If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635260109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.42487,"lon":-117.786761,"icon":""}]} |
Location: 00/09-01-063-26W5/0 | |
Location Alias: 00/09-01-63-26 W5M | |
Location Alias 2: 00/09-01-063-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 063 | |
Meridian: 5 | |
Range: 26 | |
Section: 01 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: OEI SIMON 9-1-63-26 | |
Operator Name: Gain Energy Ltd. | |
License Number: 0118737 | |
License Date: 1985-10-30 | |
License Status: Suspension | |
Spud Date: 1985-11-19 | |
Final Drill Date: 1986-01-30 | |
Well Total Depth: 3823.00 m | |
Surface Hole Latitude: 54.424870 | |
Surface Hole Longitude: -117.786761 |
Date | Event |
---|---|
1985-10-30 | Obtained License |
1985-11-19 | Lost Circulation Occurred |
1985-11-23 | Surface Casing Operation Performed |
1985-11-30 | Direction Drilling Operation Performed - Deviate |
1986-01-02 | Lost Circulation Occurred |
1986-01-30 | Finished Drilling |
1986-01-30 | Well Mode changed to Drilled and Cased |
1986-01-31 | Well Log Performed |
1986-02-01 | Well Log Performed |
1986-02-05 | Production Casing Operation Performed |
1986-02-05 | Rig Released |
1986-02-15 | Well Log Performed |
1986-02-16 | Perforation Treatment Performed - Jet Perforation |
1986-02-16 | Well Log Performed |
1986-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-02-23 | Perforation Treatment Performed - Jet Perforation |
1986-02-24 | Perforation Treatment Performed - Jet Perforation |
1986-02-25 | Well Log Performed |
1986-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-28 | Perforation Treatment Performed - Jet Perforation |
1986-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-01 | Well Log Performed |
1986-03-03 | Well Began Production |
1986-03-03 | Well Fluid changed to Crude Oil |
1986-03-03 | Well Mode changed to Flowing |
1986-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-03-08 | Well Log Performed |
1986-07-17 | Well Log Performed |
1987-02-17 | Well Fluid changed to Crude Oil |
1987-02-17 | Well Mode changed to Gas Lift |
1987-03-03 | Well Log Performed |
1996-05-06 | Well Log Performed |
1996-12-16 | Perforation Treatment Performed - Jet Perforation |
1996-12-17 | Perforation Treatment Performed - Jet Perforation |
2014-08-01 | Well Fluid changed to Crude Oil |
2014-08-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1985-11-30 | 448.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-02-16 | Perforation | 3539.00 | 3542.00 | 7 |
1986-03-01 | Acid Treatment | 3492.00 | 3509.00 | 0 |
1986-03-08 | Packing Device Capped w/Cement | 3509.00 | 3510.00 | 0 |
1996-12-16 | Perforation | 3497.50 | 3501.50 | 13 |
1996-12-17 | Perforation | 3491.00 | 3495.00 | 13 |
1986-02-16 | Perforation | 3533.00 | 3539.00 | 7 |
1986-02-16 | Perforation | 3527.00 | 3533.00 | 7 |
1986-02-17 | Acid Treatment | 3527.00 | 3542.00 | 0 |
1986-02-22 | Packing Device Capped w/Cement | 3524.00 | 3525.00 | 0 |
1986-02-23 | Perforation | 3517.00 | 3523.00 | 0 |
1986-02-24 | Perforation | 3513.00 | 3517.00 | 7 |
1986-02-26 | Acid Treatment | 3513.00 | 3523.00 | 0 |
1986-02-28 | Perforation | 3492.00 | 3509.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 4695 | 0.0 | 0.0 | 0.0 |
1987 | 6914 | 0.0 | 0.0 | 0.0 |
1988 | 8778 | 0.0 | 0.0 | 0.0 |
1989 | 7673 | 0.0 | 0.0 | 0.0 |
1990 | 8212 | 0.0 | 0.0 | 0.0 |
1991 | 8728 | 0.0 | 0.0 | 0.0 |
1992 | 8085 | 0.0 | 0.0 | 0.0 |
1993 | 8198 | 0.0 | 0.0 | 0.0 |
1994 | 8380 | 0.0 | 0.0 | 0.0 |
1995 | 7952 | 0.0 | 0.0 | 0.0 |
1996 | 6444 | 0.0 | 0.0 | 0.0 |
1997 | 6206 | 0.0 | 0.0 | 0.0 |
1998 | 7215 | 0.0 | 0.0 | 0.0 |
1999 | 6834 | 0.0 | 0.0 | 0.0 |
2000 | 8627 | 0.0 | 0.0 | 0.0 |
2001 | 7296 | 0.0 | 0.0 | 0.0 |
2002 | 8479 | 0.0 | 0.0 | 0.0 |
2003 | 8681 | 0.0 | 0.0 | 0.0 |
2004 | 8761 | 0.0 | 0.0 | 0.0 |
2005 | 5182 | 0.0 | 0.0 | 0.0 |
2006 | 2715 | 0.0 | 0.0 | 0.0 |
2008 | 5410 | 0.0 | 0.0 | 0.0 |
2009 | 6799 | 0.0 | 0.0 | 0.0 |
2010 | 7832 | 0.0 | 0.0 | 0.0 |
2011 | 6857 | 0.0 | 0.0 | 0.0 |
2012 | 2538 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-11-19 | Lost Circulation | 23.00 | 23.00 |
1986-01-02 | Lost Circulation | 2713.00 | 2717.00 |
For data sources see[7]