X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645130610003

Well Details

Well ID: 0645130610003
Loading map...
Location: 00/10-06-064-13W5/3
Location Alias: 00/10-06-64-13 W5M
Location Alias 2: 00/10-06-064-13 W5/03
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 13
Section: 06
County/Municipality: Big Lakes County
Well Name: ACL HOPE CREEK 10-6-64-13
Operator Name: Paramount Resources Ltd.
License Number: 0021705
License Date: 1961-11-17
License Status: Suspension
Spud Date: 1961-11-25
Final Drill Date: 1962-01-02
Well Total Depth: 2842.30 m
Surface Hole Latitude: 54.511027
Surface Hole Longitude: -115.951403

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-11-17 Obtained License
1962-01-02 Finished Drilling
1962-01-02 Well Mode changed to Drilled and Cased
1962-01-05 Drill Stem Test Performed
1962-01-08 Drill Stem Test Performed
1962-01-11 Drill Stem Test Performed
1962-01-12 Drill Stem Test Performed
1962-01-14 Production Casing Operation Performed
1962-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-18 Perforation Treatment Performed - Selective Jet Perforations
1962-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-20 Perforation Treatment Performed - Selective Jet Perforations
1962-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-24 Perforation Treatment Performed - Jet Perforation
1971-02-15 Well Began Injection
1971-02-15 Well Fluid changed to Gas
1971-02-15 Well Type changed to Injection
1971-03-26 Well Fluid changed to Gas
1971-03-26 Well Mode changed to Suspended
1971-03-26 Well Type changed to Injection
1978-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-03-21 Perforation Treatment Performed - Jet Perforation
1978-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-01-18 Selective Jet Perforations 2782.20 2785.00 0
1969-09-24 Perforation 1817.80 1820.90 7
1969-09-24 Acid Treatment 1817.80 1820.90 0
1978-03-18 Packing Device Capped w/Cement 2660.30 2706.00 0
1978-03-21 Perforation 1825.40 1830.00 7
1978-04-07 Acid Treatment 1825.40 1830.00 0
1962-01-18 Acid Treatment 2782.20 2785.00 0
1962-01-20 Selective Jet Perforations 2770.90 2771.50 0
1962-01-20 Selective Jet Perforations 2773.40 2773.70 0
1962-01-20 Selective Jet Perforations 2774.30 2775.20 0
1962-01-20 Selective Jet Perforations 2780.10 2780.40 0
1962-01-20 Acid Treatment 2770.90 2785.00 0
1962-06-26 Acid Treatment 2770.90 2785.00 0
1963-10-23 Acid Treatment 2770.90 2785.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 0 0.0 0.0 0.0

For data sources see[5]

References