X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0636072510000

Well Details

Well ID: 0636072510000
Loading map...
Location: 00/10-25-063-07W6/0
Location Alias: 00/10-25-63-07 W6M
Location Alias 2: 00/10-25-063-07 W6/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 6
Range: 07
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: UNION IMP CUTBANK 10-25-63-7
Operator Name: Chevron Canada Properties Limited
License Number: 0069990
License Date: 1978-06-07
License Status: Re-Entered
Spud Date: 1978-06-25
Final Drill Date: 1978-11-19
Well Total Depth: 3749.00 m
Surface Hole Latitude: 54.482159
Surface Hole Longitude: -118.917271

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-06-07 Obtained License
1978-07-22 Kick Occurred
1978-07-25 Drill Stem Test Performed
1978-07-26 Drill Stem Test Performed
1978-09-05 Drill Stem Test Performed
1978-11-19 Finished Drilling
1978-12-07 Production Casing Operation Performed
1979-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-31 Perforation Treatment Performed - Jet Perforation
1979-02-10 Perforation Treatment Performed - Jet Perforation
1979-02-12 Perforation Treatment Performed - Cement Squeeze
1979-02-12 Perforation Treatment Performed - Chemical Squeeze
1979-02-24 Perforation Treatment Performed - Jet Perforation
1979-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-04 Well Mode changed to Drilled and Cased
1982-10-05 Well Began Production
1982-10-05 Well Fluid changed to Gas
1982-10-05 Well Mode changed to Flowing
1986-10-31 Well Fluid changed to Gas
1986-10-31 Well Mode changed to Suspended
1987-09-24 Well Fluid changed to Gas
1987-09-24 Well Mode changed to Flowing
1989-08-31 Well Fluid changed to Gas
1989-08-31 Well Mode changed to Suspended
1995-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-26 Plug Back Performed
1995-06-26 Well Fluid changed to Gas
1995-06-26 Well Mode changed to Abandoned Zone
1995-07-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-31 Perforation 3208.00 3210.00 7
1995-06-26 Packing Device Capped w/Cement 1747.00 1755.00 0
1979-01-31 Acid Treatment 3208.00 3210.00 0
1979-02-10 Perforation 1773.00 1775.00 7
1979-02-10 Perforation 1773.00 1775.00 7
1979-02-12 Chemical Squeeze 1792.00 1794.00 0
1979-02-12 Cement Squeeze 1773.00 1794.00 0
1979-02-24 Perforation 1784.00 1786.00 7
1979-02-25 Acid Treatment 1784.00 1786.00 0
1995-06-26 Packing Device Capped w/Cement 3140.00 3148.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1820 0.0 0.0 0.0
1983 8157 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 7113 0.0 0.0 0.0
1986 1224 0.0 0.0 0.0
1987 2331 0.0 0.0 0.0
1988 1866 0.0 0.0 0.0
1989 171 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-07-22 Kick 1786.00 1786.00

For data sources see[6]

References