X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635250604002

Well Details

Well ID: 0635250604002
Loading map...
Location: 00/04-06-063-25W5/2
Location Alias: 00/04-06-63-25 W5M
Location Alias 2: 00/04-06-063-25 W5/02
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 25
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI SIMON 4-6-63-25
Operator Name: Gain Energy Ltd.
License Number: 0020218
License Date: 1961-01-04
License Status: Issued
Spud Date: 1961-01-08
Final Drill Date: 1961-03-05
Well Total Depth: 3546.00 m
Surface Hole Latitude: 54.416343
Surface Hole Longitude: -117.779268

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-01-04 Obtained License
1961-03-05 Finished Drilling
1961-03-05 Well Mode changed to Drilled and Cased
1961-03-06 Drill Stem Test Performed
1961-03-11 Production Casing Operation Performed
1961-03-16 Perforation Treatment Performed - Open-Hole Completion
1961-04-02 Perforation Treatment Performed - Acid Wash - No Pressure
2000-12-02 Well Log Performed
2000-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-12-03 Perforation Treatment Performed - Jet Perforation
2000-12-03 Plug Back Performed
2000-12-03 Well Log Performed
2000-12-07 Perforation Treatment Performed - Cement Squeeze
2000-12-11 Perforation Treatment Performed - Cement Squeeze
2000-12-15 Perforation Treatment Performed - Jet Perforation
2000-12-15 Well Log Performed
2000-12-20 Perforation Treatment Performed - Fractured
2001-02-07 Well Began Production
2001-02-07 Well Fluid changed to Gas
2001-02-07 Well Mode changed to Flowing
2008-08-01 Well Fluid changed to Gas
2008-08-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-03-16 Open Hole/Barefoot Completion 3539.60 3546.00 0
1961-04-02 Acid Wash 3539.60 3546.00 0
2000-12-03 Packing Device Capped w/Cement 3359.00 3372.60 0
2000-12-03 Perforation 1830.00 1831.00 14
2000-12-03 Perforation 1779.00 1780.00 14
2000-12-07 Cement Squeeze 1830.00 1831.00 0
2000-12-11 Cement Squeeze 1779.00 1780.00 0
2000-12-15 Perforation 1805.60 1810.60 16
2000-12-20 Fracture 1805.60 1810.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 6997 0.0 0.0 0.0
2002 7466 0.0 0.0 0.0
2003 7553 0.0 0.0 0.0
2004 7698 0.0 0.0 0.0
2005 5776 0.0 0.0 0.0
2006 8481 0.0 0.0 0.0
2007 6802 0.0 0.0 0.0
2008 6549 0.0 0.0 0.0
2009 6479 0.0 0.0 0.0
2010 6417 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8287 0.0 0.0 0.0
2014 7940 0.0 0.0 0.0
2015 8095 0.0 0.0 0.0
2016 8060 0.0 0.0 0.0
2017 7800 0.0 0.0 0.0
2018 8740 0.0 0.0 0.0
2019 8497 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[5]

References