X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645122210000

Well Details

Well ID: 0645122210000
Loading map...
Location: 00/10-22-064-12W5/0
Location Alias: 00/10-22-64-12 W5M
Location Alias 2: 00/10-22-064-12 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 12
Section: 22
County/Municipality: Big Lakes County
Well Name: 1976082 JUDYCK 10-22-64-12
Operator Name: Razor Energy Corp.
License Number: 0036510
License Date: 1969-07-09
License Status: Abandoned
Spud Date: 1969-08-20
Final Drill Date: 1969-08-25
Well Total Depth: 1426.50 m
Surface Hole Latitude: 54.555478
Surface Hole Longitude: -115.723897

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-07-09 Obtained License
1969-08-25 Finished Drilling
1969-08-25 Well Mode changed to Drilled and Cased
1969-08-26 Drill Stem Test Performed
1969-08-27 Production Casing Operation Performed
1969-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-09-16 Perforation Treatment Performed - Jet Perforation
1969-09-16 Well Began Production
1969-09-16 Well Fluid changed to Crude Oil
1969-09-16 Well Mode changed to Flowing
1970-01-22 Well Fluid changed to Crude Oil
1970-01-22 Well Mode changed to Pumping
1982-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-07-25 Well Log Performed
1983-07-26 Perforation Treatment Performed - Jet Perforation
1988-08-01 Well Fluid changed to Crude Oil
1988-08-01 Well Mode changed to Suspended
1988-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-07 Plug Back Performed
1988-10-08 Well Abandoned
1988-10-08 Well Fluid changed to Crude Oil
1988-10-08 Well Mode changed to Abandoned
1990-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-27 Perforation Treatment Performed - Jet Perforation
1990-09-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-09-16 Perforation 1406.30 1408.80 7
1969-09-16 Acid Treatment 1406.30 1408.80 0
1982-08-13 Acid Treatment 1406.30 1408.80 0
1983-07-26 Perforation 1405.70 1406.30 13
1988-10-07 Packing Device Capped w/Cement 1394.00 1402.00 0
1990-09-27 Perforation 348.00 349.00 7
1990-09-27 Acid Treatment 348.00 349.00 0
1990-09-28 Remedial Casing Cementing 348.00 349.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 99 0.0 0.0 0.0
1970 3678 0.0 0.0 0.0
1971 6116 0.0 0.0 0.0
1972 5710 0.0 0.0 0.0
1973 6957 0.0 0.0 0.0
1974 5481 0.0 0.0 0.0
1975 6671 0.0 0.0 0.0
1976 6316 0.0 0.0 0.0
1977 6730 0.0 0.0 0.0
1978 7931 0.0 0.0 0.0
1979 8247 0.0 0.0 0.0
1980 8033 0.0 0.0 0.0
1981 8388 0.0 0.0 0.0
1982 8358 0.0 0.0 0.0
1983 8106 0.0 0.0 0.0
1984 8048 0.0 0.0 0.0
1985 8175 0.0 0.0 0.0
1986 5504 0.0 0.0 0.0

For data sources see[5]

References