X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032706AN0

Well Details

Well ID: 0644032706AN0
Loading map...
Location: AN/06-27-064-03W4/0
Location Alias: AN/06-27-64-03 W4M
Location Alias 2: AN/06-27-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 27
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP MAY 76-29 EX 6-27-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0058582
License Date: 1976-06-08
License Status: Abandoned
Spud Date: 1976-08-21
Final Drill Date: 1976-08-25
Well Total Depth: 496.80 m
Surface Hole Latitude: 54.563089
Surface Hole Longitude: -110.373019

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-08 Obtained License
1976-08-25 Finished Drilling
1976-08-25 Well Mode changed to Drilled and Cased
1976-08-26 Production Casing Operation Performed
1976-11-29 Perforation Treatment Performed - Jet Perforation
1977-03-21 Well Began Production
1977-03-21 Well Fluid changed to Crude Bitumen
1977-03-21 Well Type changed to Cyclical
1981-01-01 Well Fluid changed to Crude Bitumen
1981-01-01 Well Mode changed to Pumping
1988-07-13 Well Fluid changed to Crude Bitumen
1988-07-13 Well Mode changed to Suspended
1995-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-16 Plug Back Performed
1998-07-23 Well Abandoned
1998-07-23 Well Fluid changed to Crude Bitumen
1998-07-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-11-29 Perforation 450.50 453.50 7
1976-11-29 Perforation 456.00 465.10 7
1995-08-16 Packing Device Capped w/Cement 290.40 443.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4464 0.0 0.0 0.0
1978 5447 0.0 0.0 0.0
1979 4416 0.0 0.0 0.0
1980 6408 0.0 0.0 0.0
1981 8231 0.0 0.0 0.0
1982 8015 0.0 0.0 0.0
1983 8735 0.0 0.0 0.0
1984 4295 0.0 0.0 0.0
1985 2136 0.0 0.0 0.0
1986 7992 0.0 0.0 0.0
1987 8065 0.0 0.0 0.0
1988 4367 0.0 0.0 0.0

For data sources see[5]

References