Well Details

Well ID: 0645110504000
Loading map...
Location: 00/04-05-064-11W5/0
Location Alias: 00/04-05-64-11 W5M
Location Alias 2: 00/04-05-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 05
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 4-5-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0022024
License Date: 1962-01-31
License Status: Abandoned
Spud Date: 1962-02-05
Final Drill Date: 1962-03-09
Well Total Depth: 2802.30 m
Surface Hole Latitude: 54.503316
Surface Hole Longitude: -115.636214

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-01-31 Obtained License
1962-02-06 Lost Circulation Occurred
1962-03-04 Production Casing Operation Performed
1962-03-09 Finished Drilling
1962-03-09 Perforation Treatment Performed - Open-Hole Completion
1962-03-09 Well Mode changed to Drilled and Cased
1962-03-17 Well Began Production
1962-03-17 Well Fluid changed to Crude Oil
1962-03-17 Well Mode changed to Flowing
1972-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-23 Well Fluid changed to Crude Oil
1980-03-23 Well Mode changed to Gas Lift
1982-06-14 Perforation Treatment Performed - Cement Plug
1982-06-14 Perforation Treatment Performed - Open-Hole Completion
1984-03-28 Well Fluid changed to Crude Oil
1984-03-28 Well Mode changed to Suspended
1986-07-02 Well Log Performed
1986-07-14 Perforation Treatment Performed - Abrasa-Jet Perforation
1986-07-14 Perforation Treatment Performed - Open-Hole Completion
1986-09-18 Well Began Injection
1986-09-18 Well Fluid changed to Water
1986-09-18 Well Type changed to Injection
1987-04-26 Well Fluid changed to Solvent
1987-04-26 Well Type changed to Injection
1987-05-04 Well Log Performed
1988-06-27 Perforation Treatment Performed - Open-Hole Completion
1988-06-29 Liner Casing Operation Performed
1988-06-29 Perforation Treatment Performed - Cement Squeeze
1988-07-02 Perforation Treatment Performed - Jet Perforation
1988-07-02 Well Log Performed
1988-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-04 Well Log Performed
1988-07-07 Perforation Treatment Performed - Jet Perforation
1988-07-09 Perforation Treatment Performed - Cement Squeeze
1988-07-11 Perforation Treatment Performed - Cement Squeeze
1988-07-16 Perforation Treatment Performed - Jet Perforation
1988-07-16 Well Log Performed
1988-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-18 Perforation Treatment Performed - Jet Perforation
1988-07-26 Perforation Treatment Performed - Jet Perforation
1988-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-09 Well Log Performed
1988-08-24 Well Log Performed
1989-11-17 Well Log Performed
1989-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-07 Well Log Performed
1990-11-12 Well Fluid changed to Solvent
1990-11-12 Well Mode changed to Suspended
1990-11-12 Well Type changed to Injection
1994-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-16 Plug Back Performed
1994-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-22 Perforation Treatment Performed - Jet Perforation
1994-02-22 Well Log Performed
1994-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-02-24 Perforation Treatment Performed - Remedial Casing
1994-02-26 Well Abandoned
1994-02-26 Well Fluid changed to Solvent
1994-02-26 Well Mode changed to Abandoned
1994-02-26 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-03-09 Open Hole/Barefoot Completion 2746.20 2781.90 0
1988-07-03 Acid Treatment 2744.50 2747.50 0
1988-07-07 Perforation 2759.80 2761.80 7
1988-07-07 Perforation 2774.30 2776.30 7
1988-07-07 Perforation 2777.00 2779.00 7
1988-07-09 Cement Squeeze 2759.80 2779.00 0
1988-07-11 Cement Squeeze 2744.50 2747.50 0
1988-07-16 Perforation 2744.50 2747.50 7
1988-07-17 Acid Treatment 2744.50 2747.50 0
1988-07-18 Perforation 2750.00 2755.50 7
1988-07-18 Perforation 2759.80 2769.50 7
1972-10-22 Acid Treatment 2746.20 2781.60 0
1988-07-26 Perforation 2773.80 2776.10 7
1988-07-26 Perforation 2775.90 2781.20 13
1988-07-27 Acid Treatment 2750.00 2769.50 0
1988-07-28 Acid Treatment 2773.80 2781.20 0
1989-12-04 Acid Treatment 2759.80 2769.50 0
1994-02-16 Packing Device Capped w/Cement 2685.00 2693.00 0
1994-02-21 Packing Device Capped w/Cement 930.60 948.60 0
1994-02-22 Perforation 402.00 403.00 13
1994-02-24 Remedial Casing Cementing 402.00 403.00 0
1994-02-24 Packing Device Capped w/Cement 324.20 383.50 0
1982-06-14 Cement Plug 2765.70 2781.90 0
1982-06-14 Open Hole/Barefoot Completion 2746.20 2765.70 0
1986-07-14 Open Hole/Barefoot Completion 2746.20 2782.70 0
1986-07-14 Hydra Jet Perforation 2765.70 2782.50 0
1988-06-27 Open Hole/Barefoot Completion 2746.20 2783.90 0
1988-06-29 Cement Squeeze 2746.20 2783.90 0
1988-07-02 Perforation 2744.50 2747.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8250 0.0 0.0 0.0
1968 8232 0.0 0.0 0.0
1969 7062 0.0 0.0 0.0
1970 5760 0.0 0.0 0.0
1971 6808 0.0 0.0 0.0
1972 5531 0.0 0.0 0.0
1973 6641 0.0 0.0 0.0
1974 5656 0.0 0.0 0.0
1975 3308 0.0 0.0 0.0
1976 4696 0.0 0.0 0.0
1977 5598 0.0 0.0 0.0
1978 6978 0.0 0.0 0.0
1979 7958 0.0 0.0 0.0
1980 7838 0.0 0.0 0.0
1981 8171 0.0 0.0 0.0
1982 6369 0.0 0.0 0.0
1983 3065 0.0 0.0 0.0
1984 1023 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1962-02-06 Lost Circulation 121.90 121.90

For data sources see[6]