X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645100608000

Well Details

Well ID: 0645100608000
Loading map...
Location: 00/08-06-064-10W5/0
Location Alias: 00/08-06-64-10 W5M
Location Alias 2: 00/08-06-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 06
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 8-6-64-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0050108
License Date: 1974-06-13
License Status: Issued
Spud Date: 1974-06-29
Final Drill Date: 1974-07-17
Well Total Depth: 2624.30 m
Surface Hole Latitude: 54.506907
Surface Hole Longitude: -115.492928

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-13 Obtained License
1974-07-17 Finished Drilling
1974-07-17 Well Mode changed to Drilled and Cased
1974-07-20 Production Casing Operation Performed
1974-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-31 Perforation Treatment Performed - Jet Perforation
1974-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-18 Well Began Production
1974-09-18 Well Fluid changed to Crude Oil
1974-09-18 Well Mode changed to Flowing
1974-10-11 Well Fluid changed to Crude Oil
1974-10-11 Well Mode changed to Gas Lift
1981-12-31 Well Fluid changed to Crude Oil
1981-12-31 Well Mode changed to Suspended
1987-03-22 Well Fluid changed to Crude Oil
1987-03-22 Well Mode changed to Gas Lift
1987-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-23 Perforation Treatment Performed - Cement Squeeze
1995-09-27 Perforation Treatment Performed - Jet Perforation
1995-10-01 Perforation Treatment Performed - Cement Squeeze
1995-10-03 Perforation Treatment Performed - Cement Plug
1995-10-04 Perforation Treatment Performed - Jet Perforation
1995-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-06 Perforation Treatment Performed - Jet Perforation
1995-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-09 Well Log Performed
2007-05-10 Perforation Treatment Performed - Jet Perforation
2007-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-25 Well Log Performed
2011-10-01 Well Fluid changed to Crude Oil
2011-10-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-08-31 Perforation 2540.80 2547.50 3
1974-08-31 Perforation 2579.50 2580.40 3
1974-08-31 Perforation 2581.70 2582.60 3
1974-08-31 Acid Treatment 2553.00 2582.60 0
1974-08-31 Acid Treatment 2573.10 2588.40 0
1974-09-01 Acid Treatment 2540.80 2547.50 0
1987-04-05 Acid Treatment 2540.80 2588.40 0
1995-09-23 Cement Squeeze 2540.80 2547.50 0
1995-09-27 Perforation 2564.00 2564.30 12
1995-10-01 Cement Squeeze 2553.00 2582.60 0
1995-10-03 Cement Plug 2578.50 2582.60 0
1974-08-31 Perforation 2553.00 2554.20 3
1995-10-04 Perforation 2563.40 2563.70 12
1995-10-05 Acid Treatment 2563.40 2563.70 0
1995-10-06 Perforation 2553.00 2554.20 7
1995-10-06 Perforation 2555.10 2556.70 7
1995-10-06 Perforation 2557.60 2558.80 7
1995-10-06 Perforation 2559.70 2560.60 7
1995-10-06 Perforation 2568.80 2569.70 7
1995-10-06 Perforation 2570.70 2571.60 7
1995-10-06 Perforation 2574.60 2576.10 7
1995-10-07 Acid Treatment 2553.00 2576.10 0
1974-08-31 Perforation 2554.80 2556.70 3
2007-05-10 Perforation 2540.90 2546.30 7
2007-05-10 Perforation 2579.80 2580.40 7
2007-05-10 Perforation 2581.70 2582.90 7
2007-05-10 Perforation 2585.30 2589.00 7
2007-05-11 Acid Treatment 2540.80 2546.30 0
2007-05-11 Acid Treatment 2579.80 2580.40 0
2007-05-11 Acid Treatment 2581.70 2582.90 0
2007-05-11 Acid Treatment 2585.30 2589.00 0
2011-08-25 Packing Device Capped w/Cement 2572.50 2573.50 0
1974-08-31 Perforation 2557.30 2558.80 3
1974-08-31 Perforation 2559.40 2560.60 3
1974-08-31 Perforation 2568.90 2569.50 3
1974-08-31 Perforation 2571.00 2571.60 3
1974-08-31 Perforation 2574.60 2576.20 3
1974-08-31 Perforation 2577.10 2578.30 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 414 0.0 0.0 0.0
1975 5046 0.0 0.0 0.0
1976 3339 0.0 0.0 0.0
1977 2765 0.0 0.0 0.0
1978 4415 0.0 0.0 0.0
1979 8194 0.0 0.0 0.0
1980 7131 0.0 0.0 0.0
1981 1729 0.0 0.0 0.0
1987 6458 0.0 0.0 0.0
1988 7264 0.0 0.0 0.0
1989 8507 0.0 0.0 0.0
1990 8249 0.0 0.0 0.0
1991 8392 0.0 0.0 0.0
1992 5645 0.0 0.0 0.0
1993 4386 0.0 0.0 0.0
1994 7272 0.0 0.0 0.0
1995 7785 0.0 0.0 0.0
1996 8251 0.0 0.0 0.0
1997 4663 0.0 0.0 0.0
1998 8116 0.0 0.0 0.0
1999 8554 0.0 0.0 0.0
2000 8529 0.0 0.0 0.0
2001 8592 0.0 0.0 0.0
2002 8708 0.0 0.0 0.0
2003 8690 0.0 0.0 0.0
2004 8285 0.0 0.0 0.0
2005 8670 0.0 0.0 0.0
2006 8371 0.0 0.0 0.0
2007 8113 0.0 0.0 0.0
2008 7961 0.0 0.0 0.0
2009 8627 0.0 0.0 0.0
2010 8593 0.0 0.0 0.0
2011 8106 0.0 0.0 0.0
2012 8727 0.0 0.0 0.0
2013 8457 0.0 0.0 0.0
2014 8610 0.0 0.0 0.0
2015 8105 0.0 0.0 0.0
2016 8593 0.0 0.0 0.0
2017 8625 0.0 0.0 0.0
2018 5303 0.0 0.0 0.0

For data sources see[5]

References