stage Fracture 4491.70 4493.10 0
2012-03-12 Multi-Stage Fracture 3115.10 3115.90 0
2012-03-12 Multi-Stage Fracture 3192.70 3193.50 0
2012-03-12 Multi-Stage Fracture 3256.10 3256.90 0
2012-03-12 Multi-Stage Fracture 3321.80 3322.60 0
2012-03-12 Multi-Stage Fracture 3397.70 3398.50 0
2012-03-12 Multi-Stage Fracture 3461.90 3462.70 0
2012-03-12 Multi-Stage Fracture 3537.70 3538.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6003 0.0 0.0 0.0
2013 8379 0.0 0.0 0.0
2014 8296 0.0 0.0 0.0
2015 6165 0.0 0.0 0.0
2016 7961 0.0 0.0 0.0
2017 7600 0.0 0.0 0.0
2018 7580 0.0 0.0 0.0
2019 8597 0.0 0.0 0.0
2020 2058 0.0 0.0 0.0

For data sources see[7]

References