If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635260906003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.434168,"lon":-117.873678,"icon":""}]} |
Location: 00/06-09-063-26W5/3 | |
Location Alias: 00/06-09-63-26 W5M | |
Location Alias 2: 00/06-09-063-26 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 26 | |
Section: 09 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SUNCOR SIMONETTE 6-9-63-26 | |
Operator Name: Suncor Energy Inc. | |
License Number: 0161100 | |
License Date: 1993-09-22 | |
License Status: RecCertified | |
Spud Date: 1993-11-04 | |
Final Drill Date: 1993-12-15 | |
Well Total Depth: 3619.50 m | |
Surface Hole Latitude: 54.434168 | |
Surface Hole Longitude: -117.873678 |
Date | Event |
---|---|
1993-09-22 | Obtained License |
1993-12-15 | Finished Drilling |
1993-12-15 | Perforation Treatment Performed - Open-Hole Completion |
1993-12-15 | Well Log Performed |
1993-12-15 | Well Mode changed to Drilled and Cased |
1993-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-12-22 | Well Log Performed |
1994-01-19 | Rig Released |
1996-03-25 | Perforation Treatment Performed - Jet Perforation |
1996-03-26 | Perforation Treatment Performed - Jet Perforation |
1996-03-28 | Perforation Treatment Performed - Cement Squeeze |
1996-03-30 | Perforation Treatment Performed - Jet Perforation |
1996-04-02 | Perforation Treatment Performed - Jet Perforation |
1996-04-03 | Perforation Treatment Performed - Cement Squeeze |
1996-04-07 | Perforation Treatment Performed - Jet Perforation |
1996-04-23 | Well Began Production |
1996-04-23 | Well Fluid changed to Gas |
1996-04-23 | Well Mode changed to Flowing |
1997-03-27 | Well Log Performed |
1997-04-04 | Well Log Performed |
2000-10-16 | Well Fluid changed to Gas |
2000-10-16 | Well Mode changed to Suspended |
2002-06-30 | Perforation Treatment Performed - Cement Squeeze |
2002-07-24 | Perforation Treatment Performed - Cement Plug |
2002-07-24 | Plug Back Performed |
2002-07-25 | Perforation Treatment Performed - Cement Plug |
2002-07-26 | Perforation Treatment Performed - Cement Plug |
2002-07-26 | Perforation Treatment Performed - Jet Perforation |
2002-07-26 | Perforation Treatment Performed - Remedial Casing |
2002-07-26 | Plug Back Performed |
2002-07-29 | Well Abandoned |
2002-07-29 | Well Fluid changed to Gas |
2002-07-29 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-12-15 | Open Hole/Barefoot Completion | 3581.70 | 3619.50 | 0 |
1996-04-03 | Cement Squeeze | 2362.00 | 2363.00 | 0 |
1996-04-07 | Perforation | 2385.00 | 2389.90 | 20 |
2002-06-30 | Cement Squeeze | 2385.00 | 2389.90 | 0 |
2002-07-24 | Cement Plug | 2740.00 | 2849.40 | 0 |
2002-07-25 | Cement Plug | 450.00 | 2740.00 | 0 |
2002-07-26 | Perforation | 401.00 | 402.00 | 20 |
2002-07-26 | Remedial Casing Cementing | 401.00 | 402.00 | 0 |
2002-07-26 | Cement Plug | 355.00 | 395.00 | 0 |
1993-12-16 | Acid Treatment | 3581.70 | 3619.50 | 0 |
1996-03-25 | Perforation | 2459.90 | 2461.70 | 20 |
1996-03-26 | Perforation | 2385.00 | 2389.90 | 20 |
1996-03-28 | Cement Squeeze | 2459.90 | 2461.70 | 0 |
1996-03-28 | Cement Squeeze | 2385.00 | 2389.90 | 0 |
1996-03-30 | Perforation | 2385.00 | 2389.90 | 20 |
1996-04-02 | Perforation | 2362.00 | 2363.00 | 17 |
1996-04-03 | Cement Squeeze | 2385.00 | 2389.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 5634 | 0.0 | 0.0 | 0.0 |
1997 | 8487 | 0.0 | 0.0 | 0.0 |
1998 | 6167 | 0.0 | 0.0 | 0.0 |
1999 | 3348 | 0.0 | 0.0 | 0.0 |
For data sources see[5]