If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0645100603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.503033,"lon":-115.502999,"icon":""}]} |
Location: 00/03-06-064-10W5/0 | |
Location Alias: 00/03-06-64-10 W5M | |
Location Alias 2: 00/03-06-064-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 5 | |
Range: 10 | |
Section: 06 | |
County/Municipality: Big Lakes County | |
Well Name: ACCEL JUDYCK 3-6-64-10 | |
Operator Name: ACCEL Energy Canada Limited | |
License Number: 0074265 | |
License Date: 1979-02-01 | |
License Status: Suspension | |
Spud Date: 1979-10-26 | |
Final Drill Date: 1979-11-13 | |
Well Total Depth: 2628.00 m | |
Surface Hole Latitude: 54.503033 | |
Surface Hole Longitude: -115.502999 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-02-01 | Obtained License |
1979-11-13 | Finished Drilling |
1979-11-13 | Well Mode changed to Drilled and Cased |
1979-11-15 | Production Casing Operation Performed |
1980-03-06 | Perforation Treatment Performed - Jet Perforation |
1980-03-09 | Perforation Treatment Performed - Fractured |
1980-05-23 | Well Began Production |
1980-05-23 | Well Fluid changed to Crude Oil |
1980-05-23 | Well Mode changed to Flowing |
1980-09-03 | Perforation Treatment Performed - Cement Plug |
1980-09-08 | Perforation Treatment Performed - Open-Hole Completion |
1980-09-14 | Perforation Treatment Performed - Jet Perforation |
1980-09-17 | Perforation Treatment Performed - Acid Wash - No Pressure |
1986-10-01 | Well Fluid changed to Crude Oil |
1986-10-01 | Well Mode changed to Suspended |
1987-03-04 | Well Fluid changed to Crude Oil |
1987-03-04 | Well Mode changed to Pumping |
1987-12-01 | Well Fluid changed to Crude Oil |
1987-12-01 | Well Mode changed to Suspended |
1988-06-21 | Well Log Performed |
1988-06-29 | Perforation Treatment Performed - Cement Plug |
1988-06-29 | Perforation Treatment Performed - Open-Hole Completion |
1988-07-13 | Perforation Treatment Performed - Jet Perforation |
1988-07-13 | Well Log Performed |
1988-07-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-07-27 | Well Fluid changed to Crude Oil |
1988-07-27 | Well Mode changed to Gas Lift |
1993-08-11 | Well Fluid changed to Crude Oil |
1993-08-11 | Well Mode changed to Suspended |
1993-10-22 | Well Log Performed |
1993-12-22 | Well Fluid changed to Crude Oil |
1993-12-22 | Well Mode changed to Gas Lift |
1993-12-26 | Well Fluid changed to Crude Oil |
1993-12-26 | Well Mode changed to Suspended |
1996-07-25 | Perforation Treatment Performed - Cement Plug |
1996-07-25 | Perforation Treatment Performed - Cement Squeeze |
1996-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-06 | Perforation Treatment Performed - Jet Perforation |
1996-08-06 | Well Log Performed |
1996-08-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-08-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-08-15 | Plug Back Performed |
1996-08-15 | Well Fluid changed to Crude Oil |
1996-08-15 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-03-06 | Perforation | 2544.00 | 2546.00 | 6 |
