X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645110412000

Well Details

Well ID: 0645110412000
Loading map...
Location: 00/12-04-064-11W5/0
Location Alias: 00/12-04-64-11 W5M
Location Alias 2: 00/12-04-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 04
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 12-4-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0020060
License Date: 1960-11-28
License Status: Abandoned
Spud Date: 1960-12-01
Final Drill Date: 1961-01-03
Well Total Depth: 2755.40 m
Surface Hole Latitude: 54.510555
Surface Hole Longitude: -115.610897

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-11-28 Obtained License
1960-12-02 Lost Circulation Occurred
1961-01-03 Finished Drilling
1961-01-03 Well Mode changed to Drilled and Cased
1961-01-04 Production Casing Operation Performed
1961-01-19 Perforation Treatment Performed - Jet Perforation
1961-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-01-24 Well Began Production
1961-01-24 Well Fluid changed to Crude Oil
1961-01-24 Well Mode changed to Flowing
1961-10-04 Perforation Treatment Performed - Resin-Gypsum Squeeze Or Plug
1961-11-05 Well Fluid changed to Crude Oil
1961-11-05 Well Mode changed to Pumping
1961-12-21 Perforation Treatment Performed - Cement Squeeze
1961-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-29 Perforation Treatment Performed - Jet Perforation
1962-04-12 Well Began Injection
1962-04-12 Well Fluid changed to Water
1962-04-12 Well Type changed to Injection
1962-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-30 Well Fluid changed to Water
1981-10-30 Well Mode changed to Suspended
1981-10-30 Well Type changed to Injection
1996-10-04 Perforation Treatment Performed - Jet Perforation
1996-10-04 Well Log Performed
1996-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-07 Well Log Performed
1996-10-08 Well Log Performed
1996-10-10 Perforation Treatment Performed - Cement Squeeze
1996-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-14 Perforation Treatment Performed - Jet Perforation
1996-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-15 Well Log Performed
1996-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-10-22 Plug Back Performed
1996-10-22 Well Fluid changed to Water
1996-10-22 Well Mode changed to Abandoned Zone
1996-10-22 Well Type changed to Injection
1999-08-23 Perforation Treatment Performed - Jet Perforation
1999-09-20 Perforation Treatment Performed - Remedial Casing
1999-10-05 Well Abandoned
1999-10-05 Well Fluid changed to Water
1999-10-05 Well Mode changed to Abandoned
1999-10-05 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-01-19 Perforation 2696.90 2701.40 3
1961-12-29 Perforation 2732.20 2739.20 3
1961-12-29 Acid Treatment 2714.90 2739.20 0
1962-09-10 Acid Treatment 2714.90 2739.20 0
1963-11-05 Acid Treatment 2714.90 2739.20 0
1963-12-22 Acid Treatment 2714.90 2739.20 0
1968-03-12 Acid Treatment 2714.90 2739.20 0
1996-10-04 Perforation 2694.70 2698.70 7
1996-10-04 Perforation 2699.60 2700.50 7
1996-10-04 Perforation 2702.00 2707.20 7
1996-10-07 Acid Treatment 2694.70 2707.20 0
1961-01-19 Perforation 2702.40 2703.30 3
1996-10-10 Cement Squeeze 2694.70 2707.20 0
1996-10-14 Packing Device Capped w/Cement 2705.30 2710.80 0
1996-10-14 Perforation 2694.80 2698.90 13
1996-10-14 Perforation 2699.80 2700.70 13
1996-10-15 Acid Treatment 2694.80 2700.70 0
1996-10-22 Packing Device Capped w/Cement 2672.00 2682.00 0
1999-08-23 Perforation 401.00 402.00 14
1999-09-20 Remedial Casing Cementing 71.00 417.00 0
1961-01-19 Perforation 2703.90 2705.40 3
1961-01-20 Acid Treatment 2696.90 2705.40 0
1961-10-04 Resin-Gypsum Squeeze or Plug 2702.40 2706.00 0
1961-12-21 Cement Squeeze 2696.90 2706.00 0
1961-12-29 Perforation 2714.90 2723.10 3
1961-12-29 Perforation 2725.20 2729.20 3
1961-12-29 Perforation 2729.80 2731.90 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-12-02 Lost Circulation 30.40 182.80

For data sources see[6]

References