X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032913050

Well Details

Well ID: 0644032913050
Loading map...
Location: 05/13-29-064-03W4/0
Location Alias: 05/13-29-64-03 W4M
Location Alias 2: 05/13-29-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 29
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP 01 T10-21 COLDLK 13-29-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0248832
License Date: 2001-01-11
License Status: Issued
Spud Date: 2002-03-02
Final Drill Date: 2002-03-03
Well Total Depth: 653.00 m
Surface Hole Latitude: 54.571611
Surface Hole Longitude: -110.436990

For data sources see[1][2]

Well History

Date Event
2001-01-11 Obtained License
2002-03-02 Direction Drilling Operation Performed - Deviate
2002-03-03 Finished Drilling
2002-03-03 Well Log Performed
2002-03-04 Rig Released
2002-03-04 Well Mode changed to Drilled and Cased
2002-04-03 Well Log Performed
2002-05-07 Perforation Treatment Performed - Jet Perforation
2002-05-07 Well Log Performed
2002-12-01 Well Began Production
2002-12-01 Well Fluid changed to Crude Bitumen
2002-12-01 Well Type changed to Cyclical
2007-04-19 Well Log Performed
2007-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-06-13 Perforation Treatment Performed - Cement Plug
2007-08-01 Well Fluid changed to Crude Bitumen
2007-08-01 Well Mode changed to Suspended
2007-08-01 Well Type changed to Cyclical
2009-12-02 Perforation Treatment Performed - Jet Perforation
2009-12-10 Well Fluid changed to Crude Bitumen
2009-12-10 Well Type changed to Cyclical
2011-09-07 Perforation Treatment Performed - Jet Perforation
2012-10-15 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2015-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-18 Production Casing Operation Performed
2019-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-05-03 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-03-02 34.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-05-07 Perforation 637.00 641.00 13
2007-04-23 Packing Device Capped w/Cement 549.70 554.20 0
2007-06-13 Cement Plug 522.00 589.00 0
2009-12-02 Perforation 637.00 641.00 13
2011-09-07 Perforation 637.00 641.00 13
2012-10-15 Packing Dev Cpd w/Res-Gyp Cem 505.00 515.20 0
2015-06-15 Packing Device Capped w/Cement 499.50 503.50 0
2019-03-20 Packing Device Capped w/Cement 438.00 625.00 0
2019-05-03 Perforation 637.00 641.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 0 0.0 0.0 0.0
2003 7572 0.0 0.0 0.0
2004 7593 0.0 0.0 0.0
2005 7425 0.0 0.0 0.0
2006 6546 0.0 0.0 0.0
2007 2522 0.0 0.0 0.0
2009 351 0.0 0.0 0.0
2010 1931 0.0 0.0 0.0
2011 2061 0.0 0.0 0.0
2014 180 0.0 0.0 0.0
2019 2194 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-16 No Incident Encountered 0.00 0.00
2015-06-17 No Incident Encountered 0.00 0.00
2019-03-20 No Incident Encountered 0.00 0.00
2019-05-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References