1980-03-06 | Perforation | 2567.00 | 2568.00 | 6 |
1980-03-06 | Perforation | 2569.50 | 2573.00 | 6 |
1980-03-09 | Fracture | 2544.00 | 2573.00 | 0 |
1980-09-03 | Cement Plug | 2515.40 | 2573.00 | 0 |
1980-09-08 | Open Hole/Barefoot Completion | 2588.70 | 2628.00 | 0 |
1980-09-14 | Perforation | 2544.00 | 2546.00 | 6 |
1980-09-14 | Perforation | 2547.20 | 2548.20 | 6 |
1980-09-14 | Perforation | 2549.20 | 2550.50 | 6 |
1980-09-14 | Perforation | 2553.00 | 2553.20 | 6 |
1980-09-14 | Perforation | 2554.50 | 2556.00 | 6 |
1980-03-06 | Perforation | 2547.30 | 2548.30 | 6 |
1980-09-14 | Perforation | 2557.20 | 2558.00 | 6 |
1980-09-14 | Perforation | 2560.20 | 2561.20 | 6 |
1980-09-14 | Perforation | 2562.00 | 2563.20 | 6 |
1980-09-14 | Perforation | 2565.50 | 2566.20 | 6 |
1980-09-14 | Perforation | 2567.00 | 2568.00 | 6 |
1980-09-14 | Perforation | 2569.50 | 2573.00 | 6 |
1980-09-17 | Acid Wash | 2544.00 | 2573.00 | 0 |
1988-06-29 | Cement Plug | 2602.00 | 2619.00 | 0 |
1988-06-29 | Open Hole/Barefoot Completion | 2588.70 | 2602.00 | 0 |
1988-07-13 | Perforation | 2544.00 | 2546.00 | 7 |
1980-03-06 | Perforation | 2549.30 | 2550.50 | 6 |
1988-07-13 | Perforation | 2547.20 | 2548.20 | 7 |
1988-07-13 | Perforation | 2549.20 | 2550.50 | 7 |
1988-07-13 | Perforation | 2553.00 | 2553.20 | 7 |
1988-07-13 | Perforation | 2554.50 | 2556.00 | 7 |
1988-07-13 | Perforation | 2557.20 | 2558.00 | 7 |
1988-07-13 | Perforation | 2560.20 | 2561.20 | 7 |
1988-07-13 | Perforation | 2562.00 | 2563.20 | 7 |
1988-07-13 | Perforation | 2565.50 | 2566.20 | 7 |
1988-07-13 | Perforation | 2567.00 | 2568.00 | 7 |
1988-07-13 | Perforation | 2569.50 | 2573.00 | 7 |
1980-03-06 | Perforation | 2553.00 | 2553.30 | 6 |
1988-07-13 | Perforation | 2575.00 | 2576.00 | 7 |
1988-07-13 | Perforation | 2578.00 | 2582.00 | 7 |
1988-07-15 | Acid Treatment | 2544.00 | 2576.00 | 0 |
1996-07-25 | Cement Squeeze | 2575.00 | 2585.00 | 0 |
1996-07-25 | Cement Plug | 2574.00 | 2602.00 | 0 |
1996-07-31 | Acid Treatment | 2544.00 | 2573.00 | 0 |
1996-08-02 | Acid Treatment | 2544.00 | 2573.00 | 0 |
1996-08-06 | Perforation | 2569.50 | 2573.00 | 13 |
1996-08-07 | Acid Treatment | 2569.50 | 2573.00 | 0 |
1996-08-15 | Packing Device Capped w/Cement | 2528.00 | 2538.00 | 0 |
1980-03-06 | Perforation | 2554.50 | 2556.00 | 6 |
1980-03-06 | Perforation | 2557.30 | 2558.00 | 6 |
1980-03-06 | Perforation | 2560.30 | 2561.30 | 6 |
1980-03-06 | Perforation | 2562.00 | 2563.30 | 6 |
1980-03-06 | Perforation | 2565.50 | 2566.20 | 6 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 4014 | 0.0 | 0.0 | 0.0 |
1981 | 6242 | 0.0 | 0.0 | 0.0 |
1982 | 7503 | 0.0 | 0.0 | 0.0 |
1983 | 3356 | 0.0 | 0.0 | 0.0 |
1986 | 1809 | 0.0 | 0.0 | 0.0 |
1987 | 1245 | 0.0 | 0.0 | 0.0 |
1988 | 3466 | 0.0 | 0.0 | 0.0 |
1989 | 7079 | 0.0 | 0.0 | 0.0 |
1990 | 6779 | 0.0 | 0.0 | 0.0 |
1991 | 4138 | 0.0 | 0.0 | 0.0 |
1992 | 259 | 0.0 | 0.0 | 0.0 |
1993 | 195 | 0.0 | 0.0 | 0.0 |
For data sources see[5]