X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0635203613020

Well Details

Well ID: 0635203613020
Loading map...
Location: 02/13-36-063-20W5/0
Location Alias: 02/13-36-63-20 W5M
Location Alias 2: 02/13-36-063-20 W5/00
Country: Canada
Province: Alberta
Township: 063
Meridian: 5
Range: 20
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY 102 KAYBOB 13-36-63-20
Operator Name: Paramount Resources Ltd.
License Number: 0214504
License Date: 1998-04-01
License Status: Suspension
Spud Date: 1998-12-28
Final Drill Date: 1999-01-03
Well Total Depth: 1540.10 m
Surface Hole Latitude: 54.498248
Surface Hole Longitude: -116.894717

For data sources see[1][2]

Well History

Date Event
1998-04-01 Obtained License
1998-12-29 Surface Casing Operation Performed
1999-01-03 Finished Drilling
1999-01-03 Well Log Performed
1999-01-04 Well Log Performed
1999-01-05 Production Casing Operation Performed
1999-01-05 Rig Released
1999-01-05 Well Mode changed to Drilled and Cased
1999-01-29 Perforation Treatment Performed - Open-Hole Completion
1999-02-13 Perforation Treatment Performed - Jet Perforation
1999-03-07 Perforation Treatment Performed - Jet Perforation
1999-03-08 Perforation Treatment Performed - Cement Squeeze
1999-03-15 Perforation Treatment Performed - Jet Perforation
1999-03-15 Well Log Performed
1999-03-16 Well Log Performed
1999-03-23 Perforation Treatment Performed - Fractured
1999-04-19 Well Began Production
1999-04-19 Well Fluid changed to Gas
1999-04-19 Well Mode changed to Flowing
2002-06-01 Well Fluid changed to Gas
2002-06-01 Well Mode changed to Pumping
2007-01-18 Perforation Treatment Performed - Chemical Squeeze
2015-06-09 Well Fluid changed to Gas
2015-06-09 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-01-29 Open Hole/Barefoot Completion 1529.80 1540.10 0
1999-02-13 Perforation 1532.00 1539.00 12
1999-03-07 Perforation 1510.70 1511.00 24
1999-03-08 Cement Squeeze 1532.00 1539.00 0
1999-03-15 Perforation 1535.00 1537.00 20
1999-03-15 Perforation 1532.00 1535.00 20
1999-03-23 Fracture 1532.00 1535.00 0
2007-01-18 Chemical Squeeze 1532.00 1537.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5844 0.0 0.0 0.0
2000 7953 0.0 0.0 0.0
2001 7561 0.0 0.0 0.0
2002 7639 0.0 0.0 0.0
2003 7985 0.0 0.0 0.0
2004 8362 0.0 0.0 0.0
2005 8520 0.0 0.0 0.0
2006 2850 0.0 0.0 0.0
2007 7773 0.0 0.0 0.0
2008 8202 0.0 0.0 0.0
2009 7949 0.0 0.0 0.0
2010 8445 0.0 0.0 0.0
2011 8229 0.0 0.0 0.0
2012 7303 0.0 0.0 0.0
2013 7441 0.0 0.0 0.0
2014 5135 0.0 0.0 0.0

For data sources see[5]

References