X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645101501000

Well Details

Well ID: 0645101501000
Loading map...
Location: 00/01-15-064-10W5/0
Location Alias: 00/01-15-64-10 W5M
Location Alias 2: 00/01-15-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 15
County/Municipality: Big Lakes County
Well Name: CPEC HZ JUDYCK 1-15-64-10
Operator Name: Crescent Point Energy Corp.
License Number: 0492827
License Date: 2018-12-18
License Status: Issued
Spud Date: 2019-10-23
Final Drill Date: 2019-11-01
Well Total Depth: 5043.00 m
Surface Hole Latitude: 54.531989
Surface Hole Longitude: -115.454861

For data sources see[1][2]

Well History

Date Event
2018-12-18 Obtained License
2019-10-23 Drill To LD
2019-10-24 Surface Casing Operation Performed
2019-10-27 Direction Drilling Operation Performed - Deviate
2019-10-28 Direction Drilling Operation Performed - Horizontal
2019-10-28 Well Log Performed
2019-10-29 Intermediate Casing Operation Performed
2019-11-01 Finished Drilling
2019-11-01 Well Log Performed
2019-11-01 Well Mode changed to Drilled and Cased
2019-11-03 Production Casing Operation Performed
2019-11-04 Rig Released
2019-12-06 Well Log Performed
2020-02-28 Perforation Treatment Performed - Jet Perforation
2020-02-29 Perforation Treatment Performed - Jet Perforation
2020-03-01 Perforation Treatment Performed - Jet Perforation
2020-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2020-03-09 Perforation Treatment Performed - Open-Hole Completion
2020-03-22 Well Began Production
2020-03-22 Well Fluid changed to Crude Oil
2020-03-22 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-10-23 Horizon Drilling Inc. 19 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-10-27 2274.70 Deviate (5 - 79 degrees)
2019-10-28 2665.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-28 Perforation 4991.30 4991.50 6
2020-02-29 Perforation 4258.00 4258.20 6
2020-02-29 Perforation 4174.50 4174.70 6
2020-02-29 Perforation 4092.20 4092.40 6
2020-03-01 Perforation 4009.50 4009.70 6
2020-03-01 Perforation 3927.50 3927.70 6
2020-03-01 Perforation 3845.30 3845.50 6
2020-03-01 Perforation 3762.90 3763.10 6
2020-03-01 Perforation 3680.10 3680.30 6
2020-03-01 Perforation 3599.50 3599.70 6
2020-03-01 Perforation 3519.90 3520.10 6
2020-02-28 Perforation 4912.00 4912.20 6
2020-03-01 Perforation 3438.50 3438.70 6
2020-03-01 Perforation 3359.50 3359.70 6
2020-03-01 Perforation 3281.80 3282.00 6
2020-03-01 Perforation 3200.50 3200.70 6
2020-03-01 Perforation 3119.00 3119.20 6
2020-03-09 Open Hole/Barefoot Completion 5038.00 5043.00 0
2020-03-09 Multi-Stage Fracture 4991.30 4991.50 0
2020-03-09 Multi-Stage Fracture 4912.00 4912.20 0
2020-03-09 Multi-Stage Fracture 4828.90 4829.10 0
2020-03-09 Multi-Stage Fracture 4745.40 4745.60 0
2020-02-28 Perforation 4828.90 4829.10 6
2020-03-09 Multi-Stage Fracture 4664.80 4665.00 0
2020-03-09 Multi-Stage Fracture 4583.60 4583.80 0
2020-03-09 Multi-Stage Fracture 4502.40 4502.60 0
2020-03-09 Multi-Stage Fracture 4422.50 4422.70 0
2020-03-09 Multi-Stage Fracture 4339.40 4339.60 0
2020-03-09 Multi-Stage Fracture 4258.00 4258.20 0
2020-03-09 Multi-Stage Fracture 4174.50 4174.70 0
2020-03-09 Multi-Stage Fracture 4092.20 4092.40 0
2020-03-09 Multi-Stage Fracture 4009.50 4009.70 0
2020-03-09 Multi-Stage Fracture 3927.50 3927.70 0
2020-02-28 Perforation 4745.40 4745.60 6
2020-03-09 Multi-Stage Fracture 3845.30 3845.50 0
2020-03-09 Multi-Stage Fracture 3762.90 3763.10 0
2020-03-09 Multi-Stage Fracture 3680.10 3680.30 0
2020-03-09 Multi-Stage Fracture 3599.50 3599.70 0
2020-03-09 Multi-Stage Fracture 3519.90 3520.10 0
2020-03-09 Multi-Stage Fracture 3438.50 3438.70 0
2020-03-09 Multi-Stage Fracture 3359.50 3359.70 0
2020-03-09 Multi-Stage Fracture 3281.80 3282.00 0
2020-03-09 Multi-Stage Fracture 3200.50 3200.70 0
2020-03-09 Multi-Stage Fracture 3119.00 3119.20 0
2020-02-28 Perforation 4664.80 4665.00 6
2020-02-28 Perforation 4583.60 4583.80 6
2020-02-29 Perforation 4502.40 4502.60 6
2020-02-29 Perforation 4422.50 4422.70 6
2020-02-29 Perforation 4339.40 4339.60 6

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 228 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-04 No Incident Encountered 0.00 0.00
2019-11-09 No Incident Encountered 0.00 0.00
2019-11-18 No Incident Encountered 0.00 0.00
2020-03-15 No Incident Encountered 0.00 0.00

For data sources see[8]

References