Well Details

Well ID: 0645100702000
Loading map...
Location: 00/02-07-064-10W5/0
Location Alias: 00/02-07-64-10 W5M
Location Alias 2: 00/02-07-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 07
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 2-7-64-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0021137
License Date: 1961-08-01
License Status: Amended
Spud Date: 1961-08-06
Final Drill Date: 1961-08-29
Well Total Depth: 2638.70 m
Surface Hole Latitude: 54.517746
Surface Hole Longitude: -115.497767

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-08-01 Obtained License
1961-08-29 Finished Drilling
1961-08-29 Well Mode changed to Drilled and Cased
1961-08-31 Production Casing Operation Performed
1961-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-16 Perforation Treatment Performed - Bullet Perforation
1961-09-17 Well Began Production
1961-09-17 Well Fluid changed to Crude Oil
1961-09-17 Well Mode changed to Flowing
1972-05-24 Perforation Treatment Performed - Jet Perforation
1972-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-03 Well Fluid changed to Crude Oil
1974-12-03 Well Mode changed to Gas Lift
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Suspended
1983-04-01 Well Fluid changed to Crude Oil
1983-04-01 Well Mode changed to Flowing
1987-02-07 Perforation Treatment Performed - Jet Perforation
1987-02-07 Well Log Performed
1987-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-10 Well Log Performed
1987-02-11 Well Fluid changed to Crude Oil
1987-02-11 Well Mode changed to Gas Lift
1993-02-04 Well Fluid changed to Crude Oil
1993-02-04 Well Mode changed to Suspended
1993-05-03 Perforation Treatment Performed - Jet Perforation
1993-05-03 Well Log Performed
1993-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-05 Well Log Performed
1993-05-07 Well Log Performed
1993-05-19 Well Began Injection
1993-05-19 Well Fluid changed to Water
1993-05-19 Well Type changed to Injection
1993-09-29 Well Fluid changed to Solvent
1993-09-29 Well Type changed to Injection
1993-11-16 Well Log Performed
1996-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-21 Perforation Treatment Performed - Bridge Plug No Cement Required
1998-08-21 Plug Back Performed
1998-08-21 Well Fluid changed to Solvent
1998-08-21 Well Mode changed to Abandoned and Whipstocked
1998-08-21 Well Type changed to Injection
1998-08-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-16 Bullet Perforation 2590.80 2591.70 3
1972-05-24 Perforation 2580.40 2583.50 3
1972-05-25 Acid Treatment 2563.40 2583.50 0
1987-02-07 Perforation 2558.50 2559.10 7
1987-02-07 Perforation 2560.90 2562.20 7
1987-02-07 Perforation 2576.20 2576.80 7
1987-02-07 Perforation 2578.60 2580.40 7
1987-02-07 Perforation 2583.50 2586.50 7
1987-02-07 Perforation 2589.60 2592.00 7
1987-02-09 Acid Treatment 2558.50 2598.70 0
1993-05-03 Perforation 2591.30 2596.80 13
1961-09-16 Bullet Perforation 2593.80 2595.70 3
1993-05-05 Acid Treatment 2560.10 2596.60 0
1996-05-28 Acid Treatment 2589.60 2598.70 0
1996-10-04 Acid Treatment 2589.60 2598.70 0
1998-08-21 Bridge Plug, No Cement 2547.00 2547.00 0
1961-09-16 Bullet Perforation 2596.30 2598.70 3
1961-09-16 Acid Treatment 2590.80 2598.70 0
1972-05-24 Perforation 2563.40 2570.10 3
1972-05-24 Perforation 2571.30 2572.50 3
1972-05-24 Perforation 2573.40 2574.00 3
1972-05-24 Perforation 2575.60 2576.20 3
1972-05-24 Perforation 2577.40 2578.60 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7772 0.0 0.0 0.0
1968 7687 0.0 0.0 0.0
1969 2545 0.0 0.0 0.0
1970 5125 0.0 0.0 0.0
1971 3144 0.0 0.0 0.0
1972 3613 0.0 0.0 0.0
1973 7959 0.0 0.0 0.0
1974 4351 0.0 0.0 0.0
1975 3913 0.0 0.0 0.0
1976 712 0.0 0.0 0.0
1980 83 0.0 0.0 0.0
1983 5721 0.0 0.0 0.0
1984 8397 0.0 0.0 0.0
1985 8346 0.0 0.0 0.0
1986 7496 0.0 0.0 0.0
1987 5706 0.0 0.0 0.0
1988 7380 0.0 0.0 0.0
1989 7233 0.0 0.0 0.0
1990 8592 0.0 0.0 0.0
1991 8388 0.0 0.0 0.0
1992 4185 0.0 0.0 0.0
1993 804 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References