If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0645100615002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.510424,"lon":-115.496596,"icon":""}]} |
Location: 00/15-06-064-10W5/2 | |
Location Alias: 00/15-06-64-10 W5M | |
Location Alias 2: 00/15-06-064-10 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 5 | |
Range: 10 | |
Section: 06 | |
County/Municipality: Big Lakes County | |
Well Name: ACCEL JUDYCK 10-6-64-10 | |
Operator Name: ACCEL Energy Canada Limited | |
License Number: 0049079 | |
License Date: 1974-02-20 | |
License Status: Amended | |
Spud Date: 1974-03-11 | |
Final Drill Date: 1998-09-29 | |
Well Total Depth: 3135.00 m | |
Surface Hole Latitude: 54.510424 | |
Surface Hole Longitude: -115.496596 |
Date | Event |
---|---|
1974-02-20 | Obtained License |
1998-09-16 | Direction Drilling Operation Performed - Horizontal |
1998-09-24 | Liner Casing Operation Performed |
1998-09-26 | Perforation Treatment Performed - Open-Hole Completion |
1998-09-29 | Finished Drilling |
1998-09-29 | Well Log Performed |
1998-09-29 | Well Mode changed to Drilled and Cased |
1998-09-30 | Rig Released |
1998-10-01 | Well Began Injection |
1998-10-01 | Well Fluid changed to Solvent |
1998-10-01 | Well Type changed to Injection |
1998-10-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-10-20 | Well Log Performed |
1998-10-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-01-10 | Well Log Performed |
2006-11-24 | Well Log Performed |
2006-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-03-01 | Well Fluid changed to Solvent |
2007-03-01 | Well Mode changed to Suspended |
2007-03-01 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1998-09-16 | 2479.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-09-26 | Open Hole/Barefoot Completion | 2760.00 | 3135.00 | 0 |
1998-10-20 | Acid Treatment | 2760.00 | 3135.00 | 0 |
1998-10-23 | Acid Treatment | 2760.00 | 3135.00 | 0 |
2006-11-29 | Packing Device Capped w/Cement | 2455.00 | 2548.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]