X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645100603000

Well Details

Well ID: 0645100603000
Loading map...
Location: 00/03-06-064-10W5/0
Location Alias: 00/03-06-64-10 W5M
Location Alias 2: 00/03-06-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 06
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 3-6-64-10
Operator Name: ACCEL Energy Canada Limited
License Number: 0074265
License Date: 1979-02-01
License Status: Suspension
Spud Date: 1979-10-26
Final Drill Date: 1979-11-13
Well Total Depth: 2628.00 m
Surface Hole Latitude: 54.503033
Surface Hole Longitude: -115.502999

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-01 Obtained License
1979-11-13 Finished Drilling
1979-11-13 Well Mode changed to Drilled and Cased
1979-11-15 Production Casing Operation Performed
1980-03-06 Perforation Treatment Performed - Jet Perforation
1980-03-09 Perforation Treatment Performed - Fractured
1980-05-23 Well Began Production
1980-05-23 Well Fluid changed to Crude Oil
1980-05-23 Well Mode changed to Flowing
1980-09-03 Perforation Treatment Performed - Cement Plug
1980-09-08 Perforation Treatment Performed - Open-Hole Completion
1980-09-14 Perforation Treatment Performed - Jet Perforation
1980-09-17 Perforation Treatment Performed - Acid Wash - No Pressure
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Suspended
1987-03-04 Well Fluid changed to Crude Oil
1987-03-04 Well Mode changed to Pumping
1987-12-01 Well Fluid changed to Crude Oil
1987-12-01 Well Mode changed to Suspended
1988-06-21 Well Log Performed
1988-06-29 Perforation Treatment Performed - Cement Plug
1988-06-29 Perforation Treatment Performed - Open-Hole Completion
1988-07-13 Perforation Treatment Performed - Jet Perforation
1988-07-13 Well Log Performed
1988-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-27 Well Fluid changed to Crude Oil
1988-07-27 Well Mode changed to Gas Lift
1993-08-11 Well Fluid changed to Crude Oil
1993-08-11 Well Mode changed to Suspended
1993-10-22 Well Log Performed
1993-12-22 Well Fluid changed to Crude Oil
1993-12-22 Well Mode changed to Gas Lift
1993-12-26 Well Fluid changed to Crude Oil
1993-12-26 Well Mode changed to Suspended
1996-07-25 Perforation Treatment Performed - Cement Plug
1996-07-25 Perforation Treatment Performed - Cement Squeeze
1996-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-06 Perforation Treatment Performed - Jet Perforation
1996-08-06 Well Log Performed
1996-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-15 Plug Back Performed
1996-08-15 Well Fluid changed to Crude Oil
1996-08-15 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-06 Perforation 2544.00 2546.00 6
1980-03-06 Perforation 2567.00 2568.00 6
1980-03-06 Perforation 2569.50 2573.00 6
1980-03-09 Fracture 2544.00 2573.00 0
1980-09-03 Cement Plug 2515.40 2573.00 0
1980-09-08 Open Hole/Barefoot Completion 2588.70 2628.00 0
1980-09-14 Perforation 2544.00 2546.00 6
1980-09-14 Perforation 2547.20 2548.20 6
1980-09-14 Perforation 2549.20 2550.50 6
1980-09-14 Perforation 2553.00 2553.20 6
1980-09-14 Perforation 2554.50 2556.00 6
1980-03-06 Perforation 2547.30 2548.30 6
1980-09-14 Perforation 2557.20 2558.00 6
1980-09-14 Perforation 2560.20 2561.20 6
1980-09-14 Perforation 2562.00 2563.20 6
1980-09-14 Perforation 2565.50 2566.20 6
1980-09-14 Perforation 2567.00 2568.00 6
1980-09-14 Perforation 2569.50 2573.00 6
1980-09-17 Acid Wash 2544.00 2573.00 0
1988-06-29 Cement Plug 2602.00 2619.00 0
1988-06-29 Open Hole/Barefoot Completion 2588.70 2602.00 0
1988-07-13 Perforation 2544.00 2546.00 7
1980-03-06 Perforation 2549.30 2550.50 6
1988-07-13 Perforation 2547.20 2548.20 7
1988-07-13 Perforation 2549.20 2550.50 7
1988-07-13 Perforation 2553.00 2553.20 7
1988-07-13 Perforation 2554.50 2556.00 7
1988-07-13 Perforation 2557.20 2558.00 7
1988-07-13 Perforation 2560.20 2561.20 7
1988-07-13 Perforation 2562.00 2563.20 7
1988-07-13 Perforation 2565.50 2566.20 7
1988-07-13 Perforation 2567.00 2568.00 7
1988-07-13 Perforation 2569.50 2573.00 7
1980-03-06 Perforation 2553.00 2553.30 6
1988-07-13 Perforation 2575.00 2576.00 7
1988-07-13 Perforation 2578.00 2582.00 7
1988-07-15 Acid Treatment 2544.00 2576.00 0
1996-07-25 Cement Squeeze 2575.00 2585.00 0
1996-07-25 Cement Plug 2574.00 2602.00 0
1996-07-31 Acid Treatment 2544.00 2573.00 0
1996-08-02 Acid Treatment 2544.00 2573.00 0
1996-08-06 Perforation 2569.50 2573.00 13
1996-08-07 Acid Treatment 2569.50 2573.00 0
1996-08-15 Packing Device Capped w/Cement 2528.00 2538.00 0
1980-03-06 Perforation 2554.50 2556.00 6
1980-03-06 Perforation 2557.30 2558.00 6
1980-03-06 Perforation 2560.30 2561.30 6
1980-03-06 Perforation 2562.00 2563.30 6
1980-03-06 Perforation 2565.50 2566.20 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 4014 0.0 0.0 0.0
1981 6242 0.0 0.0 0.0
1982 7503 0.0 0.0 0.0
1983 3356 0.0 0.0 0.0
1986 1809 0.0 0.0 0.0
1987 1245 0.0 0.0 0.0
1988 3466 0.0 0.0 0.0
1989 7079 0.0 0.0 0.0
1990 6779 0.0 0.0 0.0
1991 4138 0.0 0.0 0.0
1992 259 0.0 0.0 0.0
1993 195 0.0 0.0 0.0

For data sources see[5]

References