X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032209AB2

Well Details

Well ID: 0644032209AB2
Loading map...
Location: AB/09-22-064-03W4/2
Location Alias: AB/09-22-64-03 W4M
Location Alias 2: AB/09-22-064-03 W4/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 22
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP ETHEL THX A9-22-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0030525
License Date: 1966-06-08
License Status: RecExempt
Spud Date: 1966-10-08
Final Drill Date: 1966-10-14
Well Total Depth: 486.80 m
Surface Hole Latitude: 54.552439
Surface Hole Longitude: -110.360466

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-06-08 Obtained License
1966-10-12 Production Casing Operation Performed
1966-10-14 Finished Drilling
1966-10-14 Perforation Treatment Performed - Open-Hole Completion
1966-10-14 Well Mode changed to Drilled and Cased
1966-10-15 Perforation Treatment Performed - Jet Perforation
1969-02-28 Perforation Treatment Performed - Cement Plug
1969-02-28 Perforation Treatment Performed - Jet Perforation
1969-03-01 Well Began Production
1969-03-01 Well Fluid changed to Crude Bitumen
1969-03-01 Well Type changed to Cyclical
1970-04-30 Well Fluid changed to Crude Bitumen
1970-04-30 Well Mode changed to Suspended
1970-04-30 Well Type changed to Cyclical
1971-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-06-14 Plug Back Performed
1971-06-14 Well Fluid changed to Crude Bitumen
1971-06-14 Well Mode changed to Abandoned
1971-06-14 Well Type changed to Cyclical
1971-07-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-14 Open Hole/Barefoot Completion 460.60 486.80 0
1966-10-15 Perforation 445.30 449.30 7
1966-10-15 Perforation 451.10 456.00 7
1966-10-15 Perforation 457.20 459.60 7
1969-02-28 Cement Plug 423.70 437.10 0
1969-02-28 Perforation 415.40 422.10 7
1971-06-14 Packing Device Capped w/Cement 391.30 399.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1008 0.0 0.0 0.0
1970 984 0.0 0.0 0.0

For data sources see[5]

References