X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645110212000

Well Details

Well ID: 0645110212000
Loading map...
Location: 00/12-02-064-11W5/0
Location Alias: 00/12-02-64-11 W5M
Location Alias 2: 00/12-02-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 02
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 12-2-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0019480
License Date: 1960-08-04
License Status: Suspension
Spud Date: 1960-08-21
Final Drill Date: 1960-09-14
Well Total Depth: 2749.30 m
Surface Hole Latitude: 54.510544
Surface Hole Longitude: -115.560003

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-08-04 Obtained License
1960-08-21 Lost Circulation Occurred
1960-09-14 Finished Drilling
1960-09-14 Well Mode changed to Drilled and Cased
1960-09-16 Production Casing Operation Performed
1960-09-26 Perforation Treatment Performed - Jet Perforation
1960-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-09 Well Began Production
1960-10-09 Well Fluid changed to Crude Oil
1960-10-09 Well Mode changed to Flowing
1968-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-04-22 Perforation Treatment Performed - Jet Perforation
1968-05-01 Well Began Injection
1968-05-01 Well Fluid changed to Water
1968-05-01 Well Type changed to Injection
1968-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-07-10 Perforation Treatment Performed - Jet Perforation
1976-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-07-11 Perforation Treatment Performed - Jet Perforation
1976-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-08-20 Well Fluid changed to Crude Oil
1976-08-20 Well Mode changed to Flowing
1976-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-03-01 Well Fluid changed to Crude Oil
1977-03-01 Well Mode changed to Pumping
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Suspended
1987-07-28 Well Log Performed
1997-03-18 Well Log Performed
1997-04-24 Well Fluid changed to Water
1997-04-24 Well Type changed to Injection
1997-06-21 Well Log Performed
2000-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-04-01 Perforation Treatment Performed - Cement Plug
2000-04-01 Well Log Performed
2000-04-02 Well Log Performed
2000-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-26 Well Fluid changed to Solvent
2001-01-26 Well Type changed to Injection
2001-07-17 Well Log Performed
2002-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-06-17 Well Fluid changed to Water
2004-06-17 Well Type changed to Injection
2011-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-09-26 Perforation 2685.90 2691.10 3
1976-07-11 Acid Treatment 2704.80 2724.90 0
1976-07-11 Perforation 2679.20 2695.70 3
1976-07-12 Acid Treatment 2679.20 2695.70 0
1976-11-16 Packing Device Capped w/Cement 2714.20 2715.80 0
2000-03-27 Acid Treatment 2679.20 2706.00 0
2000-04-01 Cement Plug 2708.20 2712.40 0
2000-11-01 Acid Treatment 2679.20 2706.00 0
2002-01-12 Acid Treatment 2679.20 2695.60 0
2002-01-12 Acid Treatment 2704.80 2706.00 0
2003-02-11 Acid Treatment 2679.20 2706.00 0
1960-09-27 Acid Treatment 2685.90 2691.10 0
2004-04-30 Acid Treatment 2679.20 2706.00 0
2011-04-28 Acid Treatment 2679.20 2706.00 0
2014-07-03 Acid Treatment 2679.20 2706.00 0
1968-04-22 Perforation 2731.60 2736.50 7
1968-04-22 Acid Treatment 2731.60 2736.50 0
1968-08-12 Acid Treatment 2731.60 2736.50 0
1976-07-07 Packing Device Capped w/Cement 2727.40 2731.30 0
1976-07-10 Perforation 2723.70 2724.90 7
1976-07-10 Perforation 2717.90 2719.40 7
1976-07-10 Perforation 2704.80 2706.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 438 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 1760 0.0 0.0 0.0
1977 1073 0.0 0.0 0.0
1980 125 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-08-21 Lost Circulation 0.10 188.90
2014-07-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References