X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644033010000

Well Details

Well ID: 0644033010000
Loading map...
Location: 00/10-30-064-03W4/0
Location Alias: 00/10-30-64-03 W4M
Location Alias 2: 00/10-30-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 30
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP 01 T10-06 COLDLK 10-30-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0248817
License Date: 2001-01-11
License Status: Suspension
Spud Date: 2002-02-06
Final Drill Date: 2002-02-07
Well Total Depth: 759.00 m
Surface Hole Latitude: 54.571553
Surface Hole Longitude: -110.438580

For data sources see[1][2]

Well History

Date Event
2001-01-11 Obtained License
2002-02-06 Direction Drilling Operation Performed - Deviate
2002-02-07 Finished Drilling
2002-02-07 Well Log Performed
2002-02-08 Production Casing Operation Performed
2002-02-08 Rig Released
2002-02-08 Well Mode changed to Drilled and Cased
2002-04-03 Well Log Performed
2002-05-06 Perforation Treatment Performed - Jet Perforation
2002-11-01 Well Began Production
2002-11-01 Well Fluid changed to Crude Bitumen
2002-11-01 Well Type changed to Cyclical
2004-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-09 Perforation Treatment Performed - Jet Perforation
2004-02-09 Well Log Performed
2008-06-19 Well Log Performed
2010-05-09 Well Log Performed
2010-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-02-06 34.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-05-06 Perforation 742.00 746.00 13
2004-02-08 Packing Device Capped w/Cement 724.00 728.00 0
2004-02-09 Perforation 713.00 717.00 13
2010-05-12 Packing Device Capped w/Cement 624.50 626.60 0
2016-10-25 Packing Device Capped w/Cement 603.00 613.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 0 0.0 0.0 0.0
2003 5682 0.0 0.0 0.0
2004 4958 0.0 0.0 0.0
2005 8420 0.0 0.0 0.0
2006 6960 0.0 0.0 0.0
2007 5996 0.0 0.0 0.0
2008 7830 0.0 0.0 0.0
2009 3350 0.0 0.0 0.0
2010 2253 0.0 0.0 0.0
2014 1743 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References