X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645111602000

Well Details

Well ID: 0645111602000
Loading map...
Location: 00/02-16-064-11W5/0
Location Alias: 00/02-16-64-11 W5M
Location Alias 2: 00/02-16-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 16
County/Municipality: Big Lakes County
Well Name: IMP JUDY CREEK 2-16BL-64-11
Operator Name: Cona Resources Ltd.
License Number: 0021140
License Date: 1961-08-02
License Status: RecCertified
Spud Date: 1961-08-08
Final Drill Date: 1961-08-27
Well Total Depth: 2680.40 m
Surface Hole Latitude: 54.532065
Surface Hole Longitude: -115.598120

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-08-02 Obtained License
1961-08-14 Drill Stem Test Performed
1961-08-27 Finished Drilling
1961-08-27 Well Mode changed to Drilled and Cased
1961-08-28 Production Casing Operation Performed
1961-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-10 Perforation Treatment Performed - Jet Perforation
1961-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-26 Perforation Treatment Performed - Cement Squeeze
1961-09-28 Perforation Treatment Performed - Cement Squeeze
1961-10-04 Perforation Treatment Performed - Jet Perforation
1961-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-22 Well Began Production
1961-10-22 Well Fluid changed to Crude Oil
1961-10-22 Well Mode changed to Flowing
1961-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-04 Perforation Treatment Performed - Cement Squeeze
1962-06-05 Perforation Treatment Performed - Jet Perforation
1962-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-30 Perforation Treatment Performed - Jet Perforation
1973-07-01 Well Began Injection
1973-07-01 Well Fluid changed to Water
1973-07-01 Well Type changed to Injection
1973-07-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-31 Perforation Treatment Performed - Jet Perforation
1974-03-12 Perforation Treatment Performed - Cement Plug
1974-03-12 Perforation Treatment Performed - Cement Squeeze
1974-03-14 Perforation Treatment Performed - Cement Plug
1974-03-16 Perforation Treatment Performed - Cement Plug
1974-03-18 Well Fluid changed to Water
1974-03-18 Well Mode changed to Suspended
1974-03-18 Well Type changed to Injection
1996-08-23 Well Abandoned
1996-08-23 Well Fluid changed to Water
1996-08-23 Well Mode changed to Abandoned
1996-08-23 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-10 Perforation 2616.70 2617.90 3
1961-10-04 Perforation 2616.40 2618.20 3
1961-10-04 Perforation 2619.10 2620.40 3
1961-10-04 Perforation 2621.30 2623.40 3
1961-10-05 Acid Treatment 2610.30 2623.40 0
1961-10-26 Acid Treatment 2610.30 2623.40 0
1962-06-04 Cement Squeeze 2610.30 2623.40 0
1962-06-05 Perforation 2610.30 2614.90 13
1962-06-05 Perforation 2616.40 2618.20 13
1962-06-05 Perforation 2619.10 2620.40 13
1962-06-05 Perforation 2621.30 2623.40 13
1961-09-10 Perforation 2619.10 2620.40 3
1962-06-12 Acid Treatment 2610.30 2623.40 0
1962-06-13 Acid Treatment 2610.30 2623.40 0
1973-06-30 Perforation 2640.20 2648.70 3
1973-07-02 Acid Treatment 2640.20 2648.70 0
1973-08-31 Perforation 2640.20 2648.70 3
1973-08-31 Acid Treatment 2640.20 2648.70 0
1974-03-12 Cement Squeeze 2610.30 2648.70 0
1974-03-12 Cement Plug 2610.90 2629.80 0
1974-03-14 Cement Plug 2607.60 2610.90 0
1974-03-16 Cement Plug 2476.20 2607.60 0
1961-09-10 Perforation 2621.60 2623.40 3
1961-09-10 Perforation 2627.10 2632.90 3
1961-09-10 Acid Treatment 2616.70 2632.90 0
1961-09-15 Acid Treatment 2616.70 2632.90 0
1961-09-26 Cement Squeeze 2617.00 2633.20 0
1961-09-28 Cement Squeeze 2617.00 2633.20 0
1961-10-04 Perforation 2610.30 2614.90 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0

For data sources see[5]

References