X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032806AC0

Well Details

Well ID: 0644032806AC0
Loading map...
Location: AC/06-28-064-03W4/0
Location Alias: AC/06-28-64-03 W4M
Location Alias 2: AC/06-28-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 28
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: ESSO 85 MAY E-11 COLDLK EX 6-28-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0116876
License Date: 1985-08-13
License Status: Abandoned
Spud Date: 1985-08-27
Final Drill Date: 1985-08-28
Well Total Depth: 587.00 m
Surface Hole Latitude: 54.566235
Surface Hole Longitude: -110.397544

For data sources see[1][2]

Well History

Date Event
1985-08-13 Obtained License
1985-08-27 Direction Drilling Operation Performed - Deviate
1985-08-28 Finished Drilling
1985-08-28 Well Log Performed
1985-08-29 Production Casing Operation Performed
1985-08-29 Rig Released
1985-09-14 Well Log Performed
1985-11-02 Well Log Performed
1985-11-05 Perforation Treatment Performed - Jet Perforation
1985-11-05 Well Mode changed to Drilled and Cased
1986-05-29 Well Began Production
1986-05-29 Well Fluid changed to Crude Bitumen
1986-05-29 Well Type changed to Cyclical
1988-03-18 Perforation Treatment Performed - Cement Plug
1988-03-18 Perforation Treatment Performed - Jet Perforation
1997-05-15 Perforation Treatment Performed - Cement Plug
1997-05-15 Plug Back Performed
1997-06-01 Well Fluid changed to Crude Bitumen
1997-06-01 Well Mode changed to Suspended
1997-06-01 Well Type changed to Cyclical
1998-09-14 Well Abandoned
1998-09-14 Well Fluid changed to Crude Bitumen
1998-09-14 Well Mode changed to Abandoned
1998-09-14 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-08-27 74.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-05 Perforation 561.00 567.00 7
1988-03-18 Cement Plug 556.40 587.00 0
1988-03-18 Perforation 533.00 537.00 13
1988-03-18 Perforation 542.00 546.00 13
1997-05-15 Cement Plug 334.00 527.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 3502 0.0 0.0 0.0
1987 5219 0.0 0.0 0.0
1988 6172 0.0 0.0 0.0
1989 5279 0.0 0.0 0.0
1990 5930 0.0 0.0 0.0
1991 6914 0.0 0.0 0.0
1992 5381 0.0 0.0 0.0
1993 8532 0.0 0.0 0.0
1994 8397 0.0 0.0 0.0
1995 4083 0.0 0.0 0.0
1996 8175 0.0 0.0 0.0
1997 2189 0.0 0.0 0.0

For data sources see[6]

